WORK PLAN FOR SENIOR CITIZEN AND YOGA PARK-AREA OF THE PARK 8125 SQM

SL NO DISCRIPTION ITEMS TO BE EXECUTED START DATE END DATE

PROJECT COMPLETION DATES 30 March 2023 30 July 2023


No of Days As per the Duration 122.00
No of Days Elapsed #REF!
No of Days Remaining #REF!

DEVELOPMENTAL WORKS-CIVIL WORKS

1 DISMANTLING OF THE EXISTING COMPUND WALL- 1.01 Dismantling of lime or cement mortar brick work including stacking
BRICK WORK of dismantled materials with in 60m distance as directed by Engineer in
charge.

2 FIXING OF RAILING FOR THE COMPOUND WALL Extra Item-New Item - 1.04 Providing and fixing hand rail of approved
size by welding etc. to steel ladder railing, balcony railing, staircase
railing and similar works, including applying priming coat of approved
steel primer.

3 LAYING OF PATH WAY 1.12 Excavation , 1.15 PCC 1:3:6 , 1.19 Toe Wall Brick Work
Construction , 1.09 Pathway Laying with Brick on Edge of Floring on
Bed of 12mm Cement Mortar 1:4

4 ENTRY GATE AND PERGOLA NORTH DIRECTION , MULTI COLOURED PAVED AREA WITH
STEEL PERGOLA ,, LARGE PARK MAP DISPLAY BOARD - 1.04
Providing and fixing hand rail of approved size by welding etc. to steel
ladder railing, balcony railing, staircase railing and similar works,
including applying priming coat of approved steel primer.

5 AMPHITHEATOR SEATING IN RED SAND STONE AND SOFT LANDSCAPE- 1.03


Excavation , 1.15 PCC 1:3:6 , 1.19 Brick Work Construction, 1.21 12mm
Thick Cement Plaster 1:6,1.11 Supply and Filling in Plinth with Sand
Under Floors,1.16 RCC Work 1:2:4,1.18-DPC 2.5cm Thick,Water
Prrofing,Steps Etc
6 YOGA AREA WEST SIDE , NEAR TO OPEN GYM , SOFT GREEN COVERAGE IN
FORM OF LAWN (NILGIRI GRASS)
7 OPEN AIR GYM AREA FITTED WITH EXCERCISING EQUIPMENTS-
ENCLOSED ROOM FOR CARD GAME,CORROM ETC ,
8 PAVILLION/AMUSEMENT ROOM ( 7 X 7 ) PYRAMIDICAL SLOPING ROOF STRUCTURE,GLASS WALL
PARTITION
STONE FLOORING OF TWO DIFFERENT COLOR,SIZE OF CHESS
9 GAINT CHESS BOARD ( 8 X 8 )
COLUMNS (1mX1m) ,
WORK PLAN FOR SENIOR CITIZEN AND YOGA PARK-AREA OF THE PARK 8125 SQM
SL NO DISCRIPTION ITEMS TO BE EXECUTED START DATE END DATE
10 CHATHRI RCC COLUMNS-4 NOS WITH RCC DOME AND
PROJECTION,FLOORING WILL BE GRANITE STONE,DOME SIZE
WILL BE 5.880M DIAMETER,HEIGHT OF THE CHATHRI FROM
GROUND LEVEL TO DOME BOTTOM WILL BE 3.450M, RCC
DOME HEIGHT WILL BE 2.330 M
11 DRINKING FOUNTAIN
12 KIOSK- 4 NOS - ( 4.5 X 4.5 ) RAISED FLOORING OF HEIGHT 0.30M TWO STEPPED BRICK
WORK , MS COLUMN - 4 NOS (HEIGHT 2400mm),SLOPING ROOF
WITH ASBESTOS SHEET FIXED TO MS FRAME-HEIGHT OF THE
SLOPING ROOF 1500mm)

13 TENNIS COURT - 1 NOS - ( 30 X 15 ) 2.01 Excavation in Ordinary soil, 2.02 PCC 1:3:6- Drain Work -Deapth
100mm, 2.03 M150 Brick Work 1:4 Mortar-Drain Work-Toe Wall-
( Deapth 350mm), 2.04 12mm Thick Cement Plaster 1:6-Drain Walls,
2.05 Cement Concrete 1:2:4-For Tennis Court Thickness 100mm,2.06
RCC Work 1:2:4 100 mm thick
13 VOLLEYBALL COURT - 1 NOS ( 34 X 19 ) 3.01 Excavation in Ordinary soil & Backfilling,Ramming in Layers.30m
Lead-For Volleyball Court & Drain (Deapth 150mm), 3.02 M150 Brick
Work 1:4 Mortar-Drain Work-Toe Wall-( Deapth 400mm), 3.03 12mm
Thick Cement Plaster 1:6-Drain Walls, 3.04 PCC 1:3:6- Drain &
Volleyball Court -Deapth 100mm, 3.05 Supplying & Filling plinth with
Sand- Volleyball Court 300mm thick , 3.06 Sports Accessories-
Installation of Fixed Volleyball Post Making & Net

14 BADMINTON COURT - 2 NOS (16.4 X 8.5) 4.01 Excavation in Ordinary soil & Backfilling,Ramming in Layers.30m
Lead-For Badminton Court (Deapth 150mm),4.02 PCC 1:3:6- Badminton
Court -Deapth 150mm,4.03 M150 Brick Work 1:4 Mortar-Drain Work-
Toe Wall-( Deapth 350mm),4.04 12mm Thick Cement Plaster 1:6-Drain
Walls,4.05 Providing,spreading and Laying Stone agreegate to wet mix
Macadam-For Badminton Court-100mm Thick,4.06 RCC Work 1:2:4
100mm Thickness,4.07 For thermo mechanical treated bars of FE-
500,4.08 Sports Accessories-Installation of Removable Badminton Poles
Making & Net

15 TOILET AND SECURITY ROOM


CIVIL WORKS 5.01 Dismantling of Cement Mortar Brick work 1:5, 5.02 PCC Footing
1:3:6, 5.03 RCC Footing 1:2:4, 5.04 Column RCC 1:2:4, 5.05 2.5 mm
thick and of cemnet concrete, 5.06 Brick Work 1:6, 5.07 slab 1:2:4, 5.08
Steel reinforcement for R.C.C, 5.09 Plaster, 5.10 Painting, 5.12 Ceramic
Wall Tiles, 5.13 Ceramic Floor Tiles, 5.14 Door Shutter PVC, 5.15 Fixed
Glazed Windows UPVC,5.25 Marble Kitchen Vanity Counter Top,
WORK PLAN FOR SENIOR CITIZEN AND YOGA PARK-AREA OF THE PARK 8125 SQM
SL NO DISCRIPTION ITEMS TO BE EXECUTED START DATE END DATE
SANITARY WORKS 5.11 110 mm diameterU-PVC pipes, 5.16 Water Closet Pedestal
European ,5.17 Wash Basin White Vitreous China Wash basin size
550x400 mm Jaquar, 5.18 Bib Cock Brass, 5.19 Soap Dish Holder, 5.20
Mirror 6mm, 5.21 Water Tank -Polythene, 5.22 CPVC Pipes Hot and
Cold,5.23 Rain Water Pipes, 5.23 Rain Water Pipes-PVC, 5.24 Gully
Trap CI Grating with Chamber Cover, 5.26 Urinal Partition Stone Slab,
5.27 Urinal Basin

16 ELECTRICAL ESTIMATE FOR SENIOR CITIZEN


PARK
6.01 Supply & Fix Factory Wired LED Flood Light,Cast Aluminium Housing Built,100-120 Watts,
6.02 Cartage,Painting ,fixing of existing pole for light fixing.
6.03 Supply & Erection of factory fabricated & wired metal clad dust and vermin proof floor mounting, M.S. Channel Base with
bottom and top cable entreis Electrical control panel with TPN MCCB's,
6.04 Incoming 100 Amp MCCB -1 No & Outgoning 63 Amp. MCCB-1 No & 32 Amp. MCCB-2 Nos.,

6.05 Supply and laying of aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade,

6.06 25 sq. mm 3-1/2 core,


6.07 16 sq. mm 4 core,
6.08 Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc.,
6.09 63 mm dia (OD-63 mm & ID-51 mm nominal),
6.10 Supply and burring of Safe Earthing Electrode T-19, (Hot Dip Galvanized),
Length
6.11 up to 3000mm,
Supplying outer
and fixing of Dia 50nickel
brass mm inner Dia 25 mm,
compression terminal
gland Diainsulated
for PVC 12mm, & armoured served sheathed,undeground cable
including rubber ring,
6.12 4 X 25 sq. mm (28mm),
6.13 4 X 16 sq. mm (28mm),
6.14 Supply and fixing of 3 Watt to 6 Watt LED Spot/Spike/uplighter light luminaire Confirming to IP 66 Protection complete in all
respect.
6.15 Supply and fixing of LED strip light 15 Watt per meter IP 65 protection warm
white
TOTAL with suitable
AREA OFLED driver complete
AMINITIES in all respect as desired by Engineer incharge.
PROVIDED

TOTAL AREA OF THE PARK