PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 1

PRELIMINARY AND GENERAL

1.1 Time related charges

1.1.1 Management of the works item 6


Staff allowances item 6

1.1.2 Plant and equipment item 6


Travel item 6
Site establishment item 6

1.2 Daywork (provisional)

1.2.1 Labour

1.2.1.1 Skilled labour - Capentry day 1

1.2.1.2 Skilled labour - Wetworks day 3

1.2.1.3 Unskilled labour day 4

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 2

EARTHWORKS

2.1 Excavations, filling etc.

2.1.1 Not exceeding 1m deep

2.1.1.1 Trenches m 225

2.1.1.2 Holes No. 200

2.1.2 Exceeding 1m deep

2.1.3 Filling

2.1.3.1 Backfill and compaction 150mm and under with G5 material m2 2534

2.1.3.2 Imported G5 material m3 456

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 3

CONCRETE, FORMWORK AND REINFORCEMENT

3.1 20Mpa/19mm concrete

3.1.1 Strip footings and silo bases m3 60

3.1.2 Pouring of foundations m 225

3.1.3 Poles No. 200

3.2 30Mpa/19mm concrete

3.2.1 Floor slabs m3 300

3.2.2 Casting of slabs (100mm thick) m2 2534

3.2.3 Fibre m3

3.2.4 Concrete kick rail (labour) m

3.3 40Mpa/19mm concrete

3.3.1 Ring beam m3 21

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 4

CARPENTRY

4.1.1 Shutter board 1220 x 2400 x 18mm No. 6

4.1.2 Timber 228 x 50 x 6m Rafters No. 25

4.1.3 41mm Drywall screws No. 1000

4.1.4 3 inch nails kg 5

4.1.5 Cornice adhesive (5 kg) No. 2

4.1.6 Cornice m 90

4.1.7 Bracing strap m 20

4.1.8 Cretestone (40 kg) No. 8

4.1.9 1200 x 2400 x 12.5mm Rhino board No. 45

4.1.10 38 x 38 x 6m Brandering No. 72

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 5

MASONRY

5.1 Face brickwork

5.1.1 110mm Brickwall m2 16

5.1.2 Woodoc 45 brick sealer (1lt) No. 10

5.1.3 280mm Brickwall m2 650

5.1.4 Face brick bricks No. 73000

5.1.5 Plaster stock brick No.

5.1.6 150mm Wide reinforcement built in horizontally m 2600

5.1.7 Cement (50kg bag) No. 2800

5.1.8 19mm All in concrete stone m3 350

5.1.9 Sand m3 100

5.1.10 Abe Epoxy paint abicote 337 (5lt) No. 10

5.1.11 Paint 20lt No. 5

5.1.12 Plaster primer (20lt) No. 2

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 6

PLUMBING AND DRAINAGE

6.1 Drains

6.1.1 160mm PVC pipe m 150

6.1.2 250mm Class 6 PVC pipe m 60

6.1.3 110mm PVC pipe m 120

6.1.4 Plastic "easy drain" for milk line m 3

6.1.5 Heavy duty drain covers No. 6

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 7

METALWORK

7.1 Aluminium windows

7.1.1 2400 x 1200 high sliding No. 4

7.1.2 1200 x 1200 high sliding No. 2

7.1.3 1800 x 1200 high sliding No. 2

7.1.4 2400 x 900 high top hang No. 4

7.1.5 600 x 900 high top hang No. 8

7.2 Aluminium doors

7.2.1 900 x 2100 high clear glass with midrail No. 2

7.2.2 900 x 2100 high solid aluminium No. 7

7.3 Heavy duty roll up doors

7.3.1 3000 x 2100 high roll up No. 1

7.3.2 1500 x 2100 high roll up No. 1

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

ITEM
NO UNIT QUANTITY RATE AMOUNT
BILL NO 8

TILING

8.1 600 x 600 x 5mm tiles m2 90

8.2 Tile adhesive (20kg) No. 25

Carried to final summary USD 0.00


PROPOSED CONCRETE AND BRICKWORK FOR GUVAMATANGA ROTARY

BILL
NO SUMMARY PAGE AMOUNT

1 Preliminaries 1 0.00

2 Earthworks (provisional) 2 0.00

3 Concrete, formwork and reinforcement 3 0.00

4 Carpentry 4 0.00

5 Masonry 5 0.00

6 Plumbing and drainage 6 0.00

7 Metalwork 7 0.00

8 Tiling 8 0.00

Sub-total USD 0.00

Add: Contingency sum


Allow 10 per cent of the above sub-total for contingencies to be used as
directed and deducted in whole or in part if not required by the Architect in
terms of the Principal Building Contract Item 0.00

Sub-total USD 0.00

Add: Value Added Tax


Allow 14.5 per cent of the above sub-total for Value Added Tax Item 0.00

Carried to form of tender USD 0.00