ELECTRICAL

1) Electrical Yard & Substation:

a) It shall be 01 no. 11 / 0.433 KV, 2500 KVA outdoor type oil transformer with automatic
OLTC.
b) It shall be 01 no. 11KV HT Panel with one VCB breaker for incoming power and one
VCB breaker for outgoing feeders.
c) RMU will not be in our scope. Our scope will only be tapping power from RMU and
feeding it to HT panel.
d) The electrical load data is considered as follows:

Machin
Ligtin Fire PHE Miscellaneous
e
g Load Pump Pump HVAC electrical
Demand
(in House House
(in KW) demand load
Load (in
KW) (in KW) (in KW) (in KW)
KW)
           
20.86 180 22.38 344 700 150

.
2) Lighting System

Lux
Area Type of Light fixture Wattage Lumens
level
High Bay LED fixtures of
Production Shed 750
Narrow Beam Approx 110 Not less than 13000
400 - Square Type LED fixture of
Office / Meeting Room
500 2'X2' Approx 36W Not less than 3900
Store / Record Room 150 Round Type LED downlighter Approx 21W Not less than 2100
Canteen 150 LED T5 fixtures 18/20W Not less than 1600 lumens
Walkways / Corridors 100 Round Type LED downlighter Approx 21W Not less than 2100 lumens
Toilets 80 Round Type LED downlighter Approx 21W Not less than 2100 lumens
Street Lights 20 LED Street Light 60 - 70 W Not less than 6500

3) Lightning Protection System

a) ESE type lightning arrestors with Level-1 Protection radius of 79 mtrs shall be applicable.
4) Earthing System

a) It shall be Copper Plate Earthing for Neutral of Substation (including DG) with Bentonite
Powder, salt and charcoal.
b) It shall be GI plate earthing for body earth of Substation (including DG) with Bentonite
Powder, salt and charcoal.
c) It shall be GI pipe earthing for STP & buildings with Bentonite Powder, salt and charcoal.

5) General Points

a) All floor-mounted Power Distribution panels will be PTA of Form-3B arrangement.


b) The two factory buildings shall have separate LT Panels for power distribution to
machines and services inside buildings.
c) The PCC panel at substation end shall have 01 no. 3200A ACB as incomer, 01 no. 1250A
ACB as outgoing, 02 nos. 800A ACB as outgoing and 01 no. 400A MCCB as outgoing and
02 no. 250A MCCB as outgoing.
d) Suitable APFC panel shall be provided.
e) Two DG’s of 1250 KVA ratings shall be provided.
f) The factory shed area shall be provided with SDFU’s for immediate power disconnection
to machines upon overcurrent. However, for machines with full load current of rating
more than 400A, power will be fed directly from building LT Panel.
g) There shall be computer socket points and 6/16A points in office/meeting rooms.
h) There shall be HVAC installed in offices and meeting rooms.
i) There shall be ceiling fans installed in rooms where HVAC will not be facilitated.
j) Each factory building shall have one Main UPS DB where UPS power will be fed.
k) Each factory building shall have one Main Power DB.
l) Each factory building shall have one Main Lighting DB.

FIRE FIGHTING

1) Fire Detection System

a) Electrical room, Pantry/Kitchen shall have multi-criteria detectors.


b) All other rooms shall have smoke detectors.
c) There shall be Manual Call Points and Hooters as per NFPA standards.
d) Communication cable conforming to IS 7098 Part-I shall be applicable.
e) Beam Detector shall be in Production Shed area.
2) Fire Hydrant System.

a) The Fire Tank capacity shall be 150000 litres.


b) The Fire Pump Room shall house the following pumps:
 One pump for external hydrant line of rating 2280 LPM at 90 m head.
 One pump for internal fire line of rating 2280 LPM at 90m head.
 One jockey pump of rating 180 LPM at 90m head.
 One diesel pump of rating 2280 LPM at 90m head.
 One MCC Panel.

3) Fire Sprinkler System

a) Normal sprinklers of K-factor 5.6 will be installed.


b) For office areas where there are false ceilings, both upright and pendent sprinklers are
considered.

HVAC

1) VRV Cassette units shall be provided in Office and Conference Rooms.

2) TFA Ducting shall be done for Office and Conference Rooms

3) The factory shed shall have air circulators installed at an interval of 20 mtrs.

4) Heavy Duty exhaust fans of 750mm dia shall be provided on walls below bottom of truss
level.

5) Turbo Ventilators shall be on shed over truss.

IP-based CCTV System

1) The whole premises shall be under CCTV surveillance.


2) PoE PTZ cameras are considered that shall monitor the boundary, the roads of the premises
as well as the inside of the Production Shed.
3) Bullet camera is considered for Main Entrance of the premises.
4) Gigabit Network Switches are considered with Media Converter and PoE Injector.
5) NVR with hard-disk for 90 days recording is considered.
6) LED HD Monitor is considered.
7) Cat 6A cable is considered for communication between switch and camera.
8) OFC cable is considered for communication between switches.

Data Networking (IP-based)

1) Layer-3 48-port network switch is considered for each building.


2) A total of 30 intranet points and 18 internet points are considered for each building.
3) Cat6 cables will be laid for communication of RJ45 IO with Switch.
4) OFC cable is considered for communication between switches.

Sewerage Treatment Plant

As per CPHEEO Manual, litres per capita per day is 135. Sewage generation is 80% i.e, 108 L/C/D.

Considering 150 persons per day, KLD shall be (108 X 150)/1000 = 16.2.

So proposed STP is 20 KLD MBBR type.

EXCLUSIONS
The following are deemed to be excluded from our scope of work:

1) 11KV RMU supply and installation and power provision up to RMU.


2) Supply and installation of Main UPS and power provision up to Main UPS DB.
3) Public Addressing (PA) system is not considered.