A Columns
Straight on plan M311 6 T 97,092.00
B Beams
Straight on plan M321 19 T 307,458.00
Plate Flooring
E Allowance for Base plate, Anchor bolts and other 1 Item Included
necessary accessories
STRUCTURAL WORKS
To Summary QAR 593,318.00
STRUCTURAL WORKS
ST/JR1 JR1/ST Page 1 of 2
J22212-0100D-DAR-PMC-BOQ-00003 K01
Annexure-A JORDAN PAVILION IN DOHA EXPO 2023
B Green wall system as per the drawings X157.3 365 m2 Not Incuded
LANDSCAPE WORKS
To Summary QAR 1,591,682.00