Professional Documents
Culture Documents
.
Government of India
Demo data: Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4 Laning of Fagne - Guj - Maharastra Border section of NH-06 from Km 510.000 to Km. 595.794
underNHDP Phase III in the state of Maharashtra on Design, Build, Finance, Operate and Transfer (DBFOT) basis
INDEPENDENT CONSULTANT
CONCESSIONAIRE
CONTRACTOR
RFI No. Date
Structure No. : Type of Structure: MJB
Chainage: 547+344 Part of Structure: PSC Girder (Inner)
Carriageway / Side: MCW / RHS Prepared By:
BOQ No. BAR BENDING SCHEDULE
No. of Bars
Bar Description of Element Shape of Bar Dia Spacing No. of Total No. Cutting Length Total Length Total Weight (Kg) Remarks
Mark (c/c) Elements Per of Bars (Rmt) (Rmt)
Element
h1 Compression bar in Top Flange 0.100 19.220 0.100 12 - 1 6 6 19.372 116.232 103.214
h2 Tension Bar in Bottom Flange 0.300 19.220 0.300 32 - 1 4 4 19.628 78.512 496.196
h2 Tension Bar in Bottom Flange 0.300 19.220 0.300 32 - 1 4 4 19.628 78.512 496.196
h3 Bottom Flange Corner Bar 0.100 19.220 0.100 10 - 1 2 2 19.380 38.760 23.915
0.075
0.220
0.075
0.220 to 0.520
0.075
h5b Web Stirrups in Varying Portion 12 150 2 6 12 4.232 to 4.832 53.808 47.782
1.845
0.520
0.075
h5c Web Stirrups in End Portions 12 200 2 7 14 4.784 66.976 59.475
1.845
0.220
0.075
h5c Web Stirrups in End Portions 12 200 2 7 14 4.184 58.576 52.015
1.845
0.150
0.189
0.520
0.150
Bottom Flange Cross Stirrups in
h6a 0.445 to 0.625 10 200 2 4 8 2.048 to 2.408 17.184 10.603
Varying Portion
0.189
0.520
0.720
0.720
0.720
h7c Top Flange Stirrups at End 0.075 0.308 12 100 2 7 14 1.822 25.508 22.651
Portion
0.570 0.081
0.075
0.038
0.075 0.038
8 mm 8.642 Kg
10 mm 450.627 Kg
12 mm 783.782 Kg
Summary 16 mm 0.000 Kg
20 mm 0.000 Kg
25 mm
Total 0.000 Kg
Weight 1243.051 Kg
(Kg)
Grand Total - 1.243 MT