Professional Documents
Culture Documents
1 . General information-specification
Install Disassemble
▲Up Inverter side Inverter side
Inverter side Inverter side
1 2 34 5 6 7 8 9 10
Inverter
860mm 3.1 Grounding 3.2 AC output connection
PV Array ≥1000mm
350mm 350mm
AC terminals block
340mm
600mm
≥1000mm m m ≥1000mm
AC Electrical ≥3 0 0
DC
Break Break Grid
700mm
AC
Break
≥1000mm
Load
3.3 DC connection
3.3.1 PV input terminal installation
1 2 3
Positive metal terminal
8-10 mm Positive metal terminal
60mm(2.36")
10mm
(0. 39")
Note:
When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger.
3.3.2Plug in PV terminal
4 . Post-installation check
1 2 Note:
1.Before installing the PV terminal, please No. Acceptance criteria No. Acceptance criteria
PV+
confirm that the PV input voltage and 1 The inverter is installed correctly, firmly and reliably. 6 The RS485 communication cable is installed correctly and firmly.
current do not exceed the limits of the The ground wire connected well and the connection is The cable tie port is trimmed well without leaving sharp
machine specification. 2 7
firm and reliable. corners,meets the requirements of the user.
2.When installing the PV terminal, pay All exposed terminals are well protected and there are no vacant
Click attention to the distinction between the 3 All switches are in the OFF state. 8
ports.
positive and negative poles and the one-to-
one correspondence between the terminals 4 All wiring is correct and securely connected. 9 Pay attention to clean up all construction residues.
and the machine. The wiring of the cable is reasonable, meets the
PV- 3.There is a "click" sound when the terminal 5 requirements, and there is no phenomenon of broken
is engaged, please pull the PV wire gently skin.
Click after the terminal is connected, and observe
that the terminal cannot shake or fall off.
5. Power on and off steps
3.3.3 Communication cable installation
Note:
3.3.3.1 RS485 installation 3.3.3.2 USB installation
Before powering on, please make sure that all voltage ranges are within the working range of the machine, otherwise the machine may be
1.USB-A interface can be used to connect USB-WIFI/GPRS/4G modules damaged.
or U disks. Follow the steps below to switch on and off:
2.USB_B interface can communicate with PC through USB square port 1.Close the switch between the PV and the inverter.
data line. 2.Close the switch between the power grid and the inverter.
3.If you need to set the inverter, please refer to the inverter user manual for details.
4.The shutdown steps are opposite to the above order.
····
····
TR+
TR-
GND
4 4 4
3 3 3
2 2 2 RS 485 twisted-pair
1 1 1