You are on page 1of 6

CLIENT : M/s Technoforce Solution (I) Private Limited

OFFER NO: SCEW/2434/22-23


To, DATE 17-03-2023
CONTACT
TELEPHONE
KIND ATT. Mr. Abhishek Nikam
CELL - 8956319582

EMAIL abhisheknikam@technoforce.net

EQUIPMENT 2Ton x 5M Lift Wire rope hoist with Electric trolley

Dear Sir / Madam,

We wish to thank you for the valued enquiry and pleasure in submitting our Quotation, for your kind consideration.

We are glad to inform you that we are an ISO 9001:2015 certified manufacturers of Material Handling Products
established in the year1979. We supply all types of Cranes, Electric Hoists, Electric Cage hoists, Goods cum
Passenger Lifts, Hydraulic Goods cum Passenger Lifts .You may refer our website www.scranes.in for details.
We specialize in giving a Total Solution for the customer's material handling requirements.
Our ultra modern 6 acres workshop is located at Talasari, Maharashtra (NearSanjan Rly Station East) with all
machine tools and testing facilities.

Against your requirement we are glad to offer as follows:-.

A. Technical specifications
B. Commercial Price
C. Supply scope
D. Erection & Commissioning Scope
E. Terms & Conditions
F. Bank Details

We trust that you will find above in order. Kindly acknowledge receipt and revert in case of any queries you may
contact our G.M. Mr. Paresh Joshi

Regards,
For S. CRANE ENGG.WORKS
Mr. Rohit Mishra Mr. Paresh Joshi
Project Engineer (Techno-Commercial Manager)
+91-8850354516 09324158505

A-101 / 102, Jethe Tower CHSL, Ambawadi, S.V. Road, Dahisar (E), Mumbai – 400 068
Tel: 022 28955361, 28951230, 28919320
Email: sales@s-cranes.com, Website: www.scranes.in
A. TECHNICAL SPECIFICATIONS:

Construction Hoist of fabricated construction complete with brake, motor, drum,


gear box, wire rope, hook block, electrical control pendent push
button station.
Safe Working Load-Main Hoist 2 Ton
Class of Duty Class II as per IS 3938
Operation From Pendant Push Button control station.
Location Indoor- Non Hazardous atmosphere
Height of Lift 5 Mtrs
Travel Length 5 Mtrs
Main Hoisting Speed 3 m/min
Cross Travel Speed 12 m/min
Main Hoist Motor Rating 2 HP
Cross Travel Motor Rating 0.5 HP
Hoist & CT brake type Electro- magnetic DC Brake
Wire Rope Diameter 11 mm
Hoist Number of Falls 2 fall
Wire Rope FMC (Make Usha Martin)
Hook Single shank, forged as per IS: 15560, Swiveling type
Limit Switches (Hoist & C.T.). Included on hoisting only.(If CT Limit switch require charges will be
Extra)
All Motors Motor As per IS Standard
Power / Control Voltage 415V, 3Phase, 50Hz / 110V, 1Ph, 50HZ
MCB (Miniature Circuit Breaker) Prevents overload condition
Rope Drum Made from seamless pipe on which wire rope groves are accurately
machined for proper sitting of wire rope.
Rope guide Provided to prevent slackening of rope
Contractors Siemens
Gear & Pinion Material EN-9 and EN-24
Monorail Beam Not Considered (If required, charges will be extra)
Painting / Surface treatment 1. Scrubbed with wire brush.
2. Surface cleaned with cleaner solutions.
3. Two coats of reinforced polymer based paint.
PLC PLC System Arrangement(if required charges will be extra)

B. COMMERCIAL PRICE:

Sr. DESCRIPTION RATE / UNIT


No. ( Ex-Works Talasari –Palghar)
For – 1Nos
1 Supply of Monorail Beam Existing
Supply of 2T x 5 Mtrs. Lift Wire Rope Electric Hoist
with Electric Trolley having hoisting speed 3m/min,
2 Rs. 1,12,000/-
Motor 2HP, cross travel speed
12m/min, Motor 0.5HP, 2 Fall, Rope dia 11mm.
3 CT cabling arrangement for 5Mtrs Travel length Rs. 12,500/-
4 Erection and commissioning of above arrangement at your site EXTRA
C. SUPPLY SCOPE:

Description Scope Considered Remarks


Monorail beam alignment to be set
Monorail Beam Customer within tolerances for smooth operation
of hoist.
Cabling to be done as per standards for
Insulated bus bars / Festoon System S Cranes
smooth movement of hoist.
Power supply up to Insulated bus bars /
Festoon Cabling should be provided by
Power Supply up to Insulated bus bars Customer
customer with isolator/ MCB switch near
to installation area.

D. ERECTION & COMMISSIONING SCOPE:

Scope of Work Scope Considered Remarks


Material unloading & In-site material Resources: Man-power, Hydra/ Mobile
Customer
movement Crane, Slings & Tackles, etc.
Customer to provide sufficient access for
Mobile crane and/or hydra/Farana for
Customer mobile crane / hydra movement with
installation
material.
Safe Access to be provided for site
activities. In case customer’s access is not
Scaffolding arrangement for installation Customer
available, then customer should provide
scaffolding arrangement at site.
Resources Manpower, dead load, Hydra/
Mobile Crane, Sling & Tackles. Load
Load for load test Customer
should be placed at execution bay below
crane hook.
Any civil work, if required as per site
Civil Work Customer
conditions.
Power supply and water to operate
Power Supply & Water Customer erection tools and commissioning of
crane.

NOTE: The above are our conditions for contract. However if these are not specifically addressed at the time of
finalization of order, all these conditions will be deemed to be applicable.
E. COMMERCIAL TERMS & CONDITIONS:

1] Taxes : CGST (9%) & SGST (9%) OR IGST (18%), or such rate as applicable at the
time of dispatch of material.
2] Service tax : 18% GST, or such rate as applicable at the time of installation.
3] Packing & Forwarding : As applicable extra.
4] Transit Insurance : As applicable extra.
5] Transport : As applicable extra.
6] Anything which is not specifically covered above shall be borne by the buyer.
7] All ORIGINAL bank guarantee DOCUMENTS, be it advance bank guarantee [ ABG ] or performance bank
guarantee [ PBG ] need to be returned to our Mumbai office within seven days of date of expiry mentioned in BG,
failing which interest at the rate of 18% p.a., shall be charged & payable by the party for the delay exceeding seven
days of expiry. Additionally if the party opts for a claim period extending beyond the expiry date then the interest
at the rate of 18 % be borne by the party for such extension.
8]Delivery schedule: 4-5 weeks time after the receipt of P.O., advance & approved drawing whichever is later.
9] Erection & commissioning schedule: 3-4 weeks subject to clear site conditions to carry out work without
interruption. Soft Copy of Maintenance manual will be furnished after successful erection & commissioning at site.

10] Payment terms - supply portion:


30% of the supply order value as advance with signed purchase order.
70% of the supply order value with 100% taxes payable after your satisfactory inspection at our factory
and before dispatch of the equipment.

11] Payment terms - erection portion:


50% of the work order value as advance for mobilization of erection team at site.
50% of the work order value with 100% taxes to be paid within 7 days of commissioning & hand-over of
equipment or 30 days from the date of Erection of equipment whichever is earlier.

12] Pre dispatch Inspection at our works:


We will raise an inspection call 7 days in advance. However, if the customer/ inspector is unable to visit our works &
inspect the material within 30 days; the inspection should be waived off by the customer. Internal test reports &
test certificates shall be provided on request.
13] Acceptance:
The client shall accept the delivery of material & will notify us of any defects within 21 days of dispatch.If the client
fails to notify us of any such defects within the given period, the delivery shall be deemed to have been accepted.
The client will allow us for inspecting any defective equipment at the site.
14] Our documents:
All drawings, designs & guidance are the property of S.Cranes and has a cost. Any unauthorized usage ofthe
same directly or indirectly shall tantamount to actionable claims.

15] Warranty:
a)For only supply items: 12 months from the date of dispatch.
b)For equipment involving supply & erection commissioning: 12 months from the date of successful erection &
commissioning OR 18 months from the date of dispatch whichever is earlier. For bought out items warranty
available will be on back to back basis.
c) The warranty shall not cover any damages during transit, bad storage, misuse or mishandling of equipment at
client’s site &damages resulting from adaptations or adjustments made to the equipment by the client without
specific approval by S. Crane Engineering Works.
d) Note that the following parts like wire rope, rope guide, knobs, labels, stickers, fuses,
Brake pads, brake discs and brake liners, indicator lamps, light bulbs, glass items and plastic items will not
covered in warranty.
e) Our warranty does not cover any electrical components. (Cables, push buttons, switches, replays, contactors,
transformers, rectifiers, motor & brakes)
f) The warranty does not cover the risk to the product caused by accident, lightening, water, fire, earthquake, or
other acts of God, improper handling, excessive shocks or any external cause beyond our control.
g) The warranty does not cover any damages on account of running the equipment with any power supply other
than those recommended in specifications. No other cause of action or liability whether direct, indirect or
consequential, incidental shall lie on us.
h) In case we were supposed to carry out erection and commissioning of the supplied equipment, the same will be
handed over after satisfactory erection & commissioning work. The customer is not supposed to use the equipment
which is not completely erected & commissioned and handed over by us. In case of such unsafe usage by client, our
warranty will not be applicable.
i) If payment is not made to us per the stipulation of the purchase order, warranty terms will not be applicable and
we will not be liable to provide any services to customer.
16] Delivery conditions:
a) We will dispatch the goods to the client as per the purchase order on the receipt of the complete payment
including taxes and duties as per the purchase order.
b) Above delivery period is subject to force majeure conditions and/ or reasons beyond our control.
c) All deliveries shall be ex-works’ Company’s facility at Talasari (Thane district, Maharashtra) and the title & risk of
loss shall pass to the client at this delivery point.We will make reasonable efforts to deliver equipment to a carrier
at the delivery point on the estimated delivery date for transportation to the locations specified in the clients
purchase order.
d) Deliveries shall be in quantities specified in the purchase orders. Part deliveries shall be allowed after acceptance
on both sides.
e) Date of inspection as given in our inspection call should be treated as the date of delivery, if the purchase order
specifies L.D. or penalty conditions.
17] Storage charges:
If the client does not pick up the material in 7 days after dispatch clearance, we will levy a demurrage charge
@1 % of the total order value per week. The payment towards this has to be made by client before dispatch
of equipment. If this period of storage exceeds 60 days from the inspection /inspection call date/dispatch
clearance; we will be at liberty to forfeit the advance payment received and salvage the material to recover
our losses in the transaction.
18] Interest for delayed payment: Interest @ 2% p.m. shall be charged for all delayed payments to be calculated
on daily basis.
19] E.M.D.:We are registered with NSIC and hence are exempt from payment of any E.M.D.
20] Jurisdiction: Mumbai
21] Validity: This offer is valid for a period of 7 days from the quotation date and thereafter subject to our written
confirmation.

Thanks & regards,


For S.CRANE ENGG. WORKS

F. BANK DETAILS:

Bank Name: HDFC BANK


Bank A/c. Name: S. Crane Engineering Works
Bank Branch Address: Shreeram Trade Centre, SVP Road, Chamunda Circle,
Opp. Jain Temple; Borivali (W)
Mumbai - 400 092
Account No: 50200045226581
Account Type: Current Account
MICR No: 400240027
IFSC Code: HDFC 0000145
NEFT Code: HDFC 0000145
SWIFT Code: HDFCINBB
Branch Code: 145

Company Name & S. Crane Engineering Works,


Address: A-101, Jethe Tower,
Ambawadi, S.V. Road,
Office Dahisar (E),
Mumbai – 400 068
Proprietor: SandeepSadanandSukhija
Pan No : AAFPS8574C
TAN No : MUMS 309 57 D
Factory Address: S. Crane Engineering Works
Village: Ghimaniya,
Taluka: Talasari, Dist: Palghar,
Maharashtra: 401 606.
GSTIN No: 27AAFPS8574C2ZC
GST ARN No. AA270919060819E
ESIC No : 31-47007-67
EPF Reg. No MH/ 92507
Import Export Code 397078897
Year of Establishment 1979