Software quality management + Team application

project – how to pass labs


Goal: delivery of the project in an iterative way, using new technologies & agile methodologies

Team size: 5 people max (in extraordinary circumstances, 6 people)

Topic & the size of the project: arbitrary, but must be accepted by the teacher

Schedule:

Labs Iteration Task (SQM) Max pts. Task (TAP) Max


no. no. pts.

1 - Topic & team selection 6 - Technology stack 6


- Project management tool selection
selection

2 1 - The final topic & team 6 - The final topic & team 6
selection selection
- Discussion with the - Discussion with the
teacher/possible topic teacher with possible
adjustment topic adjustment
- Dividing the project into - Scope selection & the
iterations plan for the first
- Scope & plan for the first iteration
iteration

3 1 - Configuration of the 6 - First set of mockups 6


repository for - Discussion &
deliverables/code acceptance of the
- Test infrastructure mockups
description – UML - Setting the base
deployment & component configuration for the
diagrams project (Hello world)
- Discussion with the
teacher

4 1 - Development of unit tests for 10 - Proof of concept 10


the proof of concept presentation
- Planning the second
iteration

5 1 - Backup term for PoC n/d - Backup term for PoC n/d

6 2 - Development of three test 8 - Presentation of the 8


pipelines/alternative tools second iteration
appropriate for a chosen mockup set
technology

7 2 - Presentation of the security 8 - Presentation of the 8


systems for the chosen corrected mockup set
technology stack - Presentation of the
progress within the
MVP development

8 2 - Presentation of the project 12 - The MVP 12


setup in a new environment presentation
– teacher’s tests - Third iteration plan
- Presentation of the further presentation
unit tests and/or E2E tests,
appropriate for a chosen
technology

9 2 - Backup term for MVP n/a - Backup term for MVP n/a

10 3 - Presentation of the proper 8 - Presentation of the 8


repository handling in the mockups according to
project the teacher’s
suggestions.

11 3 - Analysis of the performance 6 - Presentation of the 6


tests, appropriate for the progress in the third
chosen technology. iteration

12 3 - Development of the technical 10 - Presentation of the 10


documentation – full third iteration
installation & configuration - Plan of the fourth,
instruction final iteration

13 4 - Development of the 8 - Presentation of the 8


administrator & user guide progress for the fourth
iteration

14 4 - Analysis of the security of 12 - First term of the final 12


the production environment project presentation

15 4 - The final term of delivering n/a - The final term for the n/a
the complete set of project presentation
documentation

TOTAL 100 100

Notes:

- Max pts. – you can get those points in the first date, and one week later you can get half
of max pts. Two weeks later (and later) you get 1 point tops for a given task.
- In order to pass you need to have at least 40 points *and* present the final project and
documentation.