Sr.
Project details, Company Name , Location and Consultant
No.
A) INDUSTRIAL
01. Civil & Structural Works for Nutraceutical Plant at Mambattu, Andhra Pradesh for Tata Chemicals Ltd.
Consultant: Jacobs Engineering India Pvt. Ltd.
Civil, Structural and Architectural Works of SPARKLE2 Plant at Panoli, Gujarat for Solvay Specialities
02. India Pvt. Ltd.
Consultant: Tecnimont Pvt Ltd
Civil & MEP works for Construction of Factory Building for Topband India Pvt Ltd at Chakan Phase-2,
03. Pune.
Consultant: Archivista Consultants Pvt. Ltd.
04. Civil & Structure for proposed Auto GI & Resin manufacturing facility for Berger Paints at Jejuri,Pune.
Consultant: C. R. Narayan Rao.
Civil, Architectural, Structural and Interior for RDQ project at Thane, Mumbai for Mondelez India Foods
05. Pvt. Ltd.
Consultant: Jacobs Engineering India Pvt. Ltd.
Civil & structural Construction of Phase-3 for Proposed textiles Unit at Amreli District, Gujarat for Sintex
05. Industries Ltd.
Consultant: Pratap Parikh Associates
Civil Construction and Infrastructure development work for the proposed MDF2 plant at Chittor Dist.,
07. Andhra Pradesh for Greenply Industries Limited.
Consultant: Mott MacDonald.
Civil & Structural works for expansion of Fibre glass plant at MIDC Phase II, Taloja , Raigad for Owens
08. Corning (India) Pvt Ltd.
Consultant: Jacobs Engineering India Pvt. Ltd.
Site Development & Civil works for Corn silo storage Plant at Plant at Davangere, Karnataka for Cargill
09. India.
Consultant: IPS - Mehtalia.
Civil, Structural & Allied works for Integrated Consumer goods Manufacturing Facility, Trichy, Tamil Nadu
10. for ITC LTD.
Consultant: C. R. Narayan Rao.
Category: Turnkey, Design and Build Projects
Sr.N
Name of the Project and Location Remark.
o.
Civil works for Engine and Transmission Plant expansion at Manesar,
Completed in time.
01. Haryana for Maruti Suzuki India Ltd. YEAR: 2016-2017.
Design & Build
Design and Construction of Main Plant (Rubber Plant) at Shirwal, Maharashtra for Completed in time.
02.
M/s. Nipro India Corporation. YEAR: 2013-2014.
Design and Build Component Test Lab at Pune, Maharashtra for Completed in time.
03.
M/s. Bajaj Auto. YEAR: 2012-2013.
Design and Build Factory Complex at Savali, Vadodara for Completed in time.
04.
M/s. FAG Bearings – a Schaeffler Group Co. YEAR: 2012-2013.
Warehouses at Paradip, Odisha for Completed in time.
05.
M/s. Indian Oil Corporation. YEAR: 2011-12.
Completed in time in 04
Expansion of Two Wheeler Plant at Pantnagar, Uttarakhand for
06. months.
M/s. Bajaj Auto Ltd.
YEAR: 2011-12.
Civil, Structural and MEP Works of manufacturing plant at Ranjangaon for Completed in time in 10
07. M/s. Jabil Circuit India Pvt. Ltd. months.
Consultant: M/s. Dandekar and Associates, Pune. YEAR: 2007-08.
Completed in time in 12
months.
YEAR: 2006-2007.
Design and Construction of Factory Building at Pantnagar, Uttarakhand for Safety Award by National
08. Safety Council of India for
M/s. Bajaj Auto Ltd. developing & implementing
effective OSH management
systems and procedures &
achieving good performance.
Completed in time in 8 months.
YEAR: 2006-07.
BAI has awarded Pune
project for “Best of Best
Civil and Electro-Mech works on single point responsibility for Factory Building and Structure”, “Well Equipped &
other facilities for Roll Forming and Frame Fabrication Plants at Mechanized Project” and by
a. Pune (Maharashtra) AESA for “Best Construction
09. b. Bhiwadi (Rajasthan) Management”
c. Chennai (Tamil Nadu), for Safety Award by
M/s. Tata BlueScope Steel Ltd. National Safety Council of
Consultant: M/s. Dalal Mott MacDonald, Noida. India for developing &
implementing effective OSH
management systems and
procedures & achieving good
performance.
Design and Construction of Factory Building at Chakan, Maharashtra for Completed in time in 6 months.
10.
M/s. Bajaj Auto Ltd. YEAR: 2006-07.
Design and Construction of Beverage Plant and Procurement Services for Utilities
and Electricals at
Completed in time in 5 months.
11. a. Jaipur b. Hyderabad, Pune Vijayawada
YEAR: 2002-03.
b. Delhi (Ghaziabad), for
M/s. Hindustan Coca-Cola Beverages Pvt. Ltd.
Design and Construction of Beverage Plant and Procurement Services for Utilities
12. Completed in time in 6 months.
and Electricals at Tirupati for
YEAR: 2002-03.
M/s. Laxmi Balaji Bottling Pvt. Ltd.
Design and Construction of Beverages Bottling Plant in Bhutan for Completed in time in 7 months.
13.
M/s. Bhutan Beverages Co. Ltd. YEAR: 2001-02.
Completed in time in 6 months.
Construction of Factory Building at Pirangut, Pune for
‘Quality, Speed and Economy’
14. M/s. Bobst India Pvt. Ltd.
award from B.A.I.
Consultant: M/s. Archivista Engineering Services Pvt. Ltd., Pune.
YEAR: 2001-02.
Design and Construction at Beverage Bottling Plant at Pillukhedi, Naraginghat, near Completed in time in 1.5
15. Bhopal, Madhya Pradesh for months.
M/s. Hindustan Coca-Cola Beverages Pvt. Ltd. YEAR: 2001-02.
Design and Construction of Beverage Bottling Plant at Burnihat, Meghalaya for Completed in time in 7 months.
16.
M/s. Hindustan Coca-Cola Beverages Pvt. Ltd. YEAR: 2000-01.
Design and Construction of Factory building at Daman and Goa for Completed in time in 4 months.
16. YEAR: 2000-01
M/s. Guala Closures (Daman) Pvt. Ltd.
YEAR: 1999-00.
Category: Oil & Chemical Industries.
Sr.
Name of the Project and Location Remark.
No.
CDU / VDU, CFC LPG Treating and ATF Treating units at Mangalore, Karnataka for
Completed in time.
03. M/s. Mangalore Refinery and Petrochemicals - a subsidy of ONGC. YEAR: 2011-2012.
Consultants: M/s. Jacobs Engineering India.
Construction of Operation Base Project at Barmer, Rajasthan including Civil, Completed in time in
04. Electrical, HVAC, Fire Fighting, IBMC, etc. for 10 months.
M/s. Cairn Energy India Pty. Ltd. YEAR: 2010-2011.
Civil and Structural Works of R & D Center ‘Project Kohinoor’ at Chakan for
05. M/s. Dow Chemical International Pvt. Ltd. Project Abandoned.
Consultant: M/s. Jacobs Engineering India Pvt. Ltd., Mumbai.
Completed in time in 15
months.
Safety excellence award from
“Construction Users Round
Adhesive and Water Based Latex Polymers Plant at Taloja, Navi Mumbai for Table (CURT) in United State
07. M/s. Rohm and Haas (India) Pvt. Ltd. of America”
Consultant: M/s. Jacobs H & G Pvt. Ltd. Excellence in Construction
from “Association of
Consulting Civil Engineers
(India)”.
YEAR: 2002-03.
Category: Automotive, Foundry and Forging Projects.
Sr.
Name of the Project and Location Remark.
No.
Civil Works for Expansion Assembly Shop, Vehicle Storage & Dock at
01. Completed in time.
Chakan,Pune for Bajaj Auto Ltd YEAR: 2015-2016.
Consultant :IPS - Mehtalia
Construction of "Regional office facility at Indore, Madhya Pradesh for
02. Completed in time.
Maruti Suzuki India Ltd. YEAR: 2015-2016.
Consultant: C. R. Narayan Rao.
03. Civil & Structural works at Chakan, Maharashtra for Mahindra Heavy Engines Completed in time.
Consultant: Tata Consulting Engineers. YEAR: 2014-2015.
Factory Building, Land Development and Compound Wall at Devas, Madhya Pradesh
04. Completed in time.
for M/s. John Deere India.
YEAR: 2014-2015.
Consultant: Tata Consulting Engineers.
OTR Plant at Mysore, Karnataka AND PCR / TBR Plant at Chennai, Tamil Nadu for
Completed in time.
M/s. J. K. Tyres and Industries.
10. YEAR: 2011-12.
Consultants: C. R. Narayanrao / Aswathanarayana and Eswara.
21 Construction of factory building for spring coils at Pirangut, Pune for Completed in time in 4 months.
M/s. Tata Chuo Springs Ltd. ‘Quality, Speed and Economy’
Award from BAI.
Consultant: M/s. Tata Consulting Engineers. YEAR: 1999-00.
25 Construction of Industrial Shed and Administrative Building at Chakan for Completed in time in 5 months.
M/s. Bajaj Electricals Ltd. YEAR: 1997-98.
Factory Building & Utilities for automotive batteries at MIDC Ahmednagar for
Completed in time in 10
M/s. Cosepa Fiscal Industries Ltd.
30 months.
Architect: M/s. S. N. Pingle.
YEAR: 1994-95.
Consultant: M/s. Sawardekar Consultants Pvt. Ltd.
Category: Engineering Industrial Projects, Warehouse and other Industries.
Sr.
Name of the Project and Location Remark.
No.
Civil, Structural & Infrastructure works of plants for Industrial township
Completed in time.
01. located at Khalapur, Dist-Raigad for Godrej & Boyce Mfg. Co. Ltd.
YEAR: 2016-17.
Consultant: Tata Consulting Engineers
Civil, structural, PEB, Electrical, Fire Protection and Infrastructure works
for Liquid packaging plant (Phase-1) Sanand Industrial Estate-II, Gujarat Completed in time.
02.
for Uflex Limited. YEAR: 2016-17.
Consultant : VMS Consultants
Civil & Plumbing Work Package - Upgradation of Bangalore Cigarette
Factory for ITC Ltd. Completed in time.
03.
Consultant: C. R. Narayan Rao. YEAR: 2014-15.
Factory Building at Noida, Delhi for
M/s. SMC Pneumatics India. Completed in time.
04.
YEAR: 2013-14.
Consultant: SDB Consultants (Pvt.) Ltd., New Delhi.
Main Civil, Structural and Plumbing Works at Pune, Maharashtra for
M/s. Bennett Coleman & Co. - Times of India. Completed in time.
05.
YEAR: 2012-13.
Consultants: Archivista Consultants.
Glass Factory at Bhiwadi, Rajasthan for
M/s. Saint Gobain Glass India. Completed in time.
06.
YEAR: 2011-12.
Consultant: Jacobs Engineering India.
Melting and casting facility at Pantnagar, Uttarakhand for
M/s. Hindustan Zinc. Completed in time.
07.
YEAR: 2011-12.
Consultant: Chemtex Engineering.
Factory Main Building and Temporary Site Office works at Shirwal,
Maharashtra for Completed in time.
08.
M/s. NIPRO, Japan. YEAR: 2011-12.
EPC: Shimizu Corporation, Japan.
Logistic Park at Hinjwadi, Maharashtra for Completed in time.
09.
M/s. India Land Global. YEAR: 2011-12.
Construction of Factory Building at Ranjangaon, Maharashtra for Completed in time.
10.
M/s. LG Electronics India. YEAR: 2011-12.
Construction of Office Building at Gurgaon, Haryana for Completed in time
11. in 06 months.
M/s. Delta Electronics India.
YEAR: 2010-2011.
Construction of Factory Building and Roads at Village: Wing for Completed in time in 09
12. M/s. Suessen Asia (Rieter Group) months.
Consultant: M/s. Chaugule Sant and Associates, Pune. YEAR: 2007-08.
Construction of Factory Building of Plastic Compound Plant at Ranjangaon,
Pune, Maharashtra for Work completed up to 80
13. Million only.
M/s. DSM Engineering Plastics (India).
YEAR: 2007-08.
Consultant: M/s. AkerKværner Powergas India Ltd., Pune.
Completed in time in 10
months.
YEAR: 2004-05.
Safety Award by National
Construction of Factory Building at Ranjangaon, Pune for
Safety Council of India for
14. M/s. LG Electronics India.
developing & implementing
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd.
effective OSH management
systems and procedures &
achieving good
performance.
Construction of garments factory and Other buildings at Jigani Industrial
Completed in time in 6
Area, Bengaluru for
15. months.
M/s. Yetticate Exports.
YEAR: 2000-01.
Consultant: M/s. Semac Pvt. Ltd.
Construction of New JFTC Project at Mysore for
Completed in time in 5 months.
16. M/s. The West Coast Paper Mills. YEAR: 2000–01.
Consultant: M/s. Karekar & Associates.
Completed before time in
Construction of Warehouse Factory at Bhigwan for 4.5 months with early
17.
M/s. Sinar Mas Paper & Pulp (I) Ltd. completion bonus.
YEAR: 2000–01.
Construction of Warehouse & Allied Work at ford campus marimalainagar
Chennai. Completed in time in 4.5
18. months.
M/s. Talera Logistics Pvt. Ltd.
YEAR: 1999–00.
Consultant: M/s. Y. S. Sane Associates.
Construction of factory Building & allied Works for vacuum cleaners Completed in time in 6
19. manufacturing at Baramati for months.
M/s. Modi Home Appliances. YEAR: 1993–94.
Consultant: M/s. Humphreys and Glasgow Consultants Ltd.
Construction of compound wall, Kurkumbh, Pune for Completed in time in 2
20 M/s. Pearl Engineering and Polymers Ltd. months.
Consultant: M/s. S. N. Pingle. YEAR: 1993–94.
Construction of factory shed for Pearl Pet Products at Mahad for Completed in time in 5
21. months.
M/s. Pearl Polymers Ltd.Consultant: Mr. Subhash Athale.
YEAR: 1992–93.
Category: Healthcare and Foods & Beverage Industries.
Sr.
Name of the Project and Location Remark.
No.
Civil and Structural works for Project Atta Factory at Ranjangaon, Pune
01. Completed in time.
for ITC Limited.
YEAR:2016-17
Consultants: Grindwell Norton Limited
Civil and Structural works for Coffee extraction cell and social block
02. Completed in time.
building in Nanjangud, Karnataka for Nestle India Limited.
YEAR:2016-17
Consultant: Tata Consulting Engineers.
03. Blue Mountain Project at Kothur, Hyderabad for Johnson & Johnson Completed in time.
Consultant: IPS - Mehtalia. YEAR:2015-16
Site Grading and Land development ,civil & Structural works for proposed
04. Completed in time.
Plant at Davangere, Karnataka for Cargill India.
YEAR:2015-16
Consultant: L&T IES, Vadodara.
Civil, Structural, Infrastructural & PEB works for Proposed Manufacturing
05. facility at SEZ, Pithampur, Madhya Pradesh for ACG Associated Capsules. Completed in time.
Consultant: Knexir Consultants. Completed in time. YEAR:2015-16
Manufacturing Unit of proposed Greenfield Project at Sanand II, Gujarat
06. for Completed in time.
M/s. Inbisco India. YEAR: 2014-15.
Consultant: VMS Engineering
Civil & structural Consultant,
work for Mini Ahmedabad.
PC (Production Center) at Sanand, Gujarat
07. Completed in time.
for Nivea India
YEAR: 2014-15
Consultant: L& T Technology Services Ltd
Civil, Structural, Infrastructural & PEB works of proposed OTC Green field
08. Completed in time.
Project at Sanand II, Gujarat for Teva Pharm
YEAR: 2014-15
Consultant: Knexir Consultants.
OSD Formulation Plant Project at Srikakulam, Andhra Pradesh for Dr.
09. Completed in time.
Reddy’s Laboratory
YEAR: 2014-2015.
Consultant: Knexir Consultants.
Hospital Building at New Delhi for
10. Completed in time.
Dr. Ram Manohar Lohia Hospital.
YEAR: 2014-2015.
EPC: Hosmac India.
Civil, Structural, Infrastructural & PEB works for Proposed Manufacturing
11. facility at SEZ, Pithampur, Madhya Pradesh for Completed in time.
M/s. ACG Associated Capsules. YEAR: 2014-2015.
Consultant: Knexir Consultants
Factory Building at Bidadi, Karnataka for
12. Completed in time.
M/s. Hindustan Coca-Cola Beverages.
YEAR: 2014-2015.
Consultant: Mott MacDonald, Ahmedabad.
Civil, Plumbing and Sanitary Works for Dairy Plant at Baramati,
13. Completed in time.
Maharashtra for M/s. Schreiber Dynamix Dairies.
YEAR: 2014-2015.
Consultant: Potential Semac Consultants.
Toothpaste manufacturing facility at Sanand, Gujarat for
14. Completed in time.
M/s. Colgate Palmolive (India).
YEAR: 2013-2014.
Consultant: Tata Consulting Engineers.
Nutrition Plant at Jhagadia for
15. Completed in time.
M/s. Abbott Nutrition India.
YEAR: 2013-2014.
Consultant: J+W Consultants.
Civil Works for High Speed Dove Finishing Line at Gandhidham, Gujarat for
16. Completed in time.
M/s. Aquagel Chemicals.
YEAR: 2012-13.
Consultant: L & T Consultant.
Deodorant Plant at Khamgaon for
Completed in time.
17. Unilever, UK.
YEAR: 2012-13.
Consultant: CH2M HILL
Factory Complex at Chakan, Maharashtra for
Completed in time.
18. M/s. Tetra Pak (India).
YEAR: 2012-13.
Consultant: Archivista Engineering Projects.
Nutrition Plant at Sonipat, Haryana for
Completed in time.
19. M/s. Kayem Food Industries.
YEAR: 2012-13.
Architect: Thareja Designers and Architecture.
Factory Building for Chocolate / Maggi at Ponda, Goa and Una, Himachal
Pradesh for Completed in time.
20.
M/s. Nestlé India. YEAR: 2012-13.
Consultant: Semac India.
Factory Building at Baddi, Himachal Pradesh for
Completed in time.
21 M/s. Cadbury India Ltd.
YEAR: 2011-12.
Consultant: Tata Consulting Engineers.
Civil and Structural Works for 200 TPD edible Oil Refinery at Baddi for Completed in time in
22 M/s. Marico Industries 5 months
Consultant: M/s. Jacobs Engineering India. YEAR: 2010-11.
Construction of FMCG Products at Haridwar for Completed in time in
23 M/s. Hindustan Unilever 6 months.
Consultant: M/s. AkerKværner Powergas India and M/s. B. Mehtalia YEAR: 2010-11.
Consultants
Construction of Everest Phase – 2 Plant at Baddi, Himachal Pradesh for Completed in time in
24 M/s. Cadbury India Ltd. 6 months.
Consultant: M/s. AkerKværner Powergas India Pvt. Ltd. YEAR: 2006-07.
Construction of Palm Oil Refinery at Kandla, Gujrat AND Paradip, Odisha Completed in time in
25 for 6 and 8 months.
M/s. Cargill India Pvt. Ltd. YEAR: 2003-04.
Consultant:
ConstructionM/s. AkerKværner
of Soap Powergas (India)
Plant at Barotiwala, Ltd.Pradesh for
Himachal Completed before time
26 M/s. Hindustan Unilever Ltd. in 14 months with early
Consultant: M/s. AkerKværner Powergas (India) Pvt. Ltd. completion bonus.
Construction of formulation plant at Daman (Phase - II) for YEAR: 2003-04.
Completed in time
27. M/s. USV Ltd. in 10 months.
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd. YEAR: 2004-05.
Construction of Turbo Project at Baddi, Himachal Pradesh for Completed before time
28. M/s. Colgate-Palmolive (India) Ltd. in 12 months with early
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd. completion bonus.
YEAR: 2003-04.
Construction of Personal Product Plant at Haridwar, Uttarakhand for Completed in time
29. M/s. Hindustan Unilever Ltd. in 6 months.
Consultant: M/s. AkerKværner Powergas (I) Ltd. YEAR: 2003-04.
Construction of Soap Plant at Bhuj, Gujarat for Completed in time
30. M/s. Aquagel Chemicals Pvt. Ltd. (HUL) in 6 months.
Consultant: M/s. AkerKværner Powergas India Ltd. YEAR: 2002-03.
Construction of 500 bedded Teaching hospital, Kadamwadi, Kolhapur for Completed in time
31. D. Y. Patil Education Society. in 18 months.
Architect: M/s. Beri Architects and Engineers Pvt. Ltd. YEAR: 2001-02.
Construction of formulation plant at Daman for Completed in time
32. M/s. USV Ltd. in 12 months.
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd. YEAR: 2001-02.
Expansion of Existing Factory Building at Ponda, Goa for Completed in time
33. M/s. Nestlé India Ltd. in 3.5 months.
Consultant: M/s. Semac Pvt. Ltd. YEAR: 2001-02.
Construction of Coconut Oil Extraction Plant at Pondichery for Completed in time
34. M/s. Marico Industries Ltd. in 4 months.
Consultant: M/s. Jacobs H & G Pvt. Ltd. YEAR: 2001-02.
Sr.
Name of the Project and Location Remark.
No.
01.
Completed in time in 16
02. months.
Construction of Management Training Institute - NORTHPOINT at Rustic Highland
‘Quality, Speed and Economy’
Khandala, Pune for
award from BAI.
M/s. Lintas Employees Technological Development Trust.
Architect: M/s. Ranjit Sinh Associates.
“C. M. Shah Concrete
Consultant: M/s. R. S. Mandrekar Project Consultants Pvt. Ltd.
Technology Prize 2000” from
Institute of Engineers.
YEAR: 2001-02.
Construction of E-Square Star Hotel / Multiplex at Pune for
03. Completed in time in 15
M/s. Ganatra Hotels Pvt.Ltd.
months.
Architect: M/s. Spatial Designs Consultants Pvt. Ltd.
YEAR: 2001-02.
Consultant: M/s. Mahimtura Consultants Pvt. Ltd.
Construction of Boy’s Hostel and Recreation Mess Hall at Baramati, Pune for
04. Completed in time in 7 months.
M/s. Vidya Pratishthan.
YEAR: 2000-01.
Consultant: M/s. Mandar Sikachi and Associates.
Completed in time in 10
05. Construction of Office Building at InfoTech Park, Hinjewadi, Pune for months.
M/s. Geometric Software Solutions Company Ltd.
Architect: M/s. PROTECH. ‘Quality, Speed and Economy’
Consultant: M/s. Y. S. Sane Associates. award from BAI.
YEAR: 1999-00.
08. Construction of 5 No(s). Sample Villas at Stage 1-A2 at Amby Valley Sahara Lake
Completed in time in 10
City, Lonawala for
months.
M/s. Sahara India Commercial Corporation Ltd.
YEAR: 2003–04.
Architect: M/s. Kamal S. Malik.
Sr.
Name of the Project and Location Remark.
No.
Alternate route to Ghat ki Guni by construction of Tunnel in Jhalana Hills to connect NH-11
Completed in time.
01. (Agra Road) Jaipur for
National Highway Authority of India (NHAI).
YEAR: 2012-2013.
Development of Integrated Check Post at Attari along Indo Pakistan Border for RITES Ltd Completed in time
02.
(Airport Division) YEAR: 2012-2013.
Construction of Sewage Treatment Plant for Pimpri Chinchwad Municipal Corporation at Completed in time
17. Sanghvi, Pune for in 6 months.
M/s. Thermax Ltd. - Waste Management Division. YEAR: 2000–01.