Thereby, the inspection is Pass or Not Pass and can Proceed or Cannot Proceed
For starting work.
The above works have been inspected by the undersigned at the time shown & permission to proceed
with the next activity has not been granted to above remark.
Checked By : I.O.W
Name / Signature:
Date:
Time:
Revised on 20/7/22
PRE-CONCRETING INSPECTION CHECKLIST M&E
Service: Plumbing
• Piping Layout
• Position / Level
• Box Out Position
• Opening & Size (C/W Floor)
• Trimmer Bars
Date: Date:
Revised on 19/2/18
KERJAYA PROSPEK (M) SDN BHD
PROJECT: KAIA HEIGHT
FIRE FIGHTING CONTRACTOR : FEDAPI SDN BHD
CONCEALED CONDUIT INSTALLATION CHECKLIST
INSPECTION DATE:
SYSTEM : FA
LOCATION:
DRAWING REF: FED/1901/EQP/MEC/PH1/MF/LP
ACCEPTABILITY
ITEM DESCRIPTION N/A REMARKS
YES NO
Check whether conduit size,
1 length and brand area correct
and according to specification
Check whether point position
are marked according to
2
approved construction drawing