You are on page 1of 1

$TIME$

$DATE$
$USER$
PRINTED BY:

DRAWN TT CLIENT TITLE


DESIGNED JL CONTRACT C7712-21E
CHECKED EC
ORIGINATOR
REPLACEMENT OF CHILLERS IN MHQ
$PLTDRVL$

APPROVED FC
ARUP
$MODEL$
$FILE$

DATE 12/APR/2022 MHQ - ACS SYMBOLS & LEGENDS & ABBREVIATIONS


DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE CONTRACTOR
VERIFIED ON SITE. The Jardine Engineering
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE Corporation. Limited
MODELNAME:

A FIRST SUBMISSION TT 19APR22 EC MTR CORPORATION LIMITED OF HONG KONG. NO SCALE DRAWING NO. REV.
PLOT DRV:

FILENAME:

CADD REF. NTS @ A1


REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR C7712-21E_W_MHQ_JEC_M01_001A.DWG C771221E/W/MHQ/JEC/M01/001 A
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.

You might also like