This equipment is designed to get a large number of prefabricated panels, using a minimum of factor y space.

11
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S w w w. m o l d t e c h s l . e s

F E AT U R E S

These ver tical batter y moulds for precast concrete panels offer a high production capacity.
The panels are produced ver tically to obtain a smooth sur face on both sides.
These moulds could be also equipped with the most suitable heating system to accelerate the curing process of the concrete.
The ver tical batter y mould is easy to adapt to the different panel geometries, and it also allows incorporating shuttering systems.
It is an efficient and safe production system which reduces workforce.
This ver tical system allows a large production of panels by using a minimum of factor y space.
The quality of the Sur face of the precast concrete panel is determined by the finish of the mould wall itself, avoiding the necessity of
specialized workforce to determine the finish of one of the faces.

2
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S w w w. m o l d t e c h s l . e s

PRODUCTIVE PROCESS

1 Release of the locking system. 6 The concrete is poured from the upper par t of the mould, using
2 Opening of the first lane after releasing the relevant closures. the compaction system (vibration).
3 C l e a n i n g o f t h e m o u l d , p l a c e m e n t o f t h e r e i n fo r c e m e n t , s h u t t e r i n g 7 Opening of the first lane after releasing the relevant closures.
system and application of the release agent. 8 The finished panel is lifted by the lifting devices or the suitable
4 C l o s i n g o f t h e m e n t i o n e d l a n e. c r a n e, a n d i t i s r e m o v e d f r o m t h e m o u l d .
5 Once the mould has already been prepared, the locking system must 9 A f t e r w a r d s , t h i s s a m e p r o c e s s i s r e p e a t e d fo r e a c h o f t h e l a n e s o f
be activated again. the mould.

1 2 3 4 5

6 7 8 9

3
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S w w w. m o l d t e c h s l . e s

Lock system Vibrators working walkway / platform

Height and side adjustment system Remote control panel

4
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S
V E R T I C A L B AT T E R Y M O U L D P O R P R E C A S T PA N E L S w w w. m o l d t e c h s l . e s

5
w w w. m o l d t e c h s l . e s

TH A N K Y O U

SEVILLE, SPAIN, EUROPE.

Download our
catalogue

Visit our website

You might also like