ARC_CEILING SCHEDULE KEY PLAN

MARK DESCRIPTION
C1 GYPSUM BOARD 9mm
C2 GYPSUM BOARD WET TYPE 9mm
C3 SANDWICH PIR PANEL 50mm
C4 SANDWICH MINERAL WOOL INSULATION PANEL 50mm
9 10
L.26
STAIR
42 42
n 10
C1 n
10
AREA
MUSHOLA

QA/QC LAB
4260

L.26
10
C1 C1
42 42 10 10 10 CH. +6.550
CH. +6.550 CH.10+6.550 L.26
8 3865 3060 1500 1500 1500 2250
6000 6000
NOTES AND LEGEND
A B C
- THIS DRAWING IS NOT A SHOP DRAWING
- ANY DIMENSIONS AND TECHNICAL SOLUTIONS DEPICTED ARE PURPOSE FOR
DESIGN INTENT ONLY AND NEED TO BE DEVELOPED FURTHER ON CONTRACTOR
SHOP DRAWINGS AND SUBJECT TO VERIFICATION AND APPROVAL BY A/E AND
PLAN CEILING-1ST FLOOR BUILDING 32 OWNER AND FIELD VERIFICATION PRIOR TO CONSTRUCTION
SCALE: 1 : 150 -THE CONTRACTOR SHALL CHECK ALL DRAWINGS, VERIFY LEVEL AND
DIMENSIONS ON SITE PRIOR TO COMMENCEMENT WORK HE SHALL REPORT
DISCREPANCIES IT ANY TO OWNER'S REPRESENTATIVE BEFORE
COMMENCEMENT OF WORKS
- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
- ALL LEVELS ARE IN METERS UNLESS NOTED OTHERWISE
L.02
9 L.01 L.02
n
10
L.01
10 10
52 52 42 42 LOBBY nBATTERY29
29
C1
CH. +2.800

CHARGING n
42 42
CH. +2.800
4260

C1 C1 C1
10 10 10
C1 L.24
52 52
52 n
52 42 n
42 CH. +2.800 29
CH. +5.00029
10 10 10 L.02 L.25

EXIT
QA/QC LAB L.01 OFFICE L.02
L.01
FINISHED GOOD
8
L.25
115 115 115 n
115 115 115 L.30
L.03
C1
n
115 n
115
52 52 52 52 52 52 CH. +7.000
L.04
4280

52 52
PALLETIZING AREA
L.03 L.04
EXIT

L.03
52 52 n
52 52 52 52
7 C1
CH. +5.000 L.06 L.05
4260

52 52 52 52 52 52 52 52
L.23
XP
6
L.05 L.06 L.22
XP
52 52 52 52 52 52 n
115 115 115 n
115 115 115 n
115 115
52 52
L.06
L.05
L.10
MATERIAL STORAGE LOADING AREA
4400

C3
29 29 C3 29
L.09
L.08 NO CEILING
L.10 L.09
L.05 L.06
CH. +3.000
L.07 C1
52 52 52
L.10
52 CH. +3.000
L.09 L.07 CH. +7.000
5 52 52 n
52 52
L.08 L.07 L.08 52 52
PIT
n n n 0 = REVISION MARK = REVISION CLOUD
4260

52 52 52 52 52 52 52 52 115 115 115 115 115 115 115


COLL ECT ION PIT
52 52
DISPENCING L.21 L.29 0 -
& MIXING AREA XP
L.28
-
4
XP
L.20
52 n
52 52 52
C3 n
52 52 52 52 -

EXIT
L.21
CH. +5.000 -
4280

29 - - - - - -
n
52 52 52 n
52 52
C3 L.17
C3 - - - - - -
52 52 52 52 52 52 52 n
52 n
29
CH. +3.000 n
52 52 52 NICOTINE STORAGE
52 52 52 52
3

EXIT
L.08
NICOTINE ROOM - - - - - -
L.17 L.19
52
52 52
C3 52 52 C1 L.18
- - - - - -
CH. +5.000 CH. +5.000
n n - - - - - -
4260

52 52 52 52 52 52 52
L.17
52 52 52 52 52 n
52 52 52
52 52 52 52 52
L.16 52 0 ISSUED FOR CONSTRUCTION UBY IRA AD 17-01-2023
CA TANK L.16
L.13 L.18 NO. DESCRIPTION BY CHKD APVD DATE
2
EXIT
L.11
L.12
29 29 29
C1 L.13C1

29
ZERO NICOTINE 29 29 29 29 29
WTP/RO AREA n
52 52 52 29 29
52 52 52 L.15
ROOM L.12 29 29
4143

29 NO CEILING
n
29 29 CH. +3.000
TOTE L.13 TOTE WASHING ROOM APPROVED BY CLIENT
L.11
L.11
C3 L.13 AHU ROOM
29 29 29 AFTER WASHING C1 NO CEILING L.14
52CH. +4.50052 52 n
52 52 52
29 n
29 29 29 n
29
CH. +4.500
1 C1
L.13
52 CH. 52+4.500 n
52
L.12 n
29 29

EXIT
L.14
L.15
29 29 29 29 29 L.14
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
60000 GROUP
A B C D E F G H I J K DRAWING TITLE :
BUILDING 32
PLAN CEILING-GROUND FLOOR BUILDING 32 PLAN CEILING - GROUND FLOOR & 1st FLOOR
SCALE: 1 : 150
SCALE : 1:100 FORMAT SIZE : A1
PROJECT DRAWING NO. REV
P-21-018 BAT-DWG-DD-AR-01-AR-1106 0 -