Professional Documents
Culture Documents
K05-S01 Rev 2 Mar 2019 Process CCTV System Specification
K05-S01 Rev 2 Mar 2019 Process CCTV System Specification
NUMBER K05-S01
REV.NO. 2
ENGINEERING STANDARD DATE MAR 2019
PAGE 1 of 5
This document is issued by ECoE, SABIC E&PM, Jubail Industrial City, Kingdom of Saudi Arabia. The information contained in this
document is the confidential property of SABIC. It cannot be disclosed, copied or used for any purpose without approval from SABIC.
If you are not authorized to possess this document, please destroy it immediately.
Classification: Internal Use
NUMBER K05-S01
Process Closed Circuit Television REV.NO. 2
System Specification DATE MAR 2019
ENGINEERING STANDARD PAGE 2 of 5
Contents
1. SCOPE ..........................................................................................................................................3
2. REFERENCES ..............................................................................................................................3
3. DEFINITIONS ................................................................................................................................3
4. PROCESS CCTV ..........................................................................................................................3
4.1. General Requirements ..........................................................................................................3
4.2. Video Camera ........................................................................................................................3
4.3. Monitors .................................................................................................................................4
4.4. Process CCTV Controller ......................................................................................................4
4.5. Video Recorder ......................................................................................................................4
4.6. Cooling System .....................................................................................................................4
5. FACTORY ACCEPTANCE TEST (FAT) .......................................................................................5
5.1. General Requirements ..........................................................................................................5
5.2. FAT Procedure ......................................................................................................................5
6. SITE ACCEPTANCE TEST (SAT) ................................................................................................5
6.1 General Requirements ..........................................................................................................5
7. REVISION HISTORY ....................................................................................................................5
Classification: Internal Use
NUMBER K05-S01
Process Closed Circuit Television REV.NO. 2
System Specification DATE MAR 2019
ENGINEERING STANDARD PAGE 3 of 5
1. Scope
This standard describes the minimum requirements of a Process Closed Circuit Television (CCTV)
System.
2. References
References are made in this standard to the following documents. The latest issues, amendments
and supplements to these documents shall apply unless otherwise specified.
SABIC Engineering Standards (SES)
S04-E01 Flare and Blow Down Systems
X01-E02 Cyber Security
X05-E01 Process Control Cabling and Wiring
X05-S01 Process Control Cable Specification
3. Definitions
Abbreviations and Acronyms
BEDD Basic Engineering Design Data
CCTV Closed Circuit Television
NVR Network Video Recorder
DVR Digital Video Recording
PTZ Pan, Tilt and Zoom
4. Process CCTV
4.1. General Requirements
4.1.1. The areas to be monitored by process CCTV system shall be in accordance with
project specifications. As a minimum Process CCTV cameras shall be located for
digital recording of flares in accordance with SES S04-E01.
4.1.2. Process CCTV system consists of controllers, cameras, monitors, digital video
recording, etc. Process CCTV system shall be capable to be remotely monitored and
controlled.
4.1.3. Process CCTV system shall be capable of combining and monitoring all process
CCTV cameras and display them at the same time. Operator shall be capable to
control or have a full screen viewing of any one of the cameras.
4.1.4. Process CCTV system field mounted equipment shall be appropriate to ambient
conditions established in project BEDD. When the devices are located in hazardous
areas, they shall be suitable for use in those areas.
4.1.5. Process CCTV system devices exposed to direct sunlight shall be equipped with
sunshades.
4.1.6. System manufacturer shall define cables between the different components of the
process CCTV system. The cabling and wiring methods shall be in accordance with
SES X05-E01 requirements. Minimum four cores fiber optic cables shall be used to
connect process CCTV cameras, and shall be in accordance with the requirements of
SES X05-S01.
4.1.7. SES X01-E02 shall be referred for cyber security requirements
Classification: Internal Use
NUMBER K05-S01
Process Closed Circuit Television REV.NO. 2
System Specification DATE MAR 2019
ENGINEERING STANDARD PAGE 4 of 5
NUMBER K05-S01
Process Closed Circuit Television REV.NO. 2
System Specification DATE MAR 2019
ENGINEERING STANDARD PAGE 5 of 5
7. Revision History
Revision No.0 June 2012 New standard due to revision of categories to achieve
better harmonization
Revision No. 1 March 2014 General Review
Revision No. 2 March 2019 Updated 2, 4.1, 4.1.6, 5, Added 4.1.7, 6