HARC For Lowering Mast With Old Bridle Line Dec 07
HARC For Lowering Mast With Old Bridle Line Dec 07
Task/Process
Revision: 01 Lowering mast with old bridle lines.
Assessed:
Date: 12 Dec 17. Location: Rig-25
Operation: Lowering Mast. Assessment Team: Syed Zafar Ali Shah -Waheed Asghar(QHSE)
HAZARD INITIAL RISK CONTROL MEASURES RESIDUAL RISK
Hazard Description List all Current and Planned Control Measures, taking into Account all
and Worst Case Loss Contributing and Escalating Factors
Likelihood
Likelihood
Risk Level
Risk Level
Consequences with Category/
Severity
Severity
no Prevention or
Activity Mitigation Measures in Population Current and Planned Prevention Current and Planned Mitigation
Steps Place Affected Measures to reduce Likelihood Measures to reduce Severity
Lower mast Bridle line may parted while Personnel - Visually Inspect condition of the bridle line - Safety meeting will be held prior to raise
with old bridle Lowering the mast. Assets prior to use. mast.
lines. Mast fell down Check for any rust between strands.
Check for any broken wire. - Crew members will stay clear from the
Undesirable (-6)
Catastrophic (-4)
Check for any kinking. mast during this period.
Intolerable (-12)
Schlumberger Private
Possible (3)
Unlikely (2)
Check for any wear, distortion & corrosion
Major (-3)
- Dedicate 2 persons to check the bridle
- MPI will be done on sockets prior to use line at each side of the mast during the Rig
bridle lines. down procedure