Professional Documents
Culture Documents
4. TEV study for Hotel Project at Rajapalayam, Tamilnadu Saravanan Palaniappan 2017 Client
5. TEV study for the proposed Solar Power Project Siddharth Energy Pvt. Ltd 2017 Client
6. TEV study on the Steel Wire Drawing Unit KPL Steel (P) Ltd 2017 Indian Bank
10. TEV Study for Bafna Pharmaceuticals ltd Bafna Pharmaceuticals Ltd 2017 SBI
11. TEV Study for Sar Ispact Pvt. Ltd Sar Ispact Pvt. Ltd 2017 SBI
18. TEVR for Allied Silica Ltd Allied Silica Ltd, Cuddalore 2017 SBI
23. TEVR for Enlivening Technologies Pvt. Ltd, Bangalore Enlivening Technologies Pvt. Ltd 2017 Client
24. TEV report for Hotel Project at Kukke Subramanya Ganjam Hospitality Pvt. Ltd 2017 Client
36. TEV study for MGM Healthcare Pvt. Ltd, Chennai MGM Healthcare Pvt. Ltd 2017 Indian Bank
TEV study for establishing manufacturing unit of LED & Polymatech Engineering Pvt. Ltd/
37. 2017 SBI, Chennai
LED Bulbs at Oragadam, Chennai Sensa Electronics
TEV study for 2 MW Solar Power Project at Yerangaligi
38. Mr. T.G. Yerryswami 2017 Client
Bellary District, Karnataka
INDICATIVE LIST OF TECHNO ECONOMIC VIABILITY STUDY
52. TEV study for International School at 7 Locations Ravendra Bharathi Educational Trust 2017 Client
60. Cluster study for Auto Components At Hosur State Bank of India, Chennai 2017 SBI, Chennai
61. Cluster study for Home Textile Cluster at Karur State Bank of India, Chennai 2017 SBI, Chennai
TEV study for 3.00 MW Solar PV Power Project in Pristine Solar Park Pvt. Ltd,
62. 2017 Client
Karnataka Bangalore
TEV study for Senthik global Exports and Imports, Senthik Global Exports and Imports,
63. 2017 Client
Chennai Chennai
TEFR for diversification of TNA Plant to Manufacture
64. Tamilnadu Cements Corporation Ltd 2017 Client
Alumina Refractory fire bricks at TNA Sheet - Alangulam
INDICATIVE LIST OF TECHNO ECONOMIC VIABILITY STUDY
65. TEFR for the expansion of SWPF, Virdhachalam Tamilnadu Cements Corporation Ltd 2017 Client
66. TEV study for Easun Reyrolle Ltd Easun Reyrolle Ltd 2017 Client
TEV study for 100 Bed Hospital and Rescheduling of the Banumathi Thambidurai Hospital & Client
77. 2017
Existing Term Loan of BTHR Research, Chennai
INDICATIVE LIST OF TECHNO ECONOMIC VIABILITY STUDY
TEV study for establishing manufacturing electrical Siechem Technologies Pvt. Ltd, SBI, Overseas Branch,
78. 2017
cables unit at Pondicherry, TN Chennai Chennai
TEV study towards establishing of Iron Castings Unit at
79. Nelcast Limited, Chennai 2017 SBI, Chennai
Pedapariya, Nellore District, AP
80. TEV study for Bafna Pharmaceuticals Ltd Bafna Pharmaceuticals Ltd 2017 SBI, Chennai
Client
81. TEV study on Tomoto Puree Diksha Green Ltd, Kolkata 2017
85. TEV study for Allied Silica Ltd Allied Silica Ltd, Chennai 2017 SBI, Chennai
DPR /TEV study for implementation of Solar Rooftop Karnataka Renewable Energy
91. Projects on the Govt. Hospital in Tumkurur District- Development Ltd (KREDL), 2017 Govt. of Karnataka
Chikkanayakanahalli Taluk Bangalore
TEV study for the Swastik Oil Refinery Pvt. Ltd, West
92. Swastik Oil Refinery Pvt. Ltd 2017 Andhra Bank, Kolkata
Bengal
Gokilambal Educational and Indian Bank,
93. TEV study for Gokilambal Educational Trust 2017
Charitable Trust, Ariyalur Kumbakonam
TEV study for 5/25 Flexible Restructuring study for
94. Adyar Gate Hotels ltd 2017 Indian Bank, Chennai
Adyar Gate Hotel
TEV Report for setting up a Sea Food Park at
95. JMJ Exports, Chennai 2017 Indian Bank, Chennai
Kanyakumari
96. TEVR for Gowri Hospital, Chennai Gowri Hospital, Chennai 2017 SBI, Chennai
97. TEV study for NSL Sugars (Tungabhadra ) Ltd Canara Bank, Hyderabad 2017 Canara Bank, Hyderabad
98. TEV study for NSL Sugars (Krishnaveni) Ltd Canara Bank, Hyderabad 2017 Canara Bank, Hyderabad
TEV study for setting up of International School at Thamarai Thai Educational & Syndicate Bank,
99. 2017
Coimbatore Charitable Trust, Coimbatore Coimbatore
100. TEFR on High Precision Manufacturing Unit Q2Q Solutions Pvt. Ltd, Chennai 2018 State Bank of India
TEV study for Cheese Processing Plant and Milk Chilling Milky Mist Dairy Foods Pvt. Ltd,
101. 2018 Indian Bank, Coimbatore
Centres of Milky Mist Foods Pvt. Ltd, Erode, TN Erode
United Chloro Paraffins Pvt. Ltd, SBI, Sam Branch,
102. TEV study on Cholorianted Paraffins, Kolkata 2018
Chennai Kolkata
TEV study towards the proposed Crystalline Fructose International Ingredients &
103. 2018 Andhra Bank, Chennai
Manufacturing unit located at Sri City, Andhra Pradesh Excipients Pvt. Ltd
INDICATIVE LIST OF TECHNO ECONOMIC VIABILITY STUDY
104. TEV study for Packaging Unit Shansco Packaging Pvt. Ltd, Chennai 2018 CBI, Chennai
106. TEV study for Restructuring of Chitralaya Mall Grandhi Theaters Pvt. Ltd 2018 Andhra Bank, Vizag
TEV study on 500 bedded Super Specialty Hospital Royal Care Super Specialty Hospital
107. 2018 SBI, Coimbatore
Expansion Project of Royal Care, Coimbatore Ltd
108. TEV study for the proposed IDC Centre in Chennai VREON Technologies 2018 Client
109. TEV Report for the Hotel Project at Pudukottai, TN NK Heritage 2018 PNB, Chennai
117. TEV study for the proposed Office Complex in Bangalore Nitin Bagamane, Bangalore 2018 Client
TEV study on 500 Bedded Super Specialty Hospital Royal Care Super Specialty Hospital
118. 2018 Client
expansion Project at Coimbatore Ltd, Coimbatore
TEV / Restructuring study for the existing Aluminium
KVB, Ramapuram
119. Alloy Ingot Manufacturing Unit located at Cheyyar, Sargam Metals Pvt. Ltd, Chennai 2018
Branch, Chennai
Tamilnadu
120. TEV Study for the proposed Residential Villa Project AA Walker Estates Pvt. Ltd 2018 Client
121. TEV study of Rooftop Solar Under RESCO Model Shiroi Energy 2018 PNB, Chennai
124. TEV study on Shrimp Processing Unit at Bhimavaram Welcome Fisheries Ltd, Chennai 2018 Client
135. TEV study for the Residential D& E Blocks of Project Kalyani Techpark Pvt. Ltd 2019 Client
TEV study for the Manufacturing Unit located at Union Bank of India,
142. Womenova Agro Food Park Ltd 2019
Ghanapur Village Hyderabad
TEV study for Engineered Quartz Slab Manufacturing
143. Quartzkraft LLP 2019 SBI, Guntur
unit at BPSEZ at Ongole
TEV study for High-end Oncology Hospital with Proton
144. Apollo Hospital Enterprise Ltd 2019 Axis Bank, Chennai
Therapy for Apollo Proton
TEV study for setting up of International School at
145. Sharada Educational Trust 2019 Client
Koppal, Karnataka
TEV study for Shrimp processing unit with Installed
capacity of 11,610 KGPH with farm level infrastructure Union Bank of India,
146. Sandhya Aqua Exports Pvt. Ltd 2019
and distribution hub with 1700 MT Cold Storage and Vizag
reefer / Insulated
TEV study for Restructuring of Granite Company located Allahabad Bank,
147. Nikunj Exports 2019
at Ongole Hyderabad
TEV study for manufacturing of Pharma products Allahabad Bank,
148. Leo Star Healthcare Pvt. Ltd 2019
(Tablets, Capsules, Syrups & Ointments) Hyderabad
TEV study for Active Pharma ingredients manufacturing
149. Vineeth Life Science Pvt. Ltd 2019 SBI, Guntur
located at Siddipet, Telangana
TEV for Restructuring the company – manufacturing of
150. Agricultural weeder, power, sprayer, engine, pumpset, South Agro Engine Pvt. Ltd 2019 IOB, Chennai
power tiller etc. situated at Guindy & Papamchathiram
TEV study for 29.45 MW Railway Rooftop Solar Project
151. STPL Horticulture Pvt. Ltd 2019 SBI & PNB
in 4 Zones
TEV study for L& T Eden Park – Phase 2 B located at
152. L&T South City Projects Pvt. Ltd 2019 Client
Siruseri
TEV (Restructuring) study on Multiplex with four screens Punjab National Bank,
153. Kasi City Park 2019
and retail area Chennai
INDICATIVE LIST OF TECHNO ECONOMIC VIABILITY STUDY
154. TEV ( Restructuring) study on PVC Pipes Vijay Aqua Pipes Pvt. Ltd 2019 IOB, Chennai
155. TEV study on Manufacturing of GI Pipes in Guntur, AP Reddson Seamless Pipes Pvt. Ltd 2019 Punjab National Bank
TEV study for restructuring of KPL Steels Pvt. Ltd Bank of Maharashtra,
159. KPL Steels Pvt. Ltd 2019
Madurai
TEV study for manufacturing IV Fluids and other
160. injections Dhanvantra Healthcare Care Pvt. Ltd 2019 Client
164. Independent Opinion Report / Cost Vetting Seshasayee Paper and Boards Ltd 2019 SBI, IFB, Chennai
TEV for restructuring the existing loans of Rajshree Sugars and Chemicals
177. Rajshree Sugars and Chemicals Ltd 2020 State Bank of India
Ltd
INDICATIVE LIST OF TECHNO ECONOMIC VIABILITY STUDY
184. TEV on Rooftop Solar PV Power plant MB Green Energy Private Limited 2020 State Bank of India
INDICATIVE LIST OF TECHNO ECONOMIC VIABILITY STUDY
194.
TEV on Hospital project with 75 beds Spero Hospital Pvt. Ltd 2021 Indian Bank
TEV for Six laning of Thalapady to Chengala The Uralungal Labour Contract
197. section of NH-17 on HAM in the State of Kerala Co-operative Society Ltd (ULCCS 2021
Ltd)
TEVR on Restructuring of 10 MW Ground mounted
198. Solar PV power plant located at Nokha Daiya, Trimex Sands Private Limited 2021 Indian Overseas Bank
Bikaner District, Rajasthan
Powder
207. TEVR on Multiplex project at Hosur, Tamil Nadu Grand Cinemas 2021 TIIC
TEVR on proposed Medical College and Hospital at St. Peter Institute of Higher
212. Hosur (for revised COD) 2021 Indian Bank
Education and Research
TEVR for establishment of 20 MW Solar Power
213. project at Shiggaon, Karnataka Aavanti Solar Energy Pvt. Ltd 2021 Union Bank of India
TEVR for expansion of UHT Dairy products Milky Mist Dairy Food Private
237. 2022 Indian Overseas Bank
Limited
TEVR on establishment of Institutional Building for
accommodation for female students with a
Smt. Shakuntala Educational &
238. capacity of 346 beds named as Galgotias Girls 2022 Punjab National Bank
Welfare Society
Hostel 'C' located in Greater Noida, Uttar Pradesh