FOREL FPSO Time Charter

PROJECT

DAILY REPORT

Client: PT. HANOCHEM TIAKA SAMUDERA Vendor: PT ENVICON EKATAMA

Project No: - Sub-Vendor:

Project: FOREL FPSO Time Charter PROJECT Location: Karawang

Date of Visit: May 16, 2023 Report No.: TMI/HTS/CS/003

ITEM INSPECTED THIS VISIT


Specification/
No. Description Identification Number Qty. Unit
Dimension
44MBD-101
Witnessed DFT Finish Coat
1 Coating system 3 44MBM-002 3 Pcs
60-HAP-005
Note: If there are many items inspected, the list of items inspected can be made as attachment (the column of description filled by: see
attachment)

RESULTS OF Accepted Non-compliance ORDER


Complete Incomplete
INSPECTION: Conditionally Accepted with Comment STATUS:
1. INSPECTION ACTIVITIES
 Final Inspection

2. AREA OF CONCERN & ACTIONS REQUIRED


 Sagginng and mis Coat

REFERENCED DOCUMENTS
No. Document Description Doc No. Rev No. Remarks
Coating Specification for Offshore &
1 ID-G-BU-DD3-STS-GN-98-0002 3 Re-issued for use
Onshore Facilities
Inspector: Fathul Mu’in Reviewed by: AMAR MA’RUF
Date: May 16, 2023 Date: …… ……, 2023

Signed: Signed:

Pictorial Description of Activities


Page 1 of 4
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

1. Witnessed DFT Finish Coat and cleanliness

Page 2 of 4
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

Page 3 of 4
FOREL FPSO Time Charter
PROJECT

DAILY REPORT

AREA OF CONCERN & ACTIONS REQUIRED

Sagging and mis coat


END OF REPORT