MATERIAL INSPECTION REPORT No.

MIR-4400017135-001
[ ] Civil [ ] Electromechanical [ ] Electrical [ ✔ ] Other: Security Systems

RFI REFERENCE No. : MIR-44000171135-001

DELIVERY DATE : 28-Dec-2023 INSPECTION DATE : 5-Mar-2024


CONTRACTOR : Advanced Communications and Electronics Systems (ACES)
CONTRACT No. : 4400017135 JOB ORDER No. : 1-2139015.04
PROJECT NAME : Installation of Security Systems for Transmission Substations EOA Phase 4

CONT. SUPPLER/ RECEIVED % ITEM CASE/


ITEM DESCRIPTION LOCATION
ITEM # MANUFACTURER QTY. WEIGHT CREATE

2.1.3.1 Indoor Fixed Dome Camera with Gulf Applicatinos 420


accessories /Hanwha
2.1.1.1 Fixed colored camera with Gulf Applicatinos 718
accessories /Hanwha
2.1.1.2 Colored PTZ Camera with Gulf Applicatinos 145
accessories /Hanwha

Note: Item number and description provided above as per Schedule-C.

Enclosed Documents: ✔ Delivery Note, Packing List, Company Approval, Release of Shipment,

Manufacturer Storage Recommendation, Other:

Inspection Result: [ ] Accepted [ ] Not Accepted

Comments if any:

INSPECTED BY: SEC/PDC Representative RECEIVED BY: Contractor’s Project Manager


NAME: NAME: Eng. Abdulrahim Alghazali

SIGNATURE: DATE: SIGNATURE: DATE:

CONCURRED BY: SEC/PDC Project Manager / Engineer


NAME:

SIGNATURE: DATE: