Professional Documents
Culture Documents
Prestart Checklist
Statement of Operator Competence - Required
Supplier Verification & Plant Details Verify CAB Verify Check WARNING DEVICES
Check Cleanliness Horn
Plant Owner: Seat Condition OK Reversing Alarm
Operator Restraint Provided
Address: WARNING SIGNS (In Cabin)
Instruments Operational & Labelled Verify Check
This is to certify that the plant being supplied conforms to the relevant HS&E Legislation, and the requirements as detailed above. HSE Department will check this Pre-start Checklist to ensure the supplier has verified compliance to Legislative requirements and, to
register the plant onto the site. The operator will be required to participate in ongoing training and perform work in accordance with the relevant Work Method Statement. Should the plant be found to not conform to the above, then it will be prevented from
commencing work on the site until the non-compliance is rectified. HSE Management will not reimburse the Owner / Supplier / Contractor for any down / lost time so caused from the non-conformance.
This form does not remove any liability for the plant supplier to conform with the relevant HSE Legislation