You are on page 1of 1

Independent Progress Monitoring Report

Inspection Date: 09/01/2018 Project Number: 1563 Project Name: DUBAI LAGOON ROWAN

Developer Number: 1158 Developer Name: XANADU REAL ESTATE DEVELOPMENT L.L.C

Plot no: 542 Location: Dubai Investment Park First Trust A/C bank: ABU DHABI COMMERCIAL BANK

PROJECT DESCRIPTION INSEPCTION NOTES


The project consist of 5 buildings, (4 buildings x 2B+G+8+R & 1 building At the time of inspection the following were found :
x 1B+G+3) made of concrete structure in Dubai lagoon DIP area with Project is not progressing.
internal and external finishes. Enabling works completed. Foundation works completed for four
buildings.
One basement completed and columns for other basement done.
Project is on hold for long time. Developer is in process to get new
building permit and mobilize the site.
Developer, consultant and main contractor all are changed for the
project

INSPECTION PHOTOS

RERA PROGRESS INDICATOR:

Refer to guide for more information


about the RERA Progress Indicator. Independently inspected and progress audited for RERA

Progress Status Main Contract - On


Hold