TECHNICAL PASSPORT
INSTALLATION and OPERATION MANUAL
v0.1
model:
serial number:
TABLE OF CONTENTS
1. Explanation of symbols and safety instructions ............................................... 3
1.1. Explanation of symbols ........................................................................................ 3
1.2. Requirements to collector installation place ....................................................... 3
1.2.1. Instructions to collector installer.......................................................................... 3
1.2.2. Instructions to installation user ........................................................................... 4
2. Description of flat-plate collector PK ................................................................... 4
2.1. Absorber coating ................................................................................................. 4
2.2. Heat-carrier pipe system....................................................................................... 4
2.3. Protective heat-tempered solar glass Durasolar® P+ ........................................... 4
2.4. Insulation ............................................................................................................. 5
2.5. Durable construction ........................................................................................... 5
3. Description of evacuated-tube collector VTC ...................................................... 5
3.1. Evacuated tube. Absorber coating ....................................................................... 5
3.2. Heat-carrier pipe system ...................................................................................... 5
3.3. Temperature sensor ............................................................................................. 6
3.4. Heat transfer plates ............................................................................................. 6
4. Transportation of the collector .......................................................................... 6
5. Delivery of the collector ..................................................................................... 6
6. Installation ........................................................................................................... 8
6.1. Installation of flat-plate collector РК .................................................................... 9
6.2. Installation of evacuated-tube collector VTC ..................................................... 10
6.3. Connecting multiple collector series ................................................................. 12
7. Connect the collector to the hot water system and / or central heating ........... 13
7.1. Protecting collector of lightning, hail, frost, overheating .................................. 13
7.2. Manifold connections ........................................................................................ 14
7.3. Stagnation temperature..................................................................................... 15
7.4. Mounting the temperature sensor vacuum tube collector VTC ........................ 15
7.5. Installation of safety valve for temperature ....................................................... 16
7.6. Pressure. Temperature control. Venting .................................................................. 16
7.7. Filling the installation .................................................................................................. 16
7.8. Connection diagrams .................................................................................................. 17
8. Commissioning ............................................................................................................. 21
9. Prevention and maintenance of collectors .............................................................. 21
10. Warranty terms ............................................................................................................ 21
11. Technical features ........................................................................................................ 23
11.1. Technical features of Flat-plate collector РК ........................................................... 23
11.2. Technical features of Evacuated-tube collector VTC .............................................. 25
12. Recycling ........................................................................................................................ 27
2
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 3.
Solar-grade heat tempered glass
Durasolar® P+. The glass used in Diagrаm 5
SUNSYSTEM flat-plate collectors is Evacuated tubes are two concentrically
distinguished by decreased iron content positioned borosilicate glass tubes
providing for better transparency to enclosing a gap of evacuated air. The
the sun rays. Durasolar® P+ has prism- internal glass tube is coated on its external
textured surface, which directs even the surface with an environmentally friendly,
rays reaching the glass in unfavorable highly selective layer and thus functioning
angle straight to the absorber. as an efficient absorber.
2.4. Insulation of rock wool keeps the 3.2. Heat-carrier pipe system
heat from leaving the collector body.
Diagrаm 6
Copper heat-carrier tubes type Heat Pipe
TU 1. The pipe system is manufactured
Diagram 4 with a minimum number of welds for
The collector case is made of robust perfect air-tightness and reduced deposits
aluminum frame, and the bottom is made accumulation possibility.
of embossed aluminum sheet. This way Heat Pipe technology is characterized by
the collector body has the necessary its high efficiency:
constructive strength to withstand improved heat-absorbing capacity of
the year-round whims of weather not collector, low heat losses and stable
sacrificing on light-weight. performance in harsh climate conditions.
5
Downloaded from www.Manualslib.com manuals search engine
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL TE
Table 1
РК type Collector VTC type Collector
Check whether protective glazing is Check to assure that evacuated tubes are all intact and the
intact bottom of each tube is still silver-colored. If a tube has a
white clear bottom, that means it is damaged and should
be replaced. As soon as the evacuated tubes are removed
from the box, please put on the rubber tube caps, found
inside the manifold box. This will protect the bottom tip of
the glass tube from breaking on impact
Both outlets of Manifold pipe wear Both outlets of Manifold pipe are fit with plastic
plastic protectors. Remove inlet/ protectors. Remove inlet/outlet pipe plastic protectors
outlet pipe plastic protectors before before connecting collectors to system.
collector connection to system.
Before installing PK type collectors, Do not take out or expose the tubes to sunlight during in-
remove the protective plastic cor- stallation, otherwise the inner tube and heat transfer fin
ners from collector frames. will become very hot.
Delivery includes: It may be necessary to purchase bolts
1) PK type Collector or VTC type Collector. or other fasteners to suit the installation
2) Technical passport. User manual. surface.
3) Warranty card Delivery of collector PK type includes:
If any of the above items are missing, Flat-plate collector PK Standard CL or Flat-
contact your supplier. plate collector PK Select CL
Delivery of Evacuated-tube collector VTC type includes:
Diagram 8
6. INSTALLATION Table 2
Must be performed by an autho- Recommended
Collector application mounting angle
rized service technician/service
shop for such operations. Domestic Hot Water /
DWG+pool 30°÷45°
DANGER of slipping. In most cases, Domestic Hot Water
collectors are installed in hardly ac- + Central Heating / 45°÷60°
cessible and dangerous places. We DWG+CH+pool
recommend that installation and
service maintenance be carried out
Avoid shading from neighboring buildings,
trees, collectors etc.
by an authorized service technician
The applicable minimum clearances in
observing all safety measures.
your country may differ from the ones
Danger of burns during installation specified bellow. Please, consult your
and maintenance of solar collector: installer. The minimum distance from the
We recommend the use of protec- collector construction to roof end must be
tive equipment, gloves, eyewear at least 1 meter;
(goggles), clothing. The collector should be positioned as close
Installation and servicing of collec-
tors should be carried out in early
as possible to the DWG /CH consumer
to minimize heat loss. Efficiency heat
morning hours. While the collec- transfer pipes insulation is recommended.
tors are still cold you can cover
them with tarpaulin to avoid their
heating by direct sunlight.
Recommendations:
The collectors can be installed in places
where the values for:
wind load Vm (mean wind speed) does
not exceed 150 km/h and snow loads Sk
(weight of snow mass) does not exceed
1,25 kN/m, according to ENV 1991-1-3
and 1991-1-4.
Recommended orientation: Diagrаm 9
Facing the equator
Recommended mounting angle: 10 ° ÷ 90° Collector support must be grounded to
according to collector application. the buiding grounding system.
Installation of collector on a special
support must be in one single plane.
8
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 10
Flat-plate solar collector РК can be
with vertical or horizontal orientation.
Collectors are mounted on specially
designed support systems, adapted to
different roof slopes.
Diagram 12
Installation is carried out by at least two
people.
We recommend consulting with a roofing
expert.
Fix the support onto the roof as indicated
in the Collector Support Installation
Instructions.
On sloped roof the collector slope must
coincide with roof slope angle.
Place the collector on the support.
Diagram 11 Fix the collector to support using the
Installation is carried out by at least two clamping clips.
people. We recommend consulting with Make sure all connections are properly
a roofing expert. Mount the support onto secured and will not loosen under harsh
the roof according to the the Collector weather conditions.
Support
9
Downloaded from www.Manualslib.com manuals search engine
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL TE
6.2. Installation of VTC type evacuated- placing the manifold on the top and the
tube collectors. rubber protectors in the bottom part.
Evacuated tube collectors are mounted Such collectors have vertical orientation.
Diagram 13
Collectors VTC type are mounted on specially designed support systems, adapted to
different roof slopes.
Diagram 14
6.2.1. Flat roof VTC type collector Fix the support onto the roof as indicated
installation in the Collector Support Installation
Instructions. Adjust the support angle as
needed.
Onto the support stand mount the
collector frame with manifold and pipe
holders. Fix the collector to support
using the clamping clips. Make sure all
connections are properly secured and
will not come loose under harsh weather
conditions.
Diagram 15
Evacuated tubes are installed last, after
Installation is carried out by at least two the system has been connected and
people. tested for leakage.
We recommend consulting with a roofing
expert.
10
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
6.2.2. Inclined roof VTC type collector other the two side rails F.
installation For each rail put two silicone pads K, in
places where the bar rests on the roof tile.
Install the two side rails F to fixing straps
B. Use the screws and therefore provided
orifices in the rails. /Diagram 17/
G
F
C
B K
A
K
Diagram 18
Diagram 17
Step 1. Install the four fixing straps B to
the roof using the screws G. /Diagram 17/
Diagram 20
Diagram 21
12
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 22
• Collector protection against hail,
Table 4 strong wind and snow mass. Each solar
collector is tested for resistance to harsh
Collector Distance L between
the rows weather conditions:
mounting angle Collector orientation - Hail resistance: size up to 25 mm /1”
ɑ V, m H, m when collector mounting angle is ≥40°.
25° 4,7 2,6 In areas with frequent hailstorms it is
recommended to install a protective net
30° 5,2 9
over collectors.
35° 5,2 3 - Strong wind resistance: wind speed up
40° 6 3 to 120 km/h
45° 6 3,5 In areas with strong, steady winds it is
50° 6,5 3,6 recommended to further strengthen the
collector support fixation to the building
55° 6,7 3,7
structure, as well as frequent inspection
60° 7 3,8 to prevent any loosening of connections.
- Snow mass resistance: load up to 30 cm
Diagram 23
– 1.25 kN/m2
13
Downloaded from www.Manualslib.com manuals search engine
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL TE
Diagram 25. Connection of Flat-plate collector РK to solid fuel boiler WBS, combi tank KSC2 and
three-way valve
17
Downloaded from www.Manualslib.com manuals search engine
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL TE
Diagram 26. Connection of Evacuated-tube collector VTC to solid fuel boiler WBS, combi tank
KSC2 and three-way valve
18
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 27. Connection of Flat-plate collector РK to solid fuel boiler WBS, solar water tank
SON, buffer tank P and three-way valve
19
Downloaded from www.Manualslib.com manuals search engine
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL TE
Diagram 28. Connection of Flat-plate collector РK to solid fuel boiler WBS, solar water tank
SON, buffer tank P and three-way valve
20
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
1. Aluminum casing
2. Silicon seal
3. Protective solar glass
4. Absorber with selective coating
(PK Select)
Or with black solar coating (PK
Standard)
5. High efficiency insulation
6. Bottom of the collector
7. Absorber pipe harp
8. Inlet/Outlet sleeve
9. Corner protector
10. Connection thread R ½” (CL
model)
11. Connection „New Line“ Cu ø 22
(NL CL model)
24
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
1. Manifold
2. Inlet/Outlet sleeve
3. Evacuated glass tube
4. Holder and protector of evacuated glass tube
5. Frame of VTC collector
6. Temperature sensor sleeve
25
Downloaded from www.Manualslib.com manuals search engine
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL TE
26
Downloaded from www.Manualslib.com manuals search engine
AL TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
27
Downloaded from www.Manualslib.com manuals search engine
ISO 9001:2008
BUREAU VERITAS
Certification
www.sunsystem.bg