You are on page 1of 1

LAPORAN PRODUKSI

TANGGAL : 03-Jun-23
ABSEN : ABSEN: ABSEN

PRODUKSI BACK PROSES


SHIFT PAGI SHIFT SIANG SHIFT MALAM
TOTAL TOTAL/DAY
DEPT MESIN A B C
PROSES (LOT)

OPERATOR EFF (%) PRODUKSI PRODUKSI PRODUKSI


OPERATOR EFF (%) PRODUKSI (BALE) OPERATOR EFF (%) PRODUKSI (BALE) EFF (%) EFF (%)
(BALE) (BALE) (BALE)

BLOWING JINSHENG
-
JW1 79,00% 0,98 79,00% 0,98
CARDING LINE 3

JW2 80,75% 1,00 80,75% 1,00


JW3 TC CGT SETIAWATI B 80,50% 0,99 80,50% 0,99 78,70% 4,86
JW4 77,38% 0,96 77,38% 0,96
JW5 75,88% 0,94 75,88% 0,94
96,78% 4,86 #DIV/0! 0,00 #DIV/0! 0,00 78,70% 4,86
LAKSHMI (1) 85% 1,76 85,39% 1,76
CARDING LINE 2

LAKSHMI (2) 94% 2,04 93,72% 2,04


CTN/TC LISNA
TC 11 (3) 73% 1,62 73,00% 1,62 84,04% 5,42
TC 11 (4) - 0,00
AVERAGE EFF / TOTAL 84% 5,42 #DIV/0! 0,00 #DIV/0! 0,00 84,04% 5,42
TC 1 64,00% 2,55 64,00% 2,55
CARDING LINE 1

TC 2 69,00% 2,63 69,00% 2,63


MSI / CGT DINI
TC 3 53,00% 2,38 53,00% 2,38 63,25% 10,41

TC 4 67,00% 2,86 67,00% 2,86


AVERAGE EFF / TOTAL 63% 10,41 #DIV/0! 0,00 #DIV/0! 0,00 63,25% 10,41
DF 1 CTN LISNA 46,65% 2,59 AI 64% 3,05 RIDWAN 57,77% 2,75 56,14% 8,39 56,14%
DRAWING TD 8 CTN/TC 59,00% 3,65 0,00 RIDWAN 34% 1,62 46,50% 5,27 46,50% 21,22
DF 2 TC CGT SETIAWATI B 55,00% 2,62 ARMAN 34,17% 1,63 ARIF 69,46% 3,31 52,88% 7,56 52,88%

OPEN END

SHIFT PAGI SHIFT SIANG SHIFT MALAM


TOTAL TOTAL/DAY
OE SIDE PROSES DAN LOT A B C

OPERATOR EFF (%) PRODUKSI PRODUKSI PRODUKSI


OPERATOR EFF (%) PRODUKSI (BALE) OPERATOR EFF (%) PRODUKSI (BALE) EFF (%) EFF (%)
(BALE) (BALE) (BALE)
R TC CGT 1203 SYIFA 89,30 2,60 89,30 2,60
2
L MSI/TC CGT 7033/1021 RONI 93,70 3,41 93,70 3,41
R CA CGT/CTN 7033/3407 YANTI 87,60 7,19 87,60 7,19 81,85 16,71
3
L MSI 5010 ALDI 56,80 3,52 56,80 3,52
AVERAGE EFF / TOTAL 81,85 16,71 #DIV/0! 0,00 #DIV/0! 0,00 81,85 16,71
PACKING

SHIFT PAGI SHIFT SIANG SHIFT MALAM


TOTAL TOTAL/DAY
DEPT NE PROSES DAN LOT A B C

OPERATOR BAGS PRODUKSI PRODUKSI


OPERATOR BAGS PRODUKSI (BALE) OPERATOR BAGS PRODUKSI (BALE) BAGS BAGS BALE
(BALE) (BALE)
10 MSI 5010 50 8,33 0,00 0,00 50 8,33
10 TC CGT 1021 0,00
12 TC CGT 1203 5 0,83 0,00 0,00 5 0,83
PACKING

7 TC CGT 247 SUMPENA 0,00 0,00 0 0,00


85,00 15,17
7 CA CGT 753 30 6,00 0,00 0,00 30 6,00
7 STI 702 0,00 0,00 0,00 0 0,00
7 CTN 3307 0,00 0,00 0,00 0 0,00
85,00 15,17 TOTAL 0,00 0,00 TOTAL 0,00 0,00 85,00 15,17

ALARM SHIFT PAGI SHIFT SIANG SHIFT MALAM TOTAL ALARM SHIFT PAGI SHIFT SIANG SHIFT MALAM TOTAL
FEED ROLLER 7 7 FEED ROLLER 0
FEED SENSOR 14 14 FEED SENSOR 22 22
STOP PAGE DRAWING

SCANNING ROLLER 0 SCANNING ROLLER 2 2


CALENDEROLLER 0 CALENDER ROLLER 0
DF 1 WEB GUIDE 17 17 DF 2 WEB GUIDE 32 32
COILER 6 6 COILER 6 6
DRAFT CALLROLL 2 2 DRAFTCALLROLL 2 2
AUTOLEVEL 0 AUTOLEVEL 1 1
OVERLOAD 0 SLV MONITORING 0
SERVO DRIVE 1 1 SERVO DRIVE 0

WASTE SLIVER BP SLIVER OE SHIFT


WCS WCS CD
SHIFT TC WCS CD TC BLOWER OE JOSSY LINE LKM JOSSI LINE TRZ REJECT PRODUKSI TOTAL
CARDING JW LAKSHMI CA MSI STI MSI TC CA CTN A B C
CGT
BENANG RING 0
PAGI 81 58 71,90 419,00 3,20 5,60 4,20 75,30 8,90 63,50
BENANG KECIL 2 2
DATA WASTE

MOIRE 0

SIANG
SILANG 3 3

BELANG 0
KONTAMINASI 1 1
MALAM BENANG BESAR 0
BENANG RUSAK 0
TOTAL 81,00 58,00 71,90 0,00 0,00 0,00 419,00 3,20 5,60 4,20 0,00 75,30 8,90 63,50 KOTOR BIJI KAPAS 0

TOTAL/DAY 6

KETERANGAN PRODUKSI :
SHIFT PAGI
LINE TC
1 CD ADA STOP UNTUK CLEANING RUTIN K.SHIFT PAGI
2 MOTOR DUST BAWAH WCS BLOWING J(JINSHENG) SUDAH DIPERBAIKI

LINE LAKSMI
1 CD3 ADA STOP 1X TCON
2 DF1 ADA PERBAIKAN MOTOR CAN CHANGER GESER

LINE JW
1 CD ADA STOP TUNGGU MIXING MATERIAL
A
2 CD ADA STOP UNTUK CLEANING RUTIN MTC

OPEN END
1 OE2 SIDE L PROSES MSI GESER TERUS DENGAN TC CGT
2 OE3 SIDE R ADA PROSES CTN 20 SPINBOX
3 AGAR DI FOLLOW UP TERUS MASALAH KOTOR NYA MESIN NO 2 SIDE L/R PROSES TC CGT PASTIKAN PIPA ANGIN MENGARAH KE AREA YANG KOTOR. DENI

SHIFT SIANG
K.SHIFT SIANG
LINE TC
1
2
3
4

LINE LAKSMI
1
2
3

LINE JW
B
1
2
3
4

OPEN END
1
2 ERWIN
3
4

SHIFT MALAM
LINE TC K.SHIFT MALAM
1
2
3

LINE LAKSMI
1
2
3
4 C
LINE JW
1
2

OPEN END
1
2
3 YOZIL EFATMI