Projects In Hand

Sr.
Project details, Company Name , Location and Consultant
No.

A) INDUSTRIAL

01. Civil & Structural Works for Nutraceutical Plant at Mambattu, Andhra Pradesh for Tata Chemicals Ltd.
Consultant: Jacobs Engineering India Pvt. Ltd.

Civil, Structural and Architectural Works of SPARKLE2 Plant at Panoli, Gujarat for Solvay Specialities
02. India Pvt. Ltd.
Consultant: Tecnimont Pvt Ltd
Civil & MEP works for Construction of Factory Building for Topband India Pvt Ltd at Chakan Phase-2,
03. Pune.
Consultant: Archivista Consultants Pvt. Ltd.

04. Civil & Structure for proposed Auto GI & Resin manufacturing facility for Berger Paints at Jejuri,Pune.
Consultant: C. R. Narayan Rao.

Civil, Architectural, Structural and Interior for RDQ project at Thane, Mumbai for Mondelez India Foods
05. Pvt. Ltd.
Consultant: Jacobs Engineering India Pvt. Ltd.
Civil & structural Construction of Phase-3 for Proposed textiles Unit at Amreli District, Gujarat for Sintex
05. Industries Ltd.
Consultant: Pratap Parikh Associates
Civil Construction and Infrastructure development work for the proposed MDF2 plant at Chittor Dist.,
07. Andhra Pradesh for Greenply Industries Limited.
Consultant: Mott MacDonald.
Civil & Structural works for expansion of Fibre glass plant at MIDC Phase II, Taloja , Raigad for Owens
08. Corning (India) Pvt Ltd.
Consultant: Jacobs Engineering India Pvt. Ltd.
Site Development & Civil works for Corn silo storage Plant at Plant at Davangere, Karnataka for Cargill
09. India.
Consultant: IPS - Mehtalia.
Civil, Structural & Allied works for Integrated Consumer goods Manufacturing Facility, Trichy, Tamil Nadu
10. for ITC LTD.
Consultant: C. R. Narayan Rao.
Category: Turnkey, Design and Build Projects
Sr.N
Name of the Project and Location Remark.
o.
Civil works for Engine and Transmission Plant expansion at Manesar,
Completed in time.
01. Haryana for Maruti Suzuki India Ltd. YEAR: 2016-2017.
Design & Build
Design and Construction of Main Plant (Rubber Plant) at Shirwal, Maharashtra for Completed in time.
02.
M/s. Nipro India Corporation. YEAR: 2013-2014.
Design and Build Component Test Lab at Pune, Maharashtra for Completed in time.
03.
M/s. Bajaj Auto. YEAR: 2012-2013.
Design and Build Factory Complex at Savali, Vadodara for Completed in time.
04.
M/s. FAG Bearings – a Schaeffler Group Co. YEAR: 2012-2013.
Warehouses at Paradip, Odisha for Completed in time.
05.
M/s. Indian Oil Corporation. YEAR: 2011-12.
Completed in time in 04
Expansion of Two Wheeler Plant at Pantnagar, Uttarakhand for
06. months.
M/s. Bajaj Auto Ltd.
YEAR: 2011-12.
Civil, Structural and MEP Works of manufacturing plant at Ranjangaon for Completed in time in 10
07. M/s. Jabil Circuit India Pvt. Ltd. months.
Consultant: M/s. Dandekar and Associates, Pune. YEAR: 2007-08.

Completed in time in 12
months.
YEAR: 2006-2007.
Design and Construction of Factory Building at Pantnagar, Uttarakhand for Safety Award by National
08. Safety Council of India for
M/s. Bajaj Auto Ltd. developing & implementing
effective OSH management
systems and procedures &
achieving good performance.
Completed in time in 8 months.
YEAR: 2006-07.
 BAI has awarded Pune
project for “Best of Best
Civil and Electro-Mech works on single point responsibility for Factory Building and Structure”, “Well Equipped &
other facilities for Roll Forming and Frame Fabrication Plants at Mechanized Project” and by
a. Pune (Maharashtra) AESA for “Best Construction
09. b. Bhiwadi (Rajasthan) Management”
c. Chennai (Tamil Nadu), for  Safety Award by
M/s. Tata BlueScope Steel Ltd. National Safety Council of
Consultant: M/s. Dalal Mott MacDonald, Noida. India for developing &
implementing effective OSH
management systems and
procedures & achieving good
performance.
Design and Construction of Factory Building at Chakan, Maharashtra for Completed in time in 6 months.
10.
M/s. Bajaj Auto Ltd. YEAR: 2006-07.
Design and Construction of Beverage Plant and Procurement Services for Utilities
and Electricals at
Completed in time in 5 months.
11. a. Jaipur b. Hyderabad, Pune Vijayawada
YEAR: 2002-03.
b. Delhi (Ghaziabad), for
M/s. Hindustan Coca-Cola Beverages Pvt. Ltd.
Design and Construction of Beverage Plant and Procurement Services for Utilities
12. Completed in time in 6 months.
and Electricals at Tirupati for
YEAR: 2002-03.
M/s. Laxmi Balaji Bottling Pvt. Ltd.
Design and Construction of Beverages Bottling Plant in Bhutan for Completed in time in 7 months.
13.
M/s. Bhutan Beverages Co. Ltd. YEAR: 2001-02.
Completed in time in 6 months.
Construction of Factory Building at Pirangut, Pune for
‘Quality, Speed and Economy’
14. M/s. Bobst India Pvt. Ltd.
award from B.A.I.
Consultant: M/s. Archivista Engineering Services Pvt. Ltd., Pune.
YEAR: 2001-02.
Design and Construction at Beverage Bottling Plant at Pillukhedi, Naraginghat, near Completed in time in 1.5
15. Bhopal, Madhya Pradesh for months.
M/s. Hindustan Coca-Cola Beverages Pvt. Ltd. YEAR: 2001-02.

Design and Construction of Beverage Bottling Plant at Burnihat, Meghalaya for Completed in time in 7 months.
16.
M/s. Hindustan Coca-Cola Beverages Pvt. Ltd. YEAR: 2000-01.

Design and Construction of Factory building at Daman and Goa for Completed in time in 4 months.
16. YEAR: 2000-01
M/s. Guala Closures (Daman) Pvt. Ltd.
YEAR: 1999-00.
Category: Oil & Chemical Industries.
Sr.
Name of the Project and Location Remark.
No.

Building and Infrastructure for Greenfield Edible Oil Refinery at Khopoli,


Maharashtra for Completed in time.
01.
M/s. Frigorifico Allana. YEAR: 2013-2014.
Consultant: Mott MacDonald.

1 x 72 MW CPP at Mangalore for


Completed in time.
02. ONGC - MRPL.
YEAR: 2012-2013.
EPC: Thermax.

CDU / VDU, CFC LPG Treating and ATF Treating units at Mangalore, Karnataka for
Completed in time.
03. M/s. Mangalore Refinery and Petrochemicals - a subsidy of ONGC. YEAR: 2011-2012.
Consultants: M/s. Jacobs Engineering India.

Construction of Operation Base Project at Barmer, Rajasthan including Civil, Completed in time in
04. Electrical, HVAC, Fire Fighting, IBMC, etc. for 10 months.
M/s. Cairn Energy India Pty. Ltd. YEAR: 2010-2011.

Civil and Structural Works of R & D Center ‘Project Kohinoor’ at Chakan for
05. M/s. Dow Chemical International Pvt. Ltd. Project Abandoned.
Consultant: M/s. Jacobs Engineering India Pvt. Ltd., Mumbai.

Construction of Process Catalyst Plant at Taloja for Completed in time in


06. M/s. Johnson Matthey Chemicals Pvt. Ltd. 6 months.
Consultant: M/s. AkerKværner Powergas India Pvt. Ltd. YEAR: 2003-04.

Completed in time in 15
months.
Safety excellence award from
“Construction Users Round
Adhesive and Water Based Latex Polymers Plant at Taloja, Navi Mumbai for Table (CURT) in United State
07. M/s. Rohm and Haas (India) Pvt. Ltd. of America”
Consultant: M/s. Jacobs H & G Pvt. Ltd. Excellence in Construction
from “Association of
Consulting Civil Engineers
(India)”.
YEAR: 2002-03.
Category: Automotive, Foundry and Forging Projects.
Sr.
Name of the Project and Location Remark.
No.
Civil Works for Expansion Assembly Shop, Vehicle Storage & Dock at
01. Completed in time.
Chakan,Pune for Bajaj Auto Ltd YEAR: 2015-2016.
Consultant :IPS - Mehtalia
Construction of "Regional office facility at Indore, Madhya Pradesh for
02. Completed in time.
Maruti Suzuki India Ltd. YEAR: 2015-2016.
Consultant: C. R. Narayan Rao.

03. Civil & Structural works at Chakan, Maharashtra for Mahindra Heavy Engines Completed in time.
Consultant: Tata Consulting Engineers. YEAR: 2014-2015.

Factory Building, Land Development and Compound Wall at Devas, Madhya Pradesh
04. Completed in time.
for M/s. John Deere India.
YEAR: 2014-2015.
Consultant: Tata Consulting Engineers.

Infrastructure and Building Works at Chakan, Maharashtra for


Completed in time.
M/s. Mahindra Vehicle Manufacturer.
05. YEAR: 2013-2014.
Consultant: Tata Consulting Engineers.

Aluminium Plant: Carbon Plant, Cast House at Singrauli for


05. Completed in time.
M/s. Hindalco Industries.
YEAR: 2013-2014.
Consultant: Engineers India.

Truck Plant at Pantnagar, Uttarakhand and Alwar, Rajasthan for


06. Completed in time.
M/s. Ashok Leyland.
YEAR: 2013-2014.
Consultant: Sijcon Consultants.

Manufacturing Plant at Chakan, Maharashtra for


07. Completed in time.
M/s. Atlas Copco.
YEAR: 2012-2013.
Consultant: Dandekar and Associates.

Tractor manufacturing plant Zaheerabad, Andhra Pradesh for


08. Completed in time.
M/s. Mahindra and Mahindra.
YEAR: 2012-2013.
Consultant: Tata Consulting Engineers.

Truck Radial Plant at Trichy, Tamil Nadu for


09. Completed in time.
M/s. MRF.
YEAR: 2012-2013.
Consultant: Tata Consulting Engineers.

OTR Plant at Mysore, Karnataka AND PCR / TBR Plant at Chennai, Tamil Nadu for
Completed in time.
M/s. J. K. Tyres and Industries.
10. YEAR: 2011-12.
Consultants: C. R. Narayanrao / Aswathanarayana and Eswara.

Construction of Factory at Chakan for


11. Completed in time.
M/s. Gestamp Automotive India
YEAR: 2010-2011.
Consultant: M/s. Semac

Construction of Automobile Plant at Chakan, Near Pune for


12. Completed in time
M/s. Mahindra Automotive
YEAR: 2010-2011.
Consultant: M/s. TCE Consulting Engineers

Civil and External Services Works at Pantnagar, Uttarakhand for


13. Completed in time
M/s. Ashok Leyland
YEAR: 2010-2011.
Consultant: M/s. Sijcon Consultants

Completed in time in 1.5


14. Land Development Work at Pune, Maharashtra for
months.
M/s. DaimlerChrysler India Pvt. Ltd.
YEAR: 2007-08.

Construction of Regional Parts Depot at Manesar, Haryana for


15. Completed in time in 8 months.
M/s. Toyota Kirloskar Motors Pvt. Ltd.
YEAR: 2004-05.
Consultant: M/s. C. R. Narayan Rao.

Expansion work of the Factory Building at Shirwal, Satara for


16. Completed in time in 5 months.
M/s. Tube Investments of India Ltd.
YEAR: 2004-05.
Consultant: M/s. S. W. Mone & Associates.

Construction of Factory building for E. O. U. at Hinjewadi, Pune for


17. Completed in time in 3 months.
M/s. Tata Ficosa Automotive System Ltd.
YEAR: 2003-04.
Consultant: M/s. Archivista Engineering Services Pvt. Ltd.

Construction of Factory Building for automotive luminaries at Chakan, Pune for


18. Completed in time in 8 months.
M/s. Rinder India Pvt Ltd.
YEAR: 2002-03.
Consultant: M/s. Archivista Engineering Services Pvt. Ltd.
Construction of Carburetor plant at Chakan, Pune for
Completed in time in 5 months.
19. M/s. Keihin Fie Pvt. Ltd.
YEAR: 1999-00.
Consultant: M/s. Tata Consulting Engineers.

Construction of factory building for transmission gears at Chennai for


Completed in time in 7 months.
20. M/s. Bonfiglioli Transmission Pvt. Ltd.
YEAR: 1999-00.
Consultant: M/s. Gherzi Eastern Ltd.

21 Construction of factory building for spring coils at Pirangut, Pune for Completed in time in 4 months.
M/s. Tata Chuo Springs Ltd. ‘Quality, Speed and Economy’
Award from BAI.
Consultant: M/s. Tata Consulting Engineers. YEAR: 1999-00.

Completed in time in 4 months.


22 Construction of Heat Treatment Shop & MCD-II Factory Building at Pune for
M/s. Bharat Forge Ltd.
YEAR: 1999-00.

Completed in time in 3 months.


23 Construction of Factory Complex at MIDC Ranjangaon at Pune for
M/s. Kalyani Carpenter Special Steels Ltd.
YEAR: 1999-00.
Completed in time in 14.5
24 Construction of Iron foundry Project building at Goa for months.
M/s. Teksid Kalyani Iron Foundry Ltd.
Consultant: M/s. Dalal Consultant and Engineers Ltd. YEAR: 1998-99.

25 Construction of Industrial Shed and Administrative Building at Chakan for Completed in time in 5 months.
M/s. Bajaj Electricals Ltd. YEAR: 1997-98.

Consultant: M/s. Dongre and Dongre Associates.


26 Completed before time in 9
Construction of Industrial Building at Urse, Pune for
months with early completion
M/s. DGP Hinoday Industries Ltd.
bonus.
YEAR: 1997-98.
Architect: M/s. Chaugule Sant and Associates.
Completed in time in 10
27 Construction of Industrial Sheds at Urse, Pune for months.
M/s. Jaya Hind Industries Ltd. YEAR: 1995-96.
Architect: M/s. S. B. Thorat and Partners.

28 Construction of Industrial Project buildings at Shirwal, Pune for


Completed in time in 6 months.
M/s. Tube Investments of India Ltd.
YEAR: 1995-96.
Consultant: M/s. S. W. Mone & Associates.

29 Construction of factory building for tractor assembly at Akurdi, Pune for


Completed in time in 12
M/s. Bajaj Tempo Ltd.
months.
YEAR: 1994-95.
Project consultant: M/s. N. S. Consultants.
Consultant: M/s. Sawardekar Consultants Pvt. Ltd.

Factory Building & Utilities for automotive batteries at MIDC Ahmednagar for
Completed in time in 10
M/s. Cosepa Fiscal Industries Ltd.
30 months.
Architect: M/s. S. N. Pingle.
YEAR: 1994-95.
Consultant: M/s. Sawardekar Consultants Pvt. Ltd.
Category: Engineering Industrial Projects, Warehouse and other Industries.
Sr.
Name of the Project and Location Remark.
No.
Civil, Structural & Infrastructure works of plants for Industrial township
Completed in time.
01. located at Khalapur, Dist-Raigad for Godrej & Boyce Mfg. Co. Ltd.
YEAR: 2016-17.
Consultant: Tata Consulting Engineers
Civil, structural, PEB, Electrical, Fire Protection and Infrastructure works
for Liquid packaging plant (Phase-1) Sanand Industrial Estate-II, Gujarat Completed in time.
02.
for Uflex Limited. YEAR: 2016-17.
Consultant : VMS Consultants
Civil & Plumbing Work Package - Upgradation of Bangalore Cigarette
Factory for ITC Ltd. Completed in time.
03.
Consultant: C. R. Narayan Rao. YEAR: 2014-15.
Factory Building at Noida, Delhi for
M/s. SMC Pneumatics India. Completed in time.
04.
YEAR: 2013-14.
Consultant: SDB Consultants (Pvt.) Ltd., New Delhi.
Main Civil, Structural and Plumbing Works at Pune, Maharashtra for
M/s. Bennett Coleman & Co. - Times of India. Completed in time.
05.
YEAR: 2012-13.
Consultants: Archivista Consultants.
Glass Factory at Bhiwadi, Rajasthan for
M/s. Saint Gobain Glass India. Completed in time.
06.
YEAR: 2011-12.
Consultant: Jacobs Engineering India.
Melting and casting facility at Pantnagar, Uttarakhand for
M/s. Hindustan Zinc. Completed in time.
07.
YEAR: 2011-12.
Consultant: Chemtex Engineering.
Factory Main Building and Temporary Site Office works at Shirwal,
Maharashtra for Completed in time.
08.
M/s. NIPRO, Japan. YEAR: 2011-12.
EPC: Shimizu Corporation, Japan.
Logistic Park at Hinjwadi, Maharashtra for Completed in time.
09.
M/s. India Land Global. YEAR: 2011-12.
Construction of Factory Building at Ranjangaon, Maharashtra for Completed in time.
10.
M/s. LG Electronics India. YEAR: 2011-12.
Construction of Office Building at Gurgaon, Haryana for Completed in time
11. in 06 months.
M/s. Delta Electronics India.
YEAR: 2010-2011.
Construction of Factory Building and Roads at Village: Wing for Completed in time in 09
12. M/s. Suessen Asia (Rieter Group) months.
Consultant: M/s. Chaugule Sant and Associates, Pune. YEAR: 2007-08.
Construction of Factory Building of Plastic Compound Plant at Ranjangaon,
Pune, Maharashtra for Work completed up to 80
13. Million only.
M/s. DSM Engineering Plastics (India).
YEAR: 2007-08.
Consultant: M/s. AkerKværner Powergas India Ltd., Pune.
Completed in time in 10
months.
YEAR: 2004-05.
Safety Award by National
Construction of Factory Building at Ranjangaon, Pune for
Safety Council of India for
14. M/s. LG Electronics India.
developing & implementing
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd.
effective OSH management
systems and procedures &
achieving good
performance.
Construction of garments factory and Other buildings at Jigani Industrial
Completed in time in 6
Area, Bengaluru for
15. months.
M/s. Yetticate Exports.
YEAR: 2000-01.
Consultant: M/s. Semac Pvt. Ltd.
Construction of New JFTC Project at Mysore for
Completed in time in 5 months.
16. M/s. The West Coast Paper Mills. YEAR: 2000–01.
Consultant: M/s. Karekar & Associates.
Completed before time in
Construction of Warehouse Factory at Bhigwan for 4.5 months with early
17.
M/s. Sinar Mas Paper & Pulp (I) Ltd. completion bonus.
YEAR: 2000–01.
Construction of Warehouse & Allied Work at ford campus marimalainagar
Chennai. Completed in time in 4.5
18. months.
M/s. Talera Logistics Pvt. Ltd.
YEAR: 1999–00.
Consultant: M/s. Y. S. Sane Associates.

Construction of factory Building & allied Works for vacuum cleaners Completed in time in 6
19. manufacturing at Baramati for months.
M/s. Modi Home Appliances. YEAR: 1993–94.
Consultant: M/s. Humphreys and Glasgow Consultants Ltd.
Construction of compound wall, Kurkumbh, Pune for Completed in time in 2
20 M/s. Pearl Engineering and Polymers Ltd. months.
Consultant: M/s. S. N. Pingle. YEAR: 1993–94.
Construction of factory shed for Pearl Pet Products at Mahad for Completed in time in 5
21. months.
M/s. Pearl Polymers Ltd.Consultant: Mr. Subhash Athale.
YEAR: 1992–93.
Category: Healthcare and Foods & Beverage Industries.
Sr.
Name of the Project and Location Remark.
No.
Civil and Structural works for Project Atta Factory at Ranjangaon, Pune
01. Completed in time.
for ITC Limited.
YEAR:2016-17
Consultants: Grindwell Norton Limited
Civil and Structural works for Coffee extraction cell and social block
02. Completed in time.
building in Nanjangud, Karnataka for Nestle India Limited.
YEAR:2016-17
Consultant: Tata Consulting Engineers.

03. Blue Mountain Project at Kothur, Hyderabad for Johnson & Johnson Completed in time.
Consultant: IPS - Mehtalia. YEAR:2015-16

Site Grading and Land development ,civil & Structural works for proposed
04. Completed in time.
Plant at Davangere, Karnataka for Cargill India.
YEAR:2015-16
Consultant: L&T IES, Vadodara.
Civil, Structural, Infrastructural & PEB works for Proposed Manufacturing
05. facility at SEZ, Pithampur, Madhya Pradesh for ACG Associated Capsules. Completed in time.
Consultant: Knexir Consultants. Completed in time. YEAR:2015-16
Manufacturing Unit of proposed Greenfield Project at Sanand II, Gujarat
06. for Completed in time.
M/s. Inbisco India. YEAR: 2014-15.
Consultant: VMS Engineering
Civil & structural Consultant,
work for Mini Ahmedabad.
PC (Production Center) at Sanand, Gujarat
07. Completed in time.
for Nivea India
YEAR: 2014-15
Consultant: L& T Technology Services Ltd
Civil, Structural, Infrastructural & PEB works of proposed OTC Green field
08. Completed in time.
Project at Sanand II, Gujarat for Teva Pharm
YEAR: 2014-15
Consultant: Knexir Consultants.
OSD Formulation Plant Project at Srikakulam, Andhra Pradesh for Dr.
09. Completed in time.
Reddy’s Laboratory
YEAR: 2014-2015.
Consultant: Knexir Consultants.
Hospital Building at New Delhi for
10. Completed in time.
Dr. Ram Manohar Lohia Hospital.
YEAR: 2014-2015.
EPC: Hosmac India.
Civil, Structural, Infrastructural & PEB works for Proposed Manufacturing
11. facility at SEZ, Pithampur, Madhya Pradesh for Completed in time.
M/s. ACG Associated Capsules. YEAR: 2014-2015.
Consultant: Knexir Consultants
Factory Building at Bidadi, Karnataka for
12. Completed in time.
M/s. Hindustan Coca-Cola Beverages.
YEAR: 2014-2015.
Consultant: Mott MacDonald, Ahmedabad.
Civil, Plumbing and Sanitary Works for Dairy Plant at Baramati,
13. Completed in time.
Maharashtra for M/s. Schreiber Dynamix Dairies.
YEAR: 2014-2015.
Consultant: Potential Semac Consultants.
Toothpaste manufacturing facility at Sanand, Gujarat for
14. Completed in time.
M/s. Colgate Palmolive (India).
YEAR: 2013-2014.
Consultant: Tata Consulting Engineers.
Nutrition Plant at Jhagadia for
15. Completed in time.
M/s. Abbott Nutrition India.
YEAR: 2013-2014.
Consultant: J+W Consultants.
Civil Works for High Speed Dove Finishing Line at Gandhidham, Gujarat for
16. Completed in time.
M/s. Aquagel Chemicals.
YEAR: 2012-13.
Consultant: L & T Consultant.
Deodorant Plant at Khamgaon for
Completed in time.
17. Unilever, UK.
YEAR: 2012-13.
Consultant: CH2M HILL
Factory Complex at Chakan, Maharashtra for
Completed in time.
18. M/s. Tetra Pak (India).
YEAR: 2012-13.
Consultant: Archivista Engineering Projects.
Nutrition Plant at Sonipat, Haryana for
Completed in time.
19. M/s. Kayem Food Industries.
YEAR: 2012-13.
Architect: Thareja Designers and Architecture.
Factory Building for Chocolate / Maggi at Ponda, Goa and Una, Himachal
Pradesh for Completed in time.
20.
M/s. Nestlé India. YEAR: 2012-13.
Consultant: Semac India.
Factory Building at Baddi, Himachal Pradesh for
Completed in time.
21 M/s. Cadbury India Ltd.
YEAR: 2011-12.
Consultant: Tata Consulting Engineers.
Civil and Structural Works for 200 TPD edible Oil Refinery at Baddi for Completed in time in
22 M/s. Marico Industries 5 months
Consultant: M/s. Jacobs Engineering India. YEAR: 2010-11.
Construction of FMCG Products at Haridwar for Completed in time in
23 M/s. Hindustan Unilever 6 months.
Consultant: M/s. AkerKværner Powergas India and M/s. B. Mehtalia YEAR: 2010-11.
Consultants
Construction of Everest Phase – 2 Plant at Baddi, Himachal Pradesh for Completed in time in
24 M/s. Cadbury India Ltd. 6 months.
Consultant: M/s. AkerKværner Powergas India Pvt. Ltd. YEAR: 2006-07.
Construction of Palm Oil Refinery at Kandla, Gujrat AND Paradip, Odisha Completed in time in
25 for 6 and 8 months.
M/s. Cargill India Pvt. Ltd. YEAR: 2003-04.
Consultant:
ConstructionM/s. AkerKværner
of Soap Powergas (India)
Plant at Barotiwala, Ltd.Pradesh for
Himachal Completed before time
26 M/s. Hindustan Unilever Ltd. in 14 months with early
Consultant: M/s. AkerKværner Powergas (India) Pvt. Ltd. completion bonus.
Construction of formulation plant at Daman (Phase - II) for YEAR: 2003-04.
Completed in time
27. M/s. USV Ltd. in 10 months.
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd. YEAR: 2004-05.
Construction of Turbo Project at Baddi, Himachal Pradesh for Completed before time
28. M/s. Colgate-Palmolive (India) Ltd. in 12 months with early
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd. completion bonus.
YEAR: 2003-04.
Construction of Personal Product Plant at Haridwar, Uttarakhand for Completed in time
29. M/s. Hindustan Unilever Ltd. in 6 months.
Consultant: M/s. AkerKværner Powergas (I) Ltd. YEAR: 2003-04.
Construction of Soap Plant at Bhuj, Gujarat for Completed in time
30. M/s. Aquagel Chemicals Pvt. Ltd. (HUL) in 6 months.
Consultant: M/s. AkerKværner Powergas India Ltd. YEAR: 2002-03.
Construction of 500 bedded Teaching hospital, Kadamwadi, Kolhapur for Completed in time
31. D. Y. Patil Education Society. in 18 months.
Architect: M/s. Beri Architects and Engineers Pvt. Ltd. YEAR: 2001-02.
Construction of formulation plant at Daman for Completed in time
32. M/s. USV Ltd. in 12 months.
Consultant: M/s. B. Mehtalia Consultants Pvt. Ltd. YEAR: 2001-02.
Expansion of Existing Factory Building at Ponda, Goa for Completed in time
33. M/s. Nestlé India Ltd. in 3.5 months.
Consultant: M/s. Semac Pvt. Ltd. YEAR: 2001-02.
Construction of Coconut Oil Extraction Plant at Pondichery for Completed in time
34. M/s. Marico Industries Ltd. in 4 months.
Consultant: M/s. Jacobs H & G Pvt. Ltd. YEAR: 2001-02.

Construction of Pharmaceutical Grade Factory Building at Ghotawade,


Completed in time
Pune.
35. in 7 months.
M/s. Esvee Pharmaceuticals Pvt. Ltd.
YEAR: 2000-01.
Consultant: M/s. Dongre and Dongre Associates.

Construction of Soap Plant at Goa for Completed in time


36. M/s. Hindustan Unilever Ltd. in 8 months.
Consultant: M/s. AkerKværner Powergas India Ltd. YEAR: 2000-01.
Construction of Bulk drugs Plant at Navi Mumbai for Completed in time
37. M/s. Zydus Byk HealthCare Ltd. in 9 months.
Consultant: M/s. B. Mehtalia Consultants Pvt Ltd. YEAR: 2000-01.
Construction of ETP,Utilities, storage structures and external development
Completed in time in 3.5
works at
38. months.
a. Bhubaneshwar, Odisha b. Pune, Maharashtra, for
YEAR: 1999–00.
M/s. Lend Lease Projects Pvt. Ltd.

Completed before time


Construction of beverage bottling plant at Jaipur for
in 6 months with early
39. M/s. Lend Lease Projects Pvt. Ltd.
completion bonus.
Consultant: M/s. Semac Pvt. Ltd.
YEAR: 1999-00.
Construction of beverage bottling plant for M/s. Lend Lease Projects at Completed before time
a. Delhi (Ghaziabad) b. Goa in 8 months with early
40.
c. Bengaluru d. Vijayawada. completion bonus.
e. Hyderabad. YEAR: 1998-99.
Completed before
Construction of beverage bottling plant at Bengaluru for schedule
41. M/s. PepsiCo India Holdings Pvt. Ltd. in 5 months with early
Consultant: M/s. Chemtex Engineering of India Ltd. completion bonus.
YEAR: 1997-98.
Construction of Multi-specialty Hospital Building of Poona Medical Completed in time
Foundations, Pune for in 30 months.
42. Ruby Hall Clinic ‘Quality, Speed and
Architect: Mr. Kamal S. Malik. Economy’ award from B.A.I.
General Contractor: M/s. Holzmann Videocon Engineers Ltd. YEAR: 1995-96.
Completed before schedule
Construction of factory building and Allied work at Alandi for
in
43. M/s. Sewa Medicals Ltd.
7 months.
Consultant: M/s. Dongre and Dongre Associates.
YEAR: 1994-95.
Construction of Main Pharma building & utilities at Mahad, Navi Mumbai
Completed in time in 15
for
44. months.
M/s. Boehringer Mannheim (I) Ltd.
YEAR: 1993-94.
Consultant: M/s. Humphreys and Glasgow Consultants Ltd.
Category: Hospitality and Institutional Buildings

Sr.
Name of the Project and Location Remark.
No.

01.

Civil works of proposed Management block building including misc. work


(Compound wall & Internal Roads) for Symbiosis University of applied Completed in time.
Science at Indore, M.P. for Symbiosis Foundation. YEAR: 2015-2016.
Consultants: STUP Consultants.

Completed in time in 16
02. months.
Construction of Management Training Institute - NORTHPOINT at Rustic Highland
‘Quality, Speed and Economy’
Khandala, Pune for
award from BAI.
M/s. Lintas Employees Technological Development Trust.
Architect: M/s. Ranjit Sinh Associates.
“C. M. Shah Concrete
Consultant: M/s. R. S. Mandrekar Project Consultants Pvt. Ltd.
Technology Prize 2000” from
Institute of Engineers.
YEAR: 2001-02.
Construction of E-Square Star Hotel / Multiplex at Pune for
03. Completed in time in 15
M/s. Ganatra Hotels Pvt.Ltd.
months.
Architect: M/s. Spatial Designs Consultants Pvt. Ltd.
YEAR: 2001-02.
Consultant: M/s. Mahimtura Consultants Pvt. Ltd.

Construction of Boy’s Hostel and Recreation Mess Hall at Baramati, Pune for
04. Completed in time in 7 months.
M/s. Vidya Pratishthan.
YEAR: 2000-01.
Consultant: M/s. Mandar Sikachi and Associates.

Completed in time in 10
05. Construction of Office Building at InfoTech Park, Hinjewadi, Pune for months.
M/s. Geometric Software Solutions Company Ltd.
Architect: M/s. PROTECH. ‘Quality, Speed and Economy’
Consultant: M/s. Y. S. Sane Associates. award from BAI.
YEAR: 1999-00.

Construction of Administrative Office and Museum, Baramati. Completed in time in 18


06.
M/s. Vidya Pratishthan. months.
Consultant: M/s. Shashi Prabhu and Associates. YEAR: 1995-96.

Construction of Ladies Hostel Building at Baramati, Pune. Completed before schedule in


07.
M/s. Vidya Pratishthan. 9 month.
Consultant: M/s. Sikachi Chawda and Associates. YEAR: 1992-93.

08. Construction of 5 No(s). Sample Villas at Stage 1-A2 at Amby Valley Sahara Lake
Completed in time in 10
City, Lonawala for
months.
M/s. Sahara India Commercial Corporation Ltd.
YEAR: 2003–04.
Architect: M/s. Kamal S. Malik.

Construction of residential buildings, twin Bunglows, Row Houses & Dormitories


09. Completed in time in 12
Baramati for
months.
M/s. Dynamix Dairy Industries Ltd.
YEAR: 1994–95.
Consultant: M/s. Architectural Consultants.

Construction of staff housing, Mahad for


10. Completed in time in 9 months.
M/s. Hikal Chemicals Industries Ltd.
YEAR: 1994–95.
Consultant: The Planning Group.

Construction of staff housing and recreation center at IUCAA, Pune for


Completed in time in 12
Inter University Centre for Astronomy and Astrophysics.
11. months.
Architect: M/s. Charles Correa.
YEAR: 1993–94.
Consultant: M/s. Shrikhande Consultants Pvt. Ltd.
Completed Projects
Category: Infrastructure Projects

Sr.
Name of the Project and Location Remark.
No.

Alternate route to Ghat ki Guni by construction of Tunnel in Jhalana Hills to connect NH-11
Completed in time.
01. (Agra Road) Jaipur for
National Highway Authority of India (NHAI).
YEAR: 2012-2013.

Development of Integrated Check Post at Attari along Indo Pakistan Border for RITES Ltd Completed in time
02.
(Airport Division) YEAR: 2012-2013.

Design, Engineering, Construction, Finance, Operation and Maintenance of 4 Laning


Completed in time
03. from Km. 455.400 to 491.330 Amritsar - Wagah Section of NH-1 in the State of Punjab on
YEAR: 2011-2012.
BOT (Annuity) Basis for National Highway Authority of India (NHAI).
Construction, Upgradation, Operation and Maintenance of Dakha – Raikot - Barnala Road
Completed in time
04. Project on B. O. T. Basis for
YEAR: 2011-2012.
PWD (B & R), Government of Punjab. Width: 7 to 10m.
Operation and Maintenance of Ropar – Phagwara Road for
Completed in time
05. PWD (B & R), Government of Punjab. YEAR: 2008-09.
Length: 85 Km.
Operation and Maintenance of Jagraon – Nakodar Road for
Completed in time
06. PWD (B & R), Government of Punjab. YEAR: 2008-09.
Length: 43 Km.
Construction, Upgradation, Operation and Maintenance of Kiratpursahib - Una Road
Project on B. O. T. Basis for Completed in time
07. PWD (B & R), Government of Punjab in 12 months.
Length: 37 Km. YEAR: 2005-06.
Width: 7 to 17m.
Construction, Upgradation, Operation and Maintenance of Balachaur – Garshankar – Completed before
Hoshiarpur Road Project on B. O. T. Basis for time in 12.5
08.
PWD (B & R), Government of Punjab. months.
Length: 105 Km.Width: 7 to 15m. YEAR: 2005-06.
Construction, Upgradation, Operation and Maintenance of Patiala – Samana – Patran
Road Project on B. O. T. Basis for Completed before
09. PWD (B & R), Government of Punjab. time in 12 months.
Length: 49 Km. YEAR: 2005-06.
Width: 7 to 10m.
Construction of Railway Over Bridge with approaches on Solapur Aurangabad Dhule
Completed in time
Dondaicha Shahada Dhadgaon Road MSH 1 at 58 / 900 near Dondaicha in Taluka
10. Shandhkheda, District Dhule on B. O. T. basis for in 12 months.
YEAR: 2003-04.
PWD, Government of Maharashtra.
Completed before
Development of Modern Bus Terminal at Amritsar on B. O. T. basis for
11. time in 17 months.
PIDB, Government of Punjab. YEAR: 2003-04.
Improvement to Ahmednagar – Takalkazi – Bhoom Road MSH – 2, Km 212 / 300 to 220 / Completed in time
12. 850, SH-142, Km 0/000 to 15/000 and 59/735 to 87/065 (51.485 Km) on BOT basis for in 10 months.
PWD, Government of Maharashtra. YEAR: 2003-04.
Improvement to Ahmednagar - Ashti - Jamkhed - Bhoom - Pardi Road SH 142, Section Completed in time
13. Km. 15 / 00 to 59 / 800 (44.800 Km) on B. O. T. basis for in 6 months
PWD, Government of Maharashtra. YEAR: 2003-04.
Rehabilitation of Road from Tikota to Athani, Package - M2 – under World Bank funding Completed after
for schedule in 16
14.
PWD, Government of Karnataka. months.
Consultant: BCEOM - BECA - STUP – AARVEE. YEAR: 2001–02
Design and Construction of Major Bridge across Terna River on Ausa - Omerga - Khasgi
road Km 26 / 500 (SH - 164) in Osmanabad district under Privatization, on B.O.T. Basis Completed before
15. time in 4.5 Months.
for
YEAR: 2002-03.
PWD, Government of Maharashtra.
Design and Construction of major bridge across river Harna near village Hannur on
Completed in time
Mulegaon - Dhotri – Hannur Sultanpur - Kini - Kazikan bus road MDR-37 from Ch - 28/200
16. in 6 months.
for
YEAR: 2000-01.
PWD, Solapur.
Improvement and strengthening of Hanumangarh – Suratgarh Road, Km 0/0 to 26/0. on Completed before
16. BOT Basis for time in 100 days.
PWD, Rajasthan. YEAR: 2000-01.

Construction of Sewage Treatment Plant for Pimpri Chinchwad Municipal Corporation at Completed in time
17. Sanghvi, Pune for in 6 months.
M/s. Thermax Ltd. - Waste Management Division. YEAR: 2000–01.