You are on page 1of 1

FUNDAMENTALS OF POWER PLANT DESIGN – FINALS FUNDAMENTALS OF POWER PLANT DESIGN – FINALS

1. ___________ is an industrial facility which houses the 1. ___________ is an industrial facility which houses the
necessary equipment, such as prime mover, electric necessary equipment, such as prime mover, electric
generators, and auxiliaries, to generate electrical energy generators, and auxiliaries, to generate electrical energy
from primary energy such as mechanical, chemical, from primary energy such as mechanical, chemical,
nuclear, etc. nuclear, etc.
2. __________ power plant generally uses heat as the main 2. __________ power plant generally uses heat as the main
source of energy to produce electricity. source of energy to produce electricity.
3. __________ power plant makes use of flowing water to 3. __________ power plant makes use of flowing water to
produce electricity. produce electricity.
4. __________ power plant uses diesel to fuel an internal 4. __________ power plant uses diesel to fuel an internal
combustion (IC) engine prime mover. combustion (IC) engine prime mover.
5. __________ power plant absorbs kinetic energy from wind 5. __________ power plant absorbs kinetic energy from wind
to generate electricity which is a renewable energy source to generate electricity which is a renewable energy source
and environment friendly. and environment friendly.
6. __________ power plant uses the natural rise and fall of 6. __________ power plant uses the natural rise and fall of
the tides to generate electricity which is also renewable the tides to generate electricity which is also renewable
and environment friendly. and environment friendly.

7-10.) ESSAY: The importance of a power plant. (4 sentences or 7-10.) ESSAY: The importance of a power plant. (4 sentences or
more.) more.)

Solving: Solving:

1. A power plant consumes 3,600 tons of coal per day. If the 1. A power plant consumes 3,600 tons of coal per day. If the
coal has an average energy content of 10,000 BTU/lb, what coal has an average energy content of 10,000 BTU/lb, what
is the plant’s power output? Assume an overall efficiency is the plant’s power output? Assume an overall efficiency
of 15 percent. of 15 percent.
2. A hydroelectric generating station is supplied form a 2. A hydroelectric generating station is supplied form a
reservoir of capacity 5 x 10^6 m^3 at a head of 200 meters. reservoir of capacity 5 x 10^6 m^3 at a head of 200 meters.
Find the total energy available in KWHR if the overall Find the total energy available in KWHR if the overall
efficiency is 75%. efficiency is 75%.
3. A small wind generator is designed to generate 50kW of 3. A small wind generator is designed to generate 50kW of
power at a wind velocity of 25miles per hour. What is the power at a wind velocity of 25miles per hour. What is the
approximate blade diameter? approximate blade diameter?
4. A generating station is to supply four regions of load whose 4. A generating station is to supply four regions of load whose
peak loads are 10 MW, 5 MW, 8 MW and 7 MW. The peak loads are 10 MW, 5 MW, 8 MW and 7 MW. The
diversity factor at the station is 1.5 and the average annual diversity factor at the station is 1.5 and the average annual
load factor is 60%. Calculate the annual energy supplied by load factor is 60%. Calculate the annual energy supplied by
the station. the station.
5. A power plant is said to have a use factor of 48.5% and a 5. A power plant is said to have a use factor of 48.5% and a
capacity factor of 42.4%. How many hours did it operate capacity factor of 42.4%. How many hours did it operate
during the year? during the year?
6. A 100 MW power station delivers 100MW for 2 hours, 50 6. A 100 MW power station delivers 100MW for 2 hours, 50
MW for 8 hours and is shut down for the rest of each day. MW for 8 hours and is shut down for the rest of each day.
It is also shut down for maintenance for 60 days each year. It is also shut down for maintenance for 60 days each year.
Calculate its annual load factor. Calculate its annual load factor.
7. A power station has a peak demand of 80 MW and load 7. A power station has a peak demand of 80 MW and load
factor of 0.60. If the capacity factor is 50% and utilization factor of 0.60. If the capacity factor is 50% and utilization
factor is 80%, find the daily energy produced in MWHR. factor is 80%, find the daily energy produced in MWHR.
8. The power plant demand of 90 MW, capacity factor of 8. The power plant demand of 90 MW, capacity factor of
0.50, use factor of 0.60 and load factor of 0.60. Find the 0.50, use factor of 0.60 and load factor of 0.60. Find the
plant installed capacity. plant installed capacity.
9. A generating station supplies peak loads of 12000KW, 9. A generating station supplies peak loads of 12000KW,
9000KW and 6000KW. Calculate the maximum demand of 9000KW and 6000KW. Calculate the maximum demand of
the station and the energy is supplies in a year if its the station and the energy is supplies in a year if its
diversity factor and its average annual load factor is 1.2 diversity factor and its average annual load factor is 1.2
and 70%. and 70%.
10. The total generating capacity of a power plant is 1600KVA. 10. The total generating capacity of a power plant is 1600KVA.
The total connected load is 2500Kva. Average load is 1145 The total connected load is 2500Kva. Average load is 1145
KVA. The maximum power demand is 1150KVA. What is KVA. The maximum power demand is 1150KVA. What is
the plant factor? the plant factor?

You might also like