The Acceptance Test has been conducted on all the Infrastructure and Engineering work for (site name) NORTHMANILA (FRM-GMMSW-NORTHMANILA-
202402)of PO No. PLDT-NCLSP-GMS-OPERATION-202402-005
CTRL FiberHome
QUANTITY OPU Per
NO. Description
FRM-NORTH MANILA
1 1 AU 1
Maintenance
We hereby, certify that all installation of infrastructure/equipment is in accordance with the Technical Specification of FIBRERHOME.