METHOD STATEMENT
OF ONLINE PD MEASUREMENT OF
TRANSFORMER
Table of Contents
1.0 Purpose
2.0 Scope
This procedure shall apply during the online PD measurement of transformers at the site.
3.0 Definition
5.0 Responsibilities
The Diagnostic Engineer shall be responsible for preparing the testing plan, for the
observance of all safety precautions required by the Safety Plan, for supervising the
testing activities.
He shall prepare the testing plan that will include the equipment to be tested, the tests to
be performed, the test equipment to be used, the test procedure to be applied and the
test records to be used. Based on the testing plan, in coordination with the Electrical
Engineer a testing schedule will be developed.
The Diagnostic Engineer shall organize, supervise and verify the implementation of the
testing schedule.
Any defects or variances from the approved specification and standards will be noted
during the testing and be informed to the construction department by the Inspection
Report.
Diagnostic Engineer (DE) shall be responsible for carrying out the tests and record the
test results.
The Diagnostic Engineer shall carry out an inspection of the test equipment when the
test equipment arrives in the warehouse. Each piece of the test equipment shall have the
calibration labels intact. He shall ensure that test equipment manual is available and that
the test equipment is calibrated and calibration certificates are available. He will maintain
a record with the test equipment serial numbers, date of calibration and copies of
calibration certificates.
The Diagnostic Engineer shall ensure that test equipment that it is out of calibration is
isolated in a quarantine zone and will be sent as soon as possible to a certified
metrology laboratory for re-calibration against national standards.
The Diagnostic Engineer shall ensure that the test equipment is tested for proper
operation before starting any test. Any defective test equipment will be isolated in a
quarantine zone and sent as possible for repairs.
The following test equipment will used to perform the above tests:
1. AE 150- Portable Partial Discharge /Detection and localization system for Power
Transformer.
2. Techimp PD Check: Online PD measurement kit.
1. Visual check.
2. Online PD Measurement through UHF and HFCT method.
3. Acoustic method.
The following shall be guideline for testing personnel during the Online PD Measurement
of Transformer.
Fig 8.2-1
When there is a PD activity going on inside the cable box the P.D will travel
through the insulated medium and it will touch the metallic part of the panel
which will be picked up by the sensor. Use headphones with ULD 40 to listen to
the amplified audible sound (If any) generated by surface discharge/PD.
First we insert UHF antenna through the filter valve of transformer and connect
it to Acoustic sensor for synchronization.
Acoustic sensors are connected to the laptop through Bluetooth Interface. And
using software we trigger on the different channels and receives signal.
Analyzing theses signals we confirm the PD activity and then we use different
trigger method on acoustic channels to localize the PD activity inside the
transformer tank
9.0 Documentation