No Requirement Of Reason Action Required Risks Impact

. Variation Order On
(Vo) Project
Timeline
/ Period
of Vo
1. Modify the Different  Prepare the Increase 7 days
originally specified colour or finish external walls cost which delay
standard external for the external by cleaning, includes the
wall painting from walls to sanding, and cost of the
white and pastel achieve a more making any new paint or
colour to the new the appealing and necessary material,
modern look. repairs or
white and green additional
Offers better surface
colour as per client’s labour, and
protection treatments.
requirement. against  Apply the new any related
weathering, paint or finish expenses
UV rays, or in accordance for the
other with the modified
environmental revised external
factors, specifications, wall
ensuring the painting.
ensuring
longevity of
proper
the paintwork.
Less frequent coverage and
maintenance, uniformity.
reducing the  Conduct
long-term quality checks
upkeep costs and touch-up
for the as needed to
homeowner. ensure a
satisfactory
result.
2. Replace and change Update the  Review the All 14 days
the standard flat quantity of existing expenses delay
plastered ceilings coffered ceiling finish associated
with coffered ceiling plans and with the
ceilings in the living sections specifications design
room and dining required based and perform modificatio
necessary
area. on the change ns,
assessments to
in design. materials,
determine the
modifications labour, and
The
required for any other
modifications
aim to the coffered costs
introduce ceilings. specific to
architectural  Procure any the coffered
interest and additional ceiling
visual depth to materials, such installation.
the ceilings, as decorative
enhancing the moldings,
overall beams, or
ambiance and trims,
character of necessary for
the rooms. the coffered
ceiling
installation.
 Conduct
necessary
inspections
and testing to
ensure
compliance
with
applicable
regulations
and standards.