MAHI PROJECT

MAHI BRANCH CANAL


Design Calculation of Minor - 1L Based on Williom and Hazen Equation
1L Minor Pipe Hydraulic Calculations

Total Comand Area in Ha : 561.26 Ha


Designed Command Area in Ha : 561.26 Ha
duty in Ha/Cumec : 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) : 0.432 Cumec
Number of Wells : 12 no
Total discharge/well (cum/sec) : 0.036 Cumec
MINOR -1L (1925 M)
0-W1 W1-W2 W2-W3,W4 W4-W5 W5-W6 W6-W7
Pipe beginning point RL 428.590 427.940 427.515 427.165 426.887 426.509
Pipe ending point RL 427.940 427.515 427.165 426.887 426.509 426.137
Lenth of pipe (L) in meter 650 425 350 125 189 186
Head loss (Hf) 0.650 0.425 0.350 0.278 0.378 0.372
Hydraulic Slope (S) 0.001 0.001 0.001 0.002 0.002 0.002
Volumetric flow rate (Q) cum/sec 0.432 0.396 0.360 0.288 0.252 0.216
Pipe roughness Coefficient 140 140 140 140 140 140
Inside diameter (D) in meter 0.747 0.723 0.697 0.544 0.528 0.498
Velocity (V) m/sec 0.991 0.970 0.948 1.248 1.158 1.116
Area (A) sqm 0.438 0.410 0.382 0.232 0.219 0.195
Proposed Dia of pipe (mm) 800 800 800 600 600 600
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 4R and Sub Minor-1 To 5 Based on Williom and Hazen Equation
4R Minor Pipe Hydraulic Calculations
Design of minor& sub minor
Minor-4R Sub Minor-1 Sub Minor-2 Sub Minor-3 Sub Minor-4 Sub Minor-5
Total W2-W6 W8-W11 W15-W16 W20-W22 W23-W24
Total Comand Area in Ha 1411 230.01 172.46 56.001 114.61 55.93 Ha
Designed Command Area in Ha 1411 230.01 172.46 56.001 114.61 55.93 Ha
duty in Ha/Cumec 1300 1300 1300 1300 1300 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 0.76 0.76 0.76 0.76 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) 1.0853846154 0.176930769231 0.132661538462 0.043077692308 0.0881615384615385 0.0430230769230769 Cumec
Number of Wells 25 4 3 1 2 1 no
Total discharge/well (cum/sec) 0.043 0.044 0.044 0.043 0.044 0.043 Cumec

MINOR (1940 M) SUB MINOR-1 (2264 M) MINOR (1366 M) SUB MINOR-2 (1124 M)
0-W1 W1-W2 W2-W3 W3-W4 W4-W5 W5-W6 W2-W7 W7-W8 W8-W9 W9-W10
Pipe beginning point RL 421.285 419.769 418.275 417.125 416.247 406.372 418.075 416.191 414.000 411.200
Pipe ending point RL 419.769 417.919 417.125 416.247 415.217 405.312 416.403 415.131 412.770 410.736
Lenth of pipe (L) in meter 872 1068 633 483 567 584 836 530 679 255
Head loss (Hf) 1.516 1.85 1.15 0.878 1.03 1.06 1.6721 1.06 1.23 0.464
Hydraulic Slope (S) 0.00174 0.00173 0.00182 0.00182 0.00182 0.00182 0.00200 0.00200 0.00181 0.00182
Volumetric flow rate (Q) cum/sec 1.085 1.042 0.177 0.133 0.088 0.044 0.822 0.778 0.133 0.088
Pipe roughness Coefficient 140 140 140 140 140 140 140 140 140 140
Inside diameter (D) in meter 0.946 0.933 0.471 0.422 0.362 0.278 0.827 0.810 0.422 0.362
Velocity (V) m/sec 1.550 1.533 1.023 0.955 0.866 0.734 1.536 1.516 0.953 0.867
Area (A) sqm 0.704 0.683 0.174 0.140 0.103 0.061 0.538 0.516 0.140 0.103
Proposed Dia of pipe (mm) 1000 1000 500 500 400 300 800+300 800+200 500 400
Provided Dia of pipe (mm) 1000 1000 500 500 400 300 800+400 800+300 500 400
R-2 (1124 M) MINOR (1952 M) SUB MINOR-3 (893 M) MINOR (1317 M) SUB MINOR-4 (823 M) MINOR (853 M) SUB MINOR-5 (839 M) MINOR (500 M)
W10-W11 W8-W12 W12-W13 W13-W14 W14-W15 W15-W16 W15-W17 W17-W18,19 W19-W20 W20-W21,22 W20-W23 W23-W24 W23-W25
403.640 415.131 413.553 413.059 406.500 397.500 404.400 402.324 400.907 400.366 398.366 396.660 396.660
403.295 413.553 413.059 411.917 405.810 395.880 403.355 400.907 400.083 399.550 396.660 386.982 393.660
190 789 247 571 345 893 338 567 412 449 853 839 500
0.345 1.578 0.494 1.142 0.69 1.62 1.045 1.417 0.824 0.815999999999974 1.706 1.678 3.000
0.00182 0.002 0.002 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.002 0.002 0.006
0.044 0.602 0.559 0.515 0.472 0.043 0.385 0.299 0.255 0.088 0.124 0.043 0.037
140 140 140 140 140 140 140 140 140 140 140 140 140
0.278 0.735 0.715 0.693 0.670 0.275 0.567 0.538 0.531 0.361 0.403 0.270 0.204
0.734 1.426 1.401 1.374 1.345 0.729 1.533 1.321 1.161 0.866 0.976 0.758 1.150
0.061 0.425 0.401 0.377 0.353 0.060 0.253 0.227 0.221 0.103 0.128 0.057 0.033
300 600+500 600+400 600+400 600+300 300 600 600 600 400 500 300 250
300 800 800 800 800 300 600 600 600 400 500 300 250
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 3R Based on Williom and Hazen Equation
3R Minor Pipe Hydraulic Calculations

Total Comand Area in Ha 216.84 Ha


Designed Command Area in Ha 216.84 Ha
duty in Ha/Cumec 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) 0.1668 Cumec
Number of Wells 4 no
Total discharge/well (cum/sec) 0.042 Cumec
MINOR-3R (1301 M)
0-W1 W1-W2 W2-W3,W4
Pipe beginning point RL 421.107 417.457 416.862
Pipe ending point RL 417.457 416.862 414.007
Lenth of pipe (L) in meter 577 298 425
Head loss (Hf) 1.154 0.596 0.850
Hydraulic Slope (S) 0.002 0.002 0.002
Volumetric flow rate (Q) cum/sec 0.167 0.125 0.083
Pipe roughness Coefficient 140 140 140
Inside diameter (D) in meter 0.451 0.405 0.347
Velocity (V) m/sec 1.049 0.979 0.889
Area (A) sqm 0.160 0.129 0.095
Proposed Dia of pipe (mm) 500 500 400
Provided Dia of pipe (mm) 500 500 400
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 2R and Sub Minor-1,2 Based on Williom and Hazen Equation
2R Minor Pipe Hydraulic Calculations
MINOR-2R SUB MINOR-2 SUB MINOR-1
Total W8-W9 W1-W3
Total Comand Area in Ha 605.69 52.37 147.61 Ha
Designed Command Area in Ha 605.69 52.37 147.61 Ha
duty in Ha/Cumec 1300 1300 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 0.76 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) 0.4659153846 0.040284615385 0.113546153846 Cumec
Number of Wells 10 1 2 no
Total discharge/well (cum/sec) 0.047 0.040 0.057 Cumec
MINOR -2R (4464 M) SUB MINOR-1 (1087 M) SUB MINOR-2 (599 M)
0-W1 W1-W4 W4-W5 W5-W6 W6-W7 W7-W8 W8-W10 W1-W2 W2-W3 W8-W9
Pipe beginning point RL 427.723 425.829 415.503 413.120 412.590 411.312 410.746 425.829 423.909 410.746
Pipe ending point RL 425.829 415.503 413.120 412.590 411.312 410.746 406.601 423.909 423.655 409.548
Lenth of pipe (L) in meter 777 1606 562 265 639 283 332 960 127 599
Head loss (Hf) 1.894 10.326 2.383 0.53 1.278 0.566 4.145 1.92 0.254 1.19799999999952
Hydraulic Slope (S) 0.00244 0.00643 0.00424 0.00200 0.00200 0.00200 0.01248 0.00200 0.00200 0.00200
Volumetric flow rate (Q) cum/sec 0.466 0.419 0.373 0.326 0.280 0.233 0.186 0.114 0.057 0.040
Pipe roughness Coefficient 140 140 140 140 140 140 140 140 140 140
Inside diameter (D) in meter 0.640 0.504 0.525 0.582 0.549 0.513 0.323 0.390 0.300 0.263
Velocity (V) m/sec 1.455 2.112 1.731 1.231 1.187 1.136 2.285 0.957 0.810 0.747
Area (A) sqm 0.322 0.200 0.217 0.267 0.237 0.206 0.082 0.120 0.071 0.054
Proposed Dia of pipe (mm) 500+500 600 600 600 600 600 400 400 300 300
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 1L Based on Williom and Hazen Equation
1L Minor Pipe Hydraulic Calculations

Total Comand Area in Ha : 561.26 Ha


Designed Command Area in Ha : 561.26 Ha
duty in Ha/Cumec : 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) : 0.432 Cumec
Number of Wells : 12 no
Total discharge/well (cum/sec) : 0.036 Cumec
MINOR -1L (1925 M)
0-W1 W1-W2 W2-W3,W4 W4-W5 W5-W6 W6-W7
Pipe beginning point RL 428.590 427.940 427.515 427.165 426.887 426.507
Pipe ending point RL 427.940 427.515 427.165 426.887 426.507 426.137
Lenth of pipe (L) in meter 650 425 350 125 190 185
Head loss (Hf) 0.650 0.425 0.350 0.278 0.380 0.370
Hydraulic Slope (S) 0.001 0.001 0.001 0.002 0.002 0.002
Volumetric flow rate (Q) cum/sec 0.432 0.396 0.360 0.288 0.252 0.216
Pipe roughness Coefficient 140 140 140 140 140 140
Inside diameter (D) in meter 0.747 0.723 0.697 0.544 0.528 0.498
Velocity (V) m/sec 0.991 0.970 0.948 1.248 1.158 1.116
Area (A) sqm 0.438 0.410 0.382 0.232 0.219 0.195
Proposed Dia of pipe (mm) 800 800 800 600 600 500
Provided Dia of pipe (mm) 800 800 800 600 600 600
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 5R and Sub Minor-1,2 Based on Williom and Hazen Equation
5R Minor Pipe Hydraulic Calculations
Minor-5R Sub Minor-1 Sub Minor-2
Total W1-W31 W3-W6
Total Comand Area in Ha 1838.7 730.38 181.39 Ha
Add 15% 275.805 109.557 27.2085 Ha
Designed Command Area in Ha 2114.505 839.937 208.5985 Ha
duty in Ha/Cumec 1300 1300 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 0.76 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) 1.6265423077 0.64610538462 0.16046038462 Cumec
Number of Wells 31 12 3 no
Total discharge/well (cum/sec) 0.052 0.054 0.053 Cumec
MINOR-5R
0-W1 W1-W2 W2-W3 W3-W7 W7-W8 W8-W9 W9-W10 W10-W11
Pipe beginning point RL 421.107 408.852 406.541 404.323 401.567 397.165 394.855 394.265
Pipe ending point RL 408.852 406.541 404.323 401.567 397.165 394.855 394.265 393.239
Lenth of pipe (L) in meter 1877 406 1109 778 701 1155 295 513
Head loss (Hf) 12.255 2.311 2.218 2.756 4.402 2.31 0.59 1.026
Hydraulic Slope (S) 0.007 0.006 0.002 0.004 0.006 0.002 0.002 0.002
Volumetric flow rate (Q) cum/sec 1.627 1.574 1.522 1.469 1.417 1.364 1.312 1.259
Pipe roughness Coefficient 140 140 140 140 140 140 140 140
Inside diameter (D) in meter 0.841 0.854 1.045 0.917 0.804 1.003 0.988 0.973
Velocity (V) m/sec 2.940 2.758 1.780 2.232 2.800 1.734 1.718 1.701
Area (A) sqm 0.556 0.574 0.859 0.661 0.508 0.790 0.767 0.744
Proposed Dia of pipe (mm) 1000+300 1000+300 1000+300 1000+300 1000+200 1000 1000 1000
Equation

SUB MINOR-1
W11-W12 W12-W13 W13-W14 W14-W15 W15-W16,17,18,19 W1-W20 W20-W21 W21-W22 W22-W23 W23-W24 W24-W25 W25-W26
393.239 392.897 391.667 391.517 389.056999999997 408.852 404.026 401.49 400.632 398.508 397.722 395.71
392.897 391.667 391.517 389.057 387.328999999997 404.026 401.49 400.632 398.508 397.722 395.71 393.25
171 615 75 731 363 1163 518 429 312 393 506 480
0.342 1.23 0.15 2.46 1.72800000000012 4.826 2.536 0.858 2.124 0.786 2.012 2.46
0.002 0.002 0.002 0.003 0.005 0.004 0.005 0.002 0.007 0.002 0.004 0.005
1.207 1.154 1.102 1.049 0.997 0.646 0.592 0.538 0.485 0.431 0.377 0.323
140 140 140 140 140 140 140 140 140 140 140 140
0.957 0.941 0.925 0.816 0.745 0.650 0.608 0.705 0.527 0.648 0.535 0.479
1.684 1.666 1.648 2.017 2.297 1.957 2.051 1.388 2.239 1.316 1.691 1.809
0.720 0.696 0.672 0.523 0.436 0.332 0.290 0.390 0.218 0.329 0.225 0.180
1000 1000 1000 1000 800 800 800 800 600 800 600 500
R-1 SUB MINOR-2
W26-W27 W27-W28 W28-W29 W29-W30,31 W3-W4 W4-W5 W5-W6
393.25 392.442 392.116 390.006 404.322 398.102 394.438
392.442 392.116 390.006 387.284 398.102 394.438 387.446
404 163 305 361 560 332 746
0.808 0.326 2.11 2.722 6.22 3.664 6.992
0.002 0.002 0.007 0.008 0.011 0.011 0.009
0.270 0.216 0.162 0.108 0.160 0.107 0.053
140 140 140 140 140 140 140
0.542 0.498 0.346 0.292 0.313 0.269 0.213
1.177 1.115 1.734 1.630 2.101 1.902 1.507
0.231 0.195 0.094 0.067 0.077 0.057 0.036
600 500 400 300 400 300 300
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 7R and Sub Minor-1 Based on Williom and Hazen Equation
7R Minor Pipe Hydraulic Calculations
MINOR
Total
Total Comand Area in Ha 482.03 Ha
Add 15% 72.3045 Ha
Designed Command Area in Ha 554.3345 Ha
duty in Ha/Cumec 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) 0.4264112 Cumec
Number of Wells 9 no
Total discharge/well (cum/sec) 0.047 Cumec
MINOR-7R
0-W1 W1-W2 W2-W3 To W9
Pipe beginning point RL 418.126 417.771 417.16
Pipe ending point RL 417.771 417.16 416.675
Lenth of pipe (L) in meter 532 917 728
Head loss (Hf) 0.355 0.611 0.485
Hydraulic Slope (S) 0.001 0.001 0.001
Volumetric flow rate (Q) cum/sec 0.426 0.379 0.332
Pipe roughness Coefficient 140 140 140
Inside diameter (D) in meter 0.808 0.773 0.735
Velocity (V) m/sec 0.837 0.813 0.787
Area (A) sqm 0.513 0.469 0.424
Proposed Dia of pipe (mm) 800 800 600+400
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 2R and Sub Minor-1,2 Based on Williom and Hazen Equation
2R Minor Pipe Hydraulic Calculations
MINOR-2R SUB MINOR-2 SUB MINOR-1
Total W8-W9 W1-W3
Total Comand Area in Ha 605.69 52.37 147.61 Ha
Add 15% 90.8535 7.8555 22.1415 Ha
Designed Command Area in Ha 696.5435 60.2255 169.7515 Ha
duty in Ha/Cumec 1300 1300 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 0.76 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) 0.5358026923 0.046327307692 0.130578076923 Cumec
Number of Wells 10 1 2 no
Total discharge/well (cum/sec) 0.054 0.046 0.065 Cumec
MINOR -2R (4464 M) SUB MINOR-1 (1087 M) SUB MINOR-2 (599 M)
0-W1 W1-W4 W4-W5 W5-W6 W6-W7 W7-W8 W8-W10 W1-W2 W2-W3 W8-W9
Pipe beginning point RL 427.723 425.829 415.503 413.120 412.590 411.312 410.746 425.829 423.909 410.746
Pipe ending point RL 425.829 415.503 413.120 412.590 411.312 410.746 406.601 423.909 423.655 409.548
Lenth of pipe (L) in meter 777 1606 562 265 639 283 332 960 127 599
Head loss (Hf) 1.894 10.326 2.383 0.53 1.278 0.566 4.145 1.92 0.254 1.19799999999952
Hydraulic Slope (S) 0.002 0.006 0.004 0.002 0.002 0.002 0.012 0.002 0.002 0.002
Volumetric flow rate (Q) cum/sec 0.536 0.482 0.429 0.375 0.321 0.268 0.214 0.131 0.065 0.046
Pipe roughness Coefficient 140 140 140 140 140 140 140 140 140 140
Inside diameter (D) in meter 0.675 0.532 0.554 0.614 0.579 0.541 0.341 0.411 0.316 0.278
Velocity (V) m/sec 1.504 2.184 1.790 1.273 1.227 1.175 2.363 0.989 0.838 0.772
Area (A) sqm 0.358 0.222 0.241 0.296 0.264 0.230 0.091 0.133 0.079 0.061
Proposed Dia of pipe (mm) 500+500 600 600 600 600 600 400 500 300 300
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 4R and Sub Minor-1 To 6 Based on Williom and Hazen Equation
4R Minor Pipe Hydraulic Calculations
Design of minor& sub minor
minor-4r sub minor-1 sub minor-2 sub minor-3 sub minor-4 sub minor-5
Total W2-W6 W8-W11 W15-W16 W18-W19 W20-W22
Total Comand Area in Ha 1411 230.01 172.46 56.001 36.22 114.61
Add 15% 211.65 34.5015 25.869 8.40015 5.433 17.1915
Designed Command Area in Ha 1622.65 264.5115 198.329 64.40115 41.653 131.8015
duty in Ha/Cumec 1300 1300 1300 1300 1300 1300
Duty in (lit/sec/Ha) 0.76 0.76 0.76 0.76 0.76 0.76
head Discharge of pipe (cum/sec) 1.2481923077 0.2034703846154 0.1525607692308 0.0495393461538 0.0320407692307692 0.101385769230769
Number of Wells 24 4 3 1 1 2
Total discharge/well (cum/sec) 0.052 0.051 0.051 0.050 0.032 0.051

MINOR (1940 M) SUB MINOR-1 (2264 M) MINOR (1366 M)


0-W1 W1-W2 W2-W3 W3-W4 W4-W5 W5-W6 W2-W7 W7-W8
Pipe beginning point RL 421.285 419.769 418.275 417.125 416.247 406.372 418.075 416.191
Pipe ending point RL 419.769 417.919 417.125 416.247 415.217 405.312 416.403 415.131
Lenth of pipe (L) in meter 872 1068 633 483 567 584 836 530
Head loss (Hf) 1.516 1.85 1.15 0.878 1.03 1.06 1.6721 1.06
Hydraulic Slope (S) 0.00174 0.00173 0.00182 0.00182 0.00182 0.00182 0.00200 0.00200
Volumetric flow rate (Q) cum/sec 1.248 1.196 0.203 0.153 0.102 0.051 0.941 0.889
Pipe roughness Coefficient 140 140 140 140 140 140 140 140
Inside diameter (D) in meter 0.998 0.983 0.497 0.445 0.382 0.293 0.871 0.852
Velocity (V) m/sec 1.603 1.584 1.057 0.987 0.896 0.759 1.587 1.565
Area (A) sqm 0.783 0.759 0.194 0.156 0.114 0.068 0.596 0.571
Proposed Dia of pipe (mm) 1000 1000 500 500 400 300 800+400 800+300
sub minor-6
W23-W24
55.93 Ha
8.3895 Ha
64.3195 Ha
1300 Ha/Cumec
0.76 lit/sec/Ha
0.0494765384615 Cumec
1 no
0.049 Cumec

SUB MINOR-2 (1124 M) MINOR (1952 M) SUB MINOR-3 (893 M) MINOR (905 M) SUB MINOR-4 (537 M) MINOR (412 M)
W8-W9 W9-W10 W10-W11 W8-W12 W12-W13 W13-W14 W14-W15 W15-W16 W15-W17 W17-W18 W18-W19 W18-W20
414.000 411.200 403.640 415.131 413.553 413.059 406.500 397.500 404.400 402.324 400.907 400.907
412.770 410.736 403.295 413.553 413.059 411.917 405.810 395.880 403.355 400.907 399.931 400.083
679 255 190 789 247 571 345 893 338 567 537 412
1.23 0.464 0.345 1.578 0.494 1.142 0.69 1.62 1.045 1.417 0.975999999999999 0.824
0.00181 0.00182 0.00182 0.002 0.002 0.002 0.002 0.002 0.003 0.002 0.002 0.002
0.153 0.102 0.051 0.684 0.632 0.580 0.528 0.050 0.427 0.375 0.026 0.297
140 140 140 140 140 140 140 140 140 140 140 140
0.445 0.381 0.293 0.772 0.749 0.725 0.699 0.290 0.590 0.586 0.227 0.562
0.986 0.896 0.759 1.470 1.443 1.413 1.382 0.754 1.570 1.395 0.646 1.204
0.156 0.114 0.068 0.468 0.441 0.413 0.384 0.066 0.273 0.270 0.041 0.248
500 400 300 800 800 800 800 300 600 600 250 600
SUB MINOR-5 (823 M) MINOR (853 M) SUB MINOR-6 (839 M) MINOR (500 M)
W20-W21 W21-W22 W20-W23 W23-W24 W23-W25
400.366 399.550 398.366 396.660 396.660
399.550 398.870 396.660 386.982 393.660
449 374 853 839 500
0.816 0.68 1.706 1.678 3.000
0.002 0.002 0.002 0.002 0.006
0.049 0.000 0.195 0.073 0.073
140 140 140 140 140
0.290 0.000 0.479 0.330 0.263
0.754 0.000 1.089 0.860 1.350
0.066 0.000 0.180 0.085 0.054
400 300 500 300 250
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 3R Based on Williom and Hazen Equation
3R Minor Pipe Hydraulic Calculations

Total Comand Area in Ha 216.84 Ha


Add 15% 32.526 Ha
Designed Command Area in Ha 249.366 Ha
duty in Ha/Cumec 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) 0.19182 Cumec
Number of Wells 4 no
Total discharge/well (cum/sec) 0.048 Cumec
MINOR-3R (1301 M)
0-W1 W1-W2 W2-W3,W4
Pipe beginning point RL 421.107 417.457 416.862
Pipe ending point RL 417.457 416.862 414.007
Lenth of pipe (L) in meter 577 297 427
Head loss (Hf) 1.154 0.594 0.854
Hydraulic Slope (S) 0.002 0.002 0.002
Volumetric flow rate (Q) cum/sec 0.192 0.144 0.096
Pipe roughness Coefficient 140 140 140
Inside diameter (D) in meter 0.476 0.427 0.366
Velocity (V) m/sec 1.085 1.012 0.919
Area (A) sqm 0.178 0.143 0.105
Proposed Dia of pipe (mm) 500 500 400
MAHI PROJECT
MAHI BRANCH CANAL
Design Calculation of Minor - 1L Based on Williom and Hazen Equation
1L Minor Pipe Hydraulic Calculations

Total Comand Area in Ha : 561.26 Ha


Add 15% : 84.189 Ha
Designed Command Area in Ha : 645.449 Ha
duty in Ha/Cumec : 1300 Ha/Cumec
Duty in (lit/sec/Ha) 0.76 lit/sec/Ha
head Discharge of pipe (cum/sec) : 0.496 Cumec
Number of Wells : 12 no
Total discharge/well (cum/sec) : 0.041 Cumec
MINOR -1L (1925 M)
0-W1 W1-W2 W2-W3,W4 W4-W5 W5-W6 W6-W7
Pipe beginning point RL 428.590 427.940 427.515 427.165 426.887 426.509
Pipe ending point RL 427.940 427.515 427.165 426.887 426.509 426.137
Lenth of pipe (L) in meter 650 425 350 125 189 186
Head loss (Hf) 0.650 0.425 0.350 0.278 0.378 0.372
Hydraulic Slope (S) 0.001 0.001 0.001 0.002 0.002 0.002
Volumetric flow rate (Q) cum/sec 0.496 0.455 0.414 0.331 0.290 0.248
Pipe roughness Coefficient 140 140 140 140 140 140
Inside diameter (D) in meter 0.788 0.762 0.735 0.573 0.557 0.525
Velocity (V) m/sec 1.024 1.003 0.981 1.290 1.197 1.154
Area (A) sqm 0.488 0.456 0.425 0.258 0.244 0.217
Proposed Dia of pipe (mm) 800 800 800 600 600 600