DOC. NO.

HOT WORK PERMIT


REV.0

Project : SCIENCE MUSEUM AB KSA /Subcontractor: Al-Bawani Co.


Permit No : ALB / SM / PTW / Date: / / 2019

SECTION I PERMIT REQUEST


Description of hot work:  Welding  Gas Cutting  Soldering  Brazing  Blow torch  Abrasive wheel cutting
Location on Site: … ……………………………………………. Name of welder: …………………………………………..
 
Duration of work - Date: From: Hrs. To: Hrs.

SECTION II (Requirement for the Permit)


Y N N/A Y N N/A
 Person engaged are fully qualified and  Grinder /cutting machines are free from defects,
trained. equipped with pressure switch & safety guard.
 Are abrasive wheels to standard
 Workers fully aware of Risk Assessment.
(EN/BS) required and compliance.
 Affected areas are cleared of flammable materials.  Use right / correct wheel on grinder.
 Machine spindle speed is less than that of the
 Sufficient and suitable Fire Extinguishers provided.
maximum speed of the wheel / Disc.
 Wet fire resistant cloth / fire blanket / gunny bag has  Abrasive wheel flange (front or back) is of right size
been kept to control falling sparks. and fitting.
 Flash back arrestor installed between regulator and Use of grinders to be on proper working platform, not
gas hose. on ladders or steps.
 Gas cylinder and fittings are free from oil, grease,
 Supervisor will available all time.
leakage and legibly marked and kept on trolley.
 Operatives are in possession of suitable PPE.  Location plan / layout attached.

 Welding machine / equipment tested and free from  Fire watcher appointed.
defects (cables, holder etc.). Name: ……………………………………………
 Gas cylinders are kept in a safe place / outside  Any other precautions
confined space. …………………………………………………………
Work-in-Charge(Name): …………………………… Signature: …………………… Contact No. ……………………

 The above precautions / requirements are in place.


 AB KSA Subcontractor Risk Assessment No. …………………….. Dated …………………… was addressed to the team
and work in-charge on (Date)……………….. , and they are fully aware of the same.
Site Manager / Engineer(Name): Signature:
HSE Officer(Name): Signature:

Section III PERMIT ISSUE


This Permit is valid till (Date): Time: Hrs.

Fire watching must be done for one hour after completion of work.
AL-BAWANI Construction KSA Site Manager / Engineer AL-BAWANI Construction KSAHSE Officer

Name: Signature: Name: Signature:


Hrs. Hrs.
Extension granted up to: 1 on 2 on

Section IVPERMIT CLOSURE


SUBCONTRACTOR AL-BAWANI Construction KSA

Works completed On ……………............. at ………..hrs.


Area inspected and the permit closed on …………………….. at
One hour fire watch period finished, area inspected and the
…………. Hrs.
permit closed at ……….. hrs.

Name: Name:

Signature: Signature:

Revised on Page 1 of 1