ITEM INSPECTED THIS VISIT


Specification/
No. Description Identification Number Qty. Unit
Dimension
Witnessed DFT Intermedite 44MBD-101
1 Coat and DFT Finish Coat Coating system 3 44MBM-002 3 Pcs
60-HAP-005
Note: If there are many items inspected, the list of items inspected can be made as attachment (the column of description filled by: see
attachment)

RESULTS OF Accepted Non-compliance ORDER


Complete Incomplete
INSPECTION: Conditionally Accepted with Comment STATUS:
1. INSPECTION ACTIVITIES
 Visual inspection, DFT Intermediate Coat and DFT Finish Coat

2. AREA OF CONCERN & ACTIONS REQUIRED


 Low DFT spot to be build up.
 Orange Peel, sagging on spot area to be rectified.

REFERENCED DOCUMENTS
No. Document Description Doc No. Rev No. Remarks
Coating Specification for Offshore &
1 ID-G-BU-DD3-STS-GN-98-0002 3 Re-issued for use
Onshore Facilities
Inspector: Fathul Mu’in Reviewed by: AMAR MA’RUF
Date: May 12, 2023 Date: …………..., 2023

Signed: Signed:

Page 1 of 6
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

Pictorial Description of Activities


1. Witnessed DFT Finish Coat and cleanliness

Page 2 of 6
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

View of DFT Intermediate Coat as per specification, accepted

Page 3 of 6
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

AREA OF CONCERN & ACTIONS REQUIRED

Page 4 of 6
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

Page 5 of 6
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

Poor Visual painting (Orange Peel, Sagging, Over Dust Spray) and Low DFT