PANEL BOARD SCHEDULE

REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 20-MAY-14
PANEL NO. : DB-EB1(N) LOCATION : CORRIDOR
CAPACITY : 100A 18 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 1,152
1 LIGHTING 1 16 2-2.5/2.5G 864
LIGHTING 1 16 2-2.5/2.5G 432
SPARE 1 16
2 SPARE 1 16
SPARE 1 16
SPARE 1 16
3 SPARE 1 16
SPARE 1 16
SPARE 1 16
4 SPARE 1 16
SPARE 1 16
SPARE 1 16
5 SPARE 1 16
SPARE 1 16
SPARE 1 16
6 SPARE 1 16
SPARE 1 16

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 1,152 864 432


MAIN INCOMER CABLE: 4C-50/25G 3P, 100A TOTAL LOAD 2,448
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 41%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 2,203

7/16/2015 1 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 20-MAY-14
PANEL NO. : DB-EG1(N) LOCATION : AMCC ROOM
CAPACITY : 100A 30 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 1,200
1 LIGHTING 1 16 2-2.5/2.5G 1,600
LIGHTING 1 16 2-2.5/2.5G 1,600
LIGHTING 1 16 2-2.5/2.5G 1,600
2 LIGHTING 1 16 2-2.5/2.5G 1,600
LIGHTING 1 16 2-2.5/2.5G 1,600
LIGHTING 1 16 2-2.5/2.5G 1,600
3 LIGHTING 1 16 2-2.5/2.5G 1,600
LIGHTING 1 16 2-2.5/2.5G 1,600
LIGHTING 1 16 2-2.5/2.5G 800
4 LIGHTING 1 16 2-2.5/2.5G 900
LIGHTING 1 16 2-2.5/2.5G 900
LIGHTING 1 16 2-2.5/2.5G 864
5 LIGHTING 1 16 2-2.5/2.5G 648
LIGHTING 1 16 2-2.5/2.5G 288
LIGHTING 1 16 2-2.5/2.5G 576
6 LIGHTING 1 16 2-2.5/2.5G 864
LIGHTING 1 16 2-2.5/2.5G 720
LIGHTING 1 16 2-2.5/2.5G 684

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
7 LIGHTING 1 16 2-2.5/2.5G 648
LIGHTING 1 16 2-2.5/2.5G 576
LIGHTING 1 16 2-2.5/2.5G 648
8 LIGHTING 1 16 2-2.5/2.5G 720
LIGHTING 1 16 2-2.5/2.5G 828
SPARE 1 16
415/240V.
9 SPARE 1 16
SPARE 1 16
SPARE 1 16

BS 6387
10 SPARE 1 16
50HZ

SPARE 1 16

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 7,972 8,580 8,112


MAIN INCOMER CABLE: 4C-50/25G 3P, 100A TOTAL LOAD 24,664
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 4%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 22,198

7/16/2015 2 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 07-JAN-15
PANEL NO. : DB-EG2(N) LOCATION : AMCC ROOM
CAPACITY : 100A 24 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (VA)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
ISOLATOR FOR FILTRATION 1 20 2-4/4G 1,176
1 ISOLATOR FOR FILTRATION 1 20 2-4/4G 1,176
SPARE 1 16 - -
SPARE 1 16 - -
2 SPARE 1 16 - -
SPARE 1 16 - -
SPARE 1 16 - -
3 SPARE 1 16 - -
SPARE 1 16 - -
SPARE 1 20 - -
4 SPARE 1 20 - -
SPARE 1 20 - -
SPARE 1 20 - -
5 SPARE 1 20 - -
SPARE 1 20 - -
SPARE 1 20 - -
6 SPARE 1 20 - -
SPARE 1 20 - -
SPARE 1 20 - -

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
7 SPARE 1 20 - -
SPARE 1 20 - -
SPARE 1 20 - -
8 SPARE 1 20 - -
SPARE 1 20 - -
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 1,176 1,176 0


MAIN INCOMER CABLE: 4C-50/25G 3P, 100A TOTAL LOAD 2,352
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 50%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 2,117

7/16/2015 3 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 08-FEB-15
PANEL NO. : DB-EG3(N) LOCATION : CALL CENTER
CAPACITY : 100A 18 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 1,152
1 LIGHTING 1 16 2-2.5/2.5G 648
LIGHTING 1 16 2-2.5/2.5G 733

ISOLATOR FOR
2 3 20 3C-6/6G 1,255 1,255 1,255
AIRCONDITION SYSTEM

SPUR FOR FIRE SUPPRESSION PANEL 1 20 2-4/4G 800


3 DP SWITCH 1 20 2-4/4G 2,176
SPARE 1 16 - -
SPARE 1 16 - -
4 SPUR FOR FIRE SUPPRESSION PANEL 1 20 2-4/4G 600
SPARE 1 16 - -
SPARE 1 16 - -
5 SPUR FOR FIRE SUPPRESSION PANEL 1 20 2-4/4G 600
SPARE 1 16 - -
SPARE 1 16 - -
6 SPUR FOR FIRE SUPPRESSION PANEL 1 20 2-4/4G 200
SPARE 1 16 - -

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 3,207 5,479 1,988


MAIN INCOMER CABLE: 4C-50/25G 3P, 100A TOTAL LOAD 10,674
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 54%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 9,607

7/16/2015 4 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 20-MAY-14
PANEL NO. : DB-EM1(N) LOCATION : CEP CON'T RM
CAPACITY : 100A 18 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 1,224
1 LIGHTING 1 16 2-2.5/2.5G 1,136
SPARE 1 16
SPARE 1 16
2 SPARE 1 16
SPARE 1 16
SPARE 1 16
3 SPARE 1 16
SPARE 1 16
SPARE 1 16
4 SPARE 1 16
SPARE 1 16
SPARE 1 16
5 SPARE 1 16
SPARE 1 16
SPARE 1 16
6 SPARE 1 16
SPARE 1 16

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 1,224 1,136 0


MAIN INCOMER CABLE: 4C-50/25G 3P, 100A TOTAL LOAD 2,360
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 56%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 2,124

7/16/2015 5 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 17-MAR-15
PANEL NO. : DB-EM2(N) LOCATION : HOSPITAL CON'T ROOM
CAPACITY : 100A 18 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 510
1 LIGHTING 1 16 2-2.5/2.5G 850
LIGHTING 1 16 2-2.5/2.5G 765
MIMIC PANEL 1 20 3C-4 FP200 GOLD 400
2 MIMIC PANEL 1 20 3C-4 FP200 GOLD 400
MIMIC PANEL 1 20 3C-4 FP200 GOLD 400
MIMIC PANEL 1 20 3C-4 FP200 GOLD 400
3 SPUR FOR MFACP 1 20 3C-4 FP200 GOLD 400
SPARE 1 16 - -
SPUR FOR FA RACK 1 20 3C-4 FP200 GOLD 400
4 SPARE 1 16 - -
SPUR FOR FA RACK 1 20 3C-4 FP200 GOLD 400
SPUR FOR FM 200 CONTROL PANEL 1 20 2-4/4G 200
5 SPARE 1 16 - -
SPARE 1 16 - -
SPARE 1 16 - -
6 SPARE 1 16 - -
SPARE 1 16 - -

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 1,910 1,650 1,565


MAIN INCOMER CABLE: 4C-50/25G 3P, 100A TOTAL LOAD 5,125
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 12%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 4,613

7/16/2015 6 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 20-MAY-14
PANEL NO. : PB-GH3 LOCATION : GUARD HOUSE-3
CAPACITY : 100A 12 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 224
1 S/S OUTLET 1 16 2(2-4/2.5G) 600
AC UNIT 1 32* 2-4/4G 1,000
WATER HEATER 1 32* 2-4/4G 1,500
2 BARRIER-1 1 32* 2-4/4G 1,000
BARRIER-2 1 32* 2-4/4G 1,000
BARRIER-3 1 32* 2-4/4G 1,000
3 BARRIER-4 1 32* 2-4/4G 1,000
BARRIER-5 1 32* 2-4/4G 1,000
SPARE 1 32*
4 SPARE 1 32*
SPARE 1 16

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 2,724 2,600 3,000


MAIN INCOMER CABLE: 4C-16/16G 3P, 100A TOTAL LOAD 8,324
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 8%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 7,492

7/16/2015 7 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 20-MAY-14
PANEL NO. : PB MG1 LOCATION : VIE CONTROL ROOM
CAPACITY : 100A 12 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 216
1 SPARE 1 16
S/S OUTLET 1 32* 2-4/2.5G 100
LIGHTING 1 16 2-2.5/2.5G 1,250
2 AC UNIT 1 32* 2-4/4G 1,500
AC UNIT 1 32* 1,500
SPARE 1 32*
3 SPARE 1 32*
SPARE 1 32*
SPARE 1 32*
4 SPARE 1 32*
SPARE 1 32*

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 1,466 1,500 1,600


MAIN INCOMER CABLE: 4C-50/25G 3P, 100A TOTAL LOAD 4,566
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 5%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 4,109

7/16/2015 8 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 20-MAY-14
PANEL NO. : PB GH2 LOCATION : GUARD HOUSE-2
CAPACITY : 100A 12 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type Phase "R" Phase "Y" Phase "B"
LIGHTING 1 16 2-2.5/2.5G 224
1 S/S OUTLET 1 16 2(2-2.5/2.5G) 600
AC UNIT 1 32* 2-4/4G 1,000
WATER HEATER 1 32* 2-4/4G 1,500
2 BARRIER 1 32* 2-4/4G 1,000
SPARE 1 32*
SPARE 1 32*
3 SPARE 1 32*
SPARE 1 32*
SPARE 1 32*
4 SPARE 1 32*
SPARE 1 16

SINGLE CORE FR 450/750V.


IC >= 10kA AT.
415/240V.

BS 6387
50HZ

CONNECTED TO : SMB-E(N) MAIN : ISOLATOR LOAD 1,724 1,600 1,000


MAIN INCOMER CABLE: 4C-16/16G 3P, 100A TOTAL LOAD 4,324
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 20%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 3,892

7/16/2015 9 OF 10 EPS
PANEL BOARD SCHEDULE
REV.: 3
Project: HAMAD BIN KHALIFA MEDICAL CITY CP300B (CENTRAL ENERGY PLANT BUILDING) Date: 29-DEC-14
PANEL NO. : DB-HV(N) LOCATION : HV ROOM
CAPACITY : 1P, 100A 10 CIRCUITS AS 1-POLE MOUNTING : SURFACE
415/240V PANEL BOARD
MCB Conductors Connected Load (W)
CKT NO. Description Remote Switch No.
No. Pole AT IC Size Type
1 LIGHTING 1 16 3-2.5 1,341
2 LIGHTING 1 16 3-2.5 108
3 LIGHTING 1 16 3-2.5 144
4 S/S OUTLET 1 32* 3-4 500
5 S/S OUTLET 1 32* 3-4 100
6 SPARE 1 16 - -
7 SPARE 1 16 - -
8 SPARE 1 16 - -
9 A/C SUPPLY FOR 30V DC CHARGER ` 1 32* 2(2-4/4G) 1,000
10 A/C SUPPLY FOR 30V DC CHARGER 1 32* 3-4 1,000
11 A/C SUPPLY FOR 30V DC CHARGER 1 32* 3-4 1,000
12 SPARE 1 32* - -

IC >= 10kA AT.

MICC
415/240V.
50HZ

CONNECTED TO : MV-7 MAIN : ISOLATOR LOAD 5,193 0 0


MAIN INCOMER CABLE: 2C-50/25G 1P, 100A TOTAL LOAD 5,193
* ELCB CIRCUIT BREAKER 30mA % IMBALANCE 200%
POWER FACTOR : FLUORESCENT(85%), METAL HALIDE(90%) DEMAND FACTOR 90%
BALLAST(W) : LAMP(w) x 1.1 (10%) DEMAND LOAD 4,674