Professional Documents
Culture Documents
Lec-05-06, LE 4123, CIMS
Lec-05-06, LE 4123, CIMS
Lec-05-06, LE 4123, CIMS
LE 4123
❖ Again in architectural :
• Centralized
• Decentralized and
• Hybrid.
❖Speed
❖Flexibility
5/10/2022 Muhammad Naimul Hasan 7
Advantages of CIM
❖Integration
❖An operation on a product (or work part) takes place when it is at the production
machine. The non operation elements are the handling, storage, inspections, and
other sources of delay.
❖The manufacturing lead lime (MLT) is the total time required to process a given
product (or work part) through the plant or industry.
5/10/2022 Muhammad Naimul Hasan 10
CIM & Lead Time
❖Let us use, T0 to denote the time per operation at a given machine or
workstation, there are Nm separate machines or operations through
which the product must be routed in order to be completely processed.
and Tno to represent the non operation time, Q is the units/quantity of
the product in the batch.
❖A setup procedure is generally required to prepare each production
machine for the particular product. The setup typically includes
arranging the workplace and installing the tooling and featuring
required for the product. Let this setup time be denoted as Tm. Tsu is
avg. set up time, then manufacturing lead time (MLT)
Where TP is given by
Design
resources
Core
manufacturing
System (Centre Manufacturing
resources
Consumer data storage)
5/10/2022 Products
Muhammad Naimul Hasan 14
Challenges for CIM implementation
✔Integration of components from different suppliers
✔ Data Integrity
✔ Process Control