REQUEST FOR INSPECTION

PROJECT : PROJEK PENGHANTARAN 132/33/11kV PMU KARAMUNSING, KOTA KINABALU, SABAH

TO: AMIR MADANI RUNDING RFI Ref :

DATE REQUESTED :

ATTN: MR. SYAHRIL

The following works / tests are ready for inspection / will be conducted at ...................... (time) on ................... (date)

DESCRIPTION OF WORKS

LOCATION : ……………………………………………………………………………………………

NATURE OF WORKS : ……………………………………………………………………………………………

……………………………………………………………………………………………

……………………………………………………………………………………………
SKETCHES (if required) :

Note :

SUBMITTED BY : RECEIVED BY RE / RA / COW:

SIGNATURE : SIGNATURE :

NAME : NAME :

TIME /DATE : TIME / DATE :

CC 1) 3)

2) 4)
INSPECTION / TEST RESPONSE

Inspection acceptable / Test Passed*. Works are allowed to proceed

are allowed to Inspection


proceed. unacceptable / Test failed*. Contractor to propose and carry out remedial works.
Re-inspection required.
to propose and carry out remedial works.
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………

SIGNATURE: ……………………(RE/RA/COW) NAME:……………………….. DATE:…………….


NAME : ....................................... DATE: ....................