TRANSMISSION CONSTRUCTION STANDARD TCS-P-107.01, Rev. 01
TABLE OF CONTENTS
1.0 SCOPE
2.0 ORGANIZATION
4.0 ALARMS
5.0 INDICATIONS
6.0 COMMANDS
7.0 MEASURANDS
License=Al Gihaz Holding Co./SA-938-t Not For Resale ,4/16/2019 7:45:20 AM Saudi Time
TRANSMISSION CONSTRUCTION STANDARD TCS-P-107.01, Rev. 01
1.0 SCOPE
This Construction Standard discuss the preparation of SAS Point List for verification for
Supervisory Control and Data Acquisition (SCADA) System For Transmission Substations
with Substation Automation System (SAS) of National Grid SA.
1.1 Acronyms
BCPU: Bay Control Protection Unit
BCU: Bay Control Unit
BPU: Bay Protection Unit
CT: Current Transformer
HMI: Human Machine Interface
IEC: International Electrotechnical Commission
IED: Intelligent Electronic Device
LDC: Local Dispatch Center
OHL: Overhead Line
SAS: Substation Automation System
SCADA: Supervisory Control and Data Acquisition
SLD: Single Line Diagram
TB: Terminal Block
Type ID: Type Information Identification
T/NT: T-Trip / NT-Non Trip
UGF: Underground Feeder
VT: Voltage Transformer
2.0 ORGANIZATION
SAS Point List is divided into six sections as following:
1. Alarms
2. Indications
3. Commands
4. Measurands
5. General Alarms
6. SAS Alarms
License=Al Gihaz Holding Co./SA-938-t Not For Resale ,4/16/2019 7:45:20 AM Saudi Time
TRANSMISSION CONSTRUCTION STANDARD TCS-P-107.01, Rev. 01
4.0 ALARMS
Information to be filled for alarms are given in Table 01-1. Information such as Text,
LITRA received at Control Center, Address extra shall be filled based on TES-P-107.02
(latest revision). Other information such as IEC 61850 Address/ Identifier etc., shall be filled
up as required for the project.
5.0 INDICATIONS
Information to be filled are given in Table 01-2, and it is similar to alarm list.
6.0 COMMANDS
Information to be filled are given in Table 01-3, and this is similar to alarm list.
7.0 MEASURANDS
Information to be filled are covered in Table 01-4, and this is similar to alarm list
License=Al Gihaz Holding Co./SA-938-t Not For Resale ,4/16/2019 7:45:20 AM Saudi Time
TRANSMISSION CONSTRUCTION STANDARD TCS-P-107.01, Rev. 01
License=Al Gihaz Holding Co./SA-938-t Not For Resale ,4/16/2019 7:45:20 AM Saudi Time
TRANSMISSION CONSTRUCTION STANDARD TCS-P-107.01, Rev. 01
License=Al Gihaz Holding Co./SA-938-t Not For Resale ,4/16/2019 7:45:20 AM Saudi Time
TRANSMISSION CONSTRUCTION STANDARD TCS-P-107.01, Rev. 01
License=Al Gihaz Holding Co./SA-938-t Not For Resale ,4/16/2019 7:45:20 AM Saudi Time
TRANSMISSION CONSTRUCTION STANDARD TCS-P-107.01, Rev. 01
Notes:
1. In the beginning of each SAS Points List, there shall be a Cover Sheet and an Index
Sheet.
2. SAS Points List shall be prepared in Excel spread sheets format with separate sheet
for each section (Alarms, Indications, Commands etc.) in unprotected mode.
3. Frame for each page of the SAS Points List shall include the design consultant official
logo, sheet number, project title and revision number.
4. Numbered separators with a proper index shall be used between different voltage
levels, alarms, indications, commands, measurements, general alarms, SAS alarms
and regulation commands.
5. Each section (Alarms, Indications, Commands etc.) shall have different sheet for
different voltage level.
6. Bay Number shall be in numerical order. Left to right arrangement of the bays shall
be considered as per approved SLD.
7. Reference for “Control System Data” column shall be obtain from respective Projects
Department or Control System Division area wise.
8. Open Loop Test and Close Loop Test columns are intended for Testing and
Commissioning stage of each project.
9. Signal Point List shall be submitted on an A3 size paper with a readable font type and
size.