You are on page 1of 1

REFERENCE 21-023/MSG-367 - Page 69

HYDRAULIC POWER

Item Summary Title LRU PN Vendor Aircraft ATA From

81 Modification During 764711 Family Hamilton A320 29-21-03 LTH


Overhaul Sundstrand

A320 RAT Actuator has a 20 Year Overhaul limitation, ALS Part 4. The CMM describes the Overhaul and defines
"Modify the Ram Air Turbine Actuator to the latest configuration by incorporating all outstanding service bulletins."

Especially VSB ERPS08A-29-4, which is considered as optional acc. VSB (Compliance: (1) Incorporation of this
service bulletin is optional based on operator’s experience.), makes the overhaul definition seem questionable and
from a technical point of view we do not see the need to perform optional VSBs during an Overhaul.

MROs and operators confirmed LHT`s point of view.

The definition of the overhaul should be changed to "incorporate all outstanding mandatory Service Bulletins".

Operator comments please

Hamilton: What is the technical reason to include optional SBCs in the overhaul requirements? Will there be a
revision of the CMM reflecting the above-mentioned proposal?

Item Summary Title LRU PN Vendor Aircraft ATA From If MRO, the
Associate
Airline

82 Valve Isolation NLG 975326-7 Parker B787 29 AFR-KLM AFR

The sub assembly part transducer P/N 970294-7 does not have a separate test of its own and requires the next
higher assembly (NHA), P/N 975326-7, to ensure good operation.

Please note to test the NHA it is necessary to systematically test the sub assembly part regarding its own CMM.

Could the CMM be updated to consider this and test operation of the sub assembly part during the test of the NHA?

Parker and operators comment please.

You might also like