Professional Documents
Culture Documents
Operations
Danny Di Perna, Executive Vice President and Chief Operating Officer
―――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――
Services
Matthew Byrne, President, Services
―――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――――
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 2
1
Operations
Danny Di Perna
▪ € 40bn Orders
24 months
▪ € 87bn Backlog
Manufacturing Digitalisation
(AOS – Advanced Operations System)
Workplace Collaboration
(Teams, SharePoint, etc.)
Function Digital
Tools
(HR, T&A, etc.)
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 5
APSYS, our Alstom continuous improvement program
Driving process excellence and performance through rigour and discipline across all activities
214%
Top of the Class Scope = 180 Sites
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation from Alstom, is strictly prohibited. 6
Enterprise risk management process active
Mitigation actions deployed to face our challenging times
• Covid lockdown • Long term • Site Delivery • Inflation • Energy supply • Geopolitical
risks overcome semiconductor Centers focused challenges and cost risks mitigation
with temporary needs secured with on mitigating mitigated by secured through plan for strict
inventory increase partnerships, scarce material securing supplier supplier monitoring and
and flexible allocations and customer’s agreements and development
transportation alternate sources contracts and company wide alternative
routes and redesigns stringent cost energy saving sources of
measures plan energy in all
sensitive areas
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 7
Electronic component crisis management
Dedicated global and multi-disciplinary team driving supply chain execution
Sustained tension on lead-times Preferred part list being defined for 15 product
families
● 2x to 6x higher vs. pre-crisis
100
levels on critical components Proactive Intimacy with manufacturers / preferred
2020
2021
2022
2023
2024
2025
measures relationships
● While Consumer segments are
in excess stocks, sustained Legal support and client management
Note: Base 100 for 2020-2021 actuals, demand on Industrial and
2022-2025 forecasts (Gartner Apr. 2023)
Auto
Semiconductors market trends monitoring
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 8
Inflation impact on material and wages
Largely mitigated by stringent cost measures and contract management
350 Steel
Reinforced selectivity for fix and
World HRC common steel
3 firm price contracts
Aluminium
250 World Aluminium Sheets
Back-to-back with suppliers for
200 Copper 4 fix and firm contracts
World electrolytic copper
150
US Wage
US manufacturing salaries1 Long term planning and
100 5 securing material supplies
Europe Wage
Europe mfg. salaries2
0
2019 2020 2021 2022 2023 2024 2025 2026 Application of stringent cost
6 measures to mitigate headwinds
1. Forecasted data based on inflation rate in the US | 2. Eurostat labour cost index published quarterly | 3. US Producer Price Index by Industry: Semiconductors and Related Device Manufacturing
Source: World Bank, Eikon Datastream, HSBC, Federal Reserve Economic Data, Oxford Economics, Oliver Wyman analysis
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 9
Quality excellence drives customer confidence and satisfaction
Design for Quality Gates Open Delivery Quality to Customer
DFQ Backlog – Total Year End
- 42%
Q # of Demerits/Unit – Avg Year
- 67%
Leg. AT
Leg. AT + Leg. BT
Pre Acq April 2021 March 2022 March 2023 Pre Acq April 2021 March 2022 March 2023
300 8.5
250
8
200
7.5
150
7
100
50 6.5
0 6
17/18 18/19 19/20 20/21 21/22 FY22/23
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation from Alstom, is strictly prohibited. 10
Alstom’s global supply chain – a competitive advantage
Leveraging our proximity to customers for localization and best cost capabilities
% of global spend
• Improve supply chain Performance to deliver projects and reinforce Direct Commodities Critical Suppliers
Risk Management culture
• Deploy decarbonization plan for Scope 3, Purchased Goods and • Strengthen supplier development • Performance of most impactful
(capacity and capability) improved by ~30% in a year
Services : -30% in 2030
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation from Alstom, is strictly prohibited. 11
Investing in cutting-edge technology R&D gross effort above
Our completed convergence unleashes innovation for success step-up €700m1
“Lead societies
ALSTOM INNOVATION LEADERSHIP to a low carbon
GREEN
MOBILITY
future”
GREEN TRACTION HYDROGEN
“Make mobility
simple to operate
SMART and ride”
MOBILITY
PREDICTIVE ON-BOARD ELECTRONIC
MAINTENANCE PRODUCTS
“Create mobility
solutions that all
BROADEST COMPONENT INCLUSIVE AND people can enjoy
BUILDING BLOCK PORTFOLIO
HEALTHIER
MOBILITY riding”
● Low CAPEX and ● Optimized products ● Environmental ● Less noise ● Train communication
Optimized OPEX footprint network
● Local content ● Inclusion and easy
● Full electrical train with ● Energy efficiency ● Onboard Information
access for everyone
maximum energy ● Cutting-edge Systems framework:
● Low weight
savings technology ● Enhanced ride comfort remote maintenance,
● Low noise telecommunication,
● High reliability and ● Full range of ● Passenger-friendly
availability cybersecurity
maintenance ● Eco-design design, lighting,
● Lifecycle management ● Recyclability integrated information ● Information tailored to
● Overhaul expertise passenger needs
● Digital solutions
© ALSTOM SA, 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited. 13
Alstom… up & running and on-track!
© ALSTOM SA, 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited. 14
2
Rolling Stock
and Components
Benjamin Fitoussi
RECENT WINS
1. CAGR of 2.8 % based on UNIFE accessible rolling stock market 2019-2021 to 2025-2027 period
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 16
ALSTOM: a unique global-local presence and capability
Enables customer proximity & localization while leveraging global best cost sources
AMERICAS
ALSTOM #1 IN ALL REGIONS
EUROPE
DERBY BARCELONA
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 17
Project stabilisation | Task Forces shifting from legacy to early phase projects
Efficiency and
Review all customer requirements,
Deep dive Stabilise and End of
legacy secure new stabilisation Continuous drive configuration management
projects projects robust improvement
process
Align project scheduling & resources
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 18
Convergence done at Train, Sub-system and Part levels
Focusing today on implementation in tenders
From Day 1 FY 2021/22 FY 2022/23 FY 2023/24
INVENTORY CONVERGE RATIONALISE FURTHER STANDARDIZE
✓ Early Spec-in
Metropolis™
✓ Drive standardisation in tender
phase / maximise leverage of
Commuter Locomotive High-speed standard solutions
(Rebranding
100% Traxx™ Avelia™
In progress)
done
© ALSTOM SA, 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited. 19
Operational performance | Quality on target, focusing on delivery
Pre-acq Apr Mar Mar Mar Mar Pre-acq Apr Mar Mar Mar Mar Pre-acq Apr Mar Mar Mar Mar Pre-acq Apr Mar Mar Mar Mar
AT ’21 ‘22 ‘23 ’24 ‘25 AT ’21 ‘22 ‘23 ’24 ‘26 AT x2 ’21 ‘22 ‘23 ’24 ‘25 AT ’21 ‘22 ‘23 ’24 ‘25
+22% on Mar 23
Pre-acq
Pre-acq Apr
Apr Mar
Mar Mar
Mar Mar
Mar Mar
Mar Pre-acq Apr Mar Mar Mar Mar Pre-acq Apr Mar Mar Mar Mar Pre-acq Apr Mar Mar Mar Mar
AT
AT ’21
’21 ‘22
‘22 ‘23
‘23 ’24
’24 ‘25
‘25 AT ’21 ‘22 ‘23 ’24 ‘25 AT ’21 ‘22 ‘23 ’24 ‘26 AT ’21 ‘22 ‘23 ’24 ‘25
1 2 3 4 5
Won 57 Projects Progressed product Deliveries back to Invested in additional Mitigated
securing development & nominal customer capacity and operational & financial
€10.3 bn orders rationalization satisfaction capability headwinds
49 Coradia Stream for Renfe World’s 1st hydrogen fleet Wroclaw : aluminum carbody Customer deliveries secured
Germany
9 products phased-out
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 21
23/24 and beyond | accelerate the transformation journey to deliver the
committed synergies
1 2 3 4 5
Win profitable Bring our Best in class
Get the best of our Leverage our people
tenders with operations to processes with
footprint and scale skills and capabilities
innovative & required level of increased
standard products performance digitalisation
• Platform positions as • Massification & • Project Management by • GSI roll out in 40+ sites • Site End-End capabilities
strong market leaders specialisation in Sub-System • Advanced Operation • Recruitment
• Leverage largest development & • Strictly Apply Design for Systems (AOS) • Training & Development
geographical coverage manufacturing Quality Process (DFQ) • Supply Chain & • 1000+ expert network
• Leading the way on • BCC engineering up to • Change & Configuration Procurement (Ariba) • Leverage World Class Special
decarbonisation with 1st 42% by 2025 Management • Industrial Planning Process Standards
battery train in • BCC manufacturing up to • Engineering efficiency & (Kinaxis)
commercial service 60% by 2025 automation • PLM4A
• Compact HCC • Supplier & Supply Chain
capacity development 22
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited.
Significant investment in R&D to bring best solutions to our customers
AGATE 4 upgrade
Atlas 400 in Traxx Coradia Stream ext.
IPCEI financing H2
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited.
IPCEI H2 financing strengthens Alstom leadership on Green Traction technologies
• Boost H2 solutions
development
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited.
RSC turnaround with production ramp-up supporting growth above market
RSC PROFITABILITY IMPROVEMENT LEVERS HEADWINDS
BUSINESS PROFILE MONITORING
FY 2022/23:
• Backlog 42.8bn€
DEVELOPMENT
• Orders 10.3bn€
BUSINESS
Product convergence
LEVERS
• Sales 8.8bn€ Selectivity ELECTRONIC
COMPONENT
Increased % of Platforming & CRISIS
Typical mid to large contracts: Standardisation
projects indexed Cost premiums
• From >100m to multi-billion€
• 3 to >5 years
SUPPLY CHAIN
Cash:
• 5 to 10% downpayments Operational excellence Synergies from process Build a robust and capable
OPERATIONAL
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 26
3
Services
Matthew Byrne
President, Services
Most extensive rail services portfolio, expertise and footprint
~37*
ALL ENCOMPASSING PORTFOLIO CLEAR LEADERSHIP OVER THE RAIL SERVICES MARKET bn€
DIGITAL SOLUTIONS
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation from Alstom, is strictly prohibited. 28
Strategy on track with market drivers and customer needs
© ALSTOM SA, 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited. 29
Service franchise has exceeded its mid-single digit growth guidance
FAST GROWING ORDER INTAKE SINCE MERGER ACCELERATING BOOK TO BILL OUTPACING MARKET GROWTH
~2% CAGR
UNIFE*
Market Growth
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 30
Business model and evolution (bundle contracts, installed based advantage, small
contracts)
Standalone
© ALSTOM SA, 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited. 31
Mid-term ambition: 35% of installed base under services contract
Today Mid-term
Parts Supply /
Component Overhauls
TSSSA
OPERATIONAL EXCELLENCE
OPTIMISED CUSTOMER
COST OF OWNERSHIP
CUSTOMER INTIMACY
Baden-Württemberg
BEST IN CLASS RELIABILITY 30 years Full Maintenance 130 Coradia StreamTM HC
Maryland Transit Administration MARC
ENERGY CONSUMPTION COMMITMENT 15 years Operation and maintenance – Mixed fleet
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 33
Service franchise with strong predictability and high-single digit growth
FY2022/23:
DEVELOPMENT
Small orders RESOURCES
Bundle TSSSA AVAILABILITY
• Backlog 30.7bn€
BUSINESS
offers management opportunities
LEVERS
• Orders 6.4bn€ focus
To support growth
• Sales 3.8bn€ Harvesting installed base
Local Improvement of
Footprint fleet availability and reliability
LEVERS
Cash:
• Limited mobilisation payments
Low Scale effect on Data
(depots, capital spares) R&D needs management
• Positive working capital
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 34
4
Signalling and
Systems
Jean-François BEAUDOIN
>20% high-speed capacity >25% metro capacity → ETCS BECOMING A GLOBAL STANDARD
(Paris – Lyon ERTMS Level 2 (Shangai L3 / L4, Fluence
and then Hybrid L3) delivered by CASCO Joint venture)
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 36
Source: UNIFE market study (Alstom Addressable market excl. Japan & China) 1- 2022-2024 2- CAGR 2019-2021 to 2025-2027 3. ERTMS: European Rail Traffic Management System
Signalling, a market segment under consolidation around 3 global players
~x 5-10 size 4%
3 players2
1- Global layers considered >500m€ revenues present in Alstom addressable market 2- Thales/Hitachi Merger expected in 2023 3- Alstom addressable market excl. Japan and China, CAGR 2019-2021 to 2025-2027
4- FY22/23 vs. FY21/22
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 37
Alstom positioned as the most global signalling partner
MOST COMPLETE SIGNALLING PLAYER 45+ POSITIONED ON ALL KEY SIGNALLING MARKETS
Countries
with local
presence
Top 10 signalling worldwide markets
LARGEST PORTFOLIO EXTENSIVE FOOTPRINT Alstom & Bombardier merge unlocking access to German market
& installed base (customer intimacy & efficiency)
(strong services growth potential)
SUSTAIN LEADERSHIP
SUCCESSFUL COMMERCIAL DYNAMIC
SUCCESSFUL & AMBITIOUS PLAN
ATLAS ONBOARD Stuttgart projects
GERMAN
THE MOST DESIRED considered as trend setter for
ROLL-OUT
SOLUTION the German roll-out
COMMERCIAL
DYNAMIC ~700 m€
orders
SCALE-UP BENEFITTING
FROM DECREASING ENTRY BARRIERS FOR ALSTOM FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 FY25/26
BOMBARDIER LEGACY
WAYSIDE
ALSTOM LEGACY
•Interlocking
ETCS Level 2 •Braunschweig signalling site
technology bricks •Existing customer intimacy ~70 m€ revenues
in FY 20/21
(before the merge)
>30%
sales
CAGR
ALSTOM R&D
Digital Object Controller development
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 39
Deliver projects locally leveraging a worldwide footprint
ACCESS TO LARGE
Key BCC sites TALENT POOLS
(e.g. IT resources in India…)
India Thailand Poland Brazil
SIGNALLING Eng. FTE 2,700+ 500+ 400+ 200+
SOLUTIONS
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 40
A sustained pace of innovation introduced in customer projects
PORTFOLIO
Delhi-Meerut project illustration:
INSTALLED HARDENING
• Most advanced ERTMS solutions BASE STRATEGY
• Hardware/software decoupling in
operations SERVICES TO
SUPPORT CYBER
TRANSFORMATION &
CUSTOMERS
OPERATIONS
-40%
travel
time
Leverage
Lead RAILWAY CYBER ~350 rail CYBER
ENABLERS
EXPERTS
STANDARDS design PARTNERSHIPS
(CENELEC, IEC)
ERTMS Hybrid Level 3
(Delhi Meerut, India)
18-19 19-20 20-21 21-22 22-23 23-24 24-25
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 41
Signalling franchise set for high-single digit growth
SIGNALLING HEADWINDS
PROFITABILITY IMPROVEMENT LEVERS
BUSINESS PROFILE MONITORING
DEVELOPMENT
Small orders High Single Digit growth pattern ELECTRONIC
Selectivity
FY2022/23:
BUSINESS
boost o/w services fast development COMPONENT
LEVERS
• Backlog 7.5bn€ CRISIS
• Orders 2.9bn€ Harvesting customer long term relationship Improving, backlog to
be delivered
• Sales 2.4bn€
Increased share of contract indexation
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 42
Systems commercial success driving double digit growth
© ALSTOM SA 2023. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use, alter or disclosure to third parties, without express written authorisation, is strictly prohibited. 43
www.alstom.com
www.alstom.com