Independent Progress Monitoring Report

Inspection Date: 16/03/2020 Project Number: 2097 Project Name: Madinat Jumeirah Living

Developer Number: 1076 Developer Name: JUMEIRAH HILLS DEVELOPMENT L.L.C

Plot no: 641 Location: Um Suqaim Third Trust A/C bank: ABU DHABI COMMERCIAL BANK

PROJECT DESCRIPTION INSEPCTION NOTES


The project consists of 2 residential buildings with total of 161 units as At the time of inspection found mobilization, enabling, foundation
follows: works substantially completed. Structural works progressing at
Building 1 :G+7 (62 Units) different stages. Internal works progressing with block and plaster
Building 2 :G+9 (99 Units) works. MEP works progressing with basic, 1st and 2nd fix works.
Building envelope works progressing at different stages.

INSPECTION PHOTOS

RERA PROGRESS INDICATOR:

Refer to guide for more information


about the RERA Progress Indicator. Independently inspected and progress audited for RERA

Progress Status Main Contract -


Progressing