You are on page 1of 1

T E C H T O D AY

Quality-assurance guidelines
Quality-assurance observers have specific project roles and responsibilities
by Mark S. Graham

Proper quality assurance during roof sys- of the job site and roof areas under con- and submit a certificate of insurance showing
tem installation can be an important element struction and materials used and stored coverage for workers’ compensation, compre-
for long-term performance. • Note pre-existing property damage or hensive general liability, automobile insurance
Quality assurance—unlike quality control, damage that can occur and the substrate and, if applicable, professional liability insur-
which is performed by roofing contractors— condition and repair or replacement ance. Insurance limits shall be the statutory
is the responsibility of a building owner or procedures amounts or higher amounts if required in the
his or her designated representative, such as a • Observe and record the installation contract.
licensed design professional, roof consultant of roofing materials and any other
components specified in the contract
NRCA guidelines
or general contractor. The purpose of quality
assurance is to verify the scope and intent of documents, and flashing installation ASTM D7186 references the following
a project’s contract documents are being met and detailing NRCA documents that provide industry-
• Record weather conditions, roofing accepted guidelines for evaluating roof sys-
and roof system materials are being installed
crew size, foreman’s name and all job- tem application:
in accordance with contract documents,
site visitors • Quality Control Guidelines for the Appli-
manufacturers’ installation
The most effective instructions and accepted A QAO should prepare a daily written re- cation of Built-up Roofing
• Quality Control Guidelines for the Appli-
industry practices. port with photographs; this report should be
means of NRCA asserts the most made available to all parties involved in the
cation of Polymer-modified Bitumen
Roofing
effective means of provid- roofing project. A copy of the report should
providing quality ing quality assurance is by be provided to the roofing contractor no later
• Quality Control Guidelines for the
Application of Thermoset Single-ply Roof
visually observing materi- than the commencement of work the follow-
Membranes
assurance is als and procedures used ing day. ASTM D7186 includes sample pre-
• Quality Control Guidelines for the Appli-
at the time of roof system construction damage, material delivery, daily
cation of Spray Polyurethane Foam-based
visually observing installation. The person construction and progress summary, and unit
Roofing
performing visual obser- cost tracking report forms for use by QAOs
• Quality Control Guidelines for the Appli-
materials and vation often is referred when completing the documentation neces- cation of Asphalt Shingle Roof Systems
to as a quality-assurance sary to provide proper quality assurance. NRCA recommends these documents be
procedures observer (QAO). A QAO also should keep on-site copies of used with ASTM D7186 to provide effective
contract documents, including project speci- quality assurance.
ASTM D7186 fications, the roof plan, construction detail When a QAO will be present on a job site,
ASTM D7186, “Standard Practice for Qual- drawings and any addenda, as well as stamped NRCA recommends his or her role be clearly
ity Assurance Observation of Roof Construc- material submittals and minutes from the defined and understood by all parties, includ-
tion and Repair,” establishes the role and pre-bid, pre-construction and project meet- ing the building owner, licensed design profes-
responsibilities of those performing quality- ing minutes. sional, general contractor or construction man-
assurance observation, as well as procedures A QAO is responsible for providing and ager, and roof consultant. NRCA encourages
for observation and reporting. maintaining the tools and equipment required referencing ASTM D7186 for this purpose.
A QAO’s function is to provide on-site to perform his or her work, including any nec- All NRCA documents referenced can be
observation and reporting of a roof system’s essary safety equipment, such as personal pro- purchased by accessing the NRCA Bookstore
construction process in a clear, accurate and tective equipment and fall protection. A QAO at shop.nrca.net. 123
objective manner; a QAO should not direct should follow all applicable safe work practices.
or order any work. A QAO should: A QAO or the firm providing the quality- MARK S. GRAHAM is NRCA’s associate execu-
• Observe and record the general condition assurance observations must provide insurance tive director of technical services.

12 www.professionalroofing.net  FEBRUARY 2014