Files to be maintained at site

1. Daily labor and work done reports.


2. Quality reports from external laboratory and at site
testing of material, workmanship checking reports.
3. Bills submitted by contractor with measurements.
4. Challans of material received at site.
5. Contractor work order.
6. Legal compliance file contractor wise.
7. Minutes of meeting at site and at ho.
8. Site instruction file.
9. Consultant visit report file.
10. Material test report (MTC) FILE.
11. Architectural drawings.
12. Rcc drawings.
13. Mep drawings.
14. Landscape drawings.
15. Other consultant drawings.
16. Material po issued by contractor and company.
17. MIS reports by CQRA.
18. MSP schedule for work completion.
19. Cube test and steel test reports.
20. Percentage schedule for bill certification.