PROVIDING FALL ARREST SYSTEM/

Prepare & Prevent


Instead of Repair & Repent

Page 1 of 4 Date of Revision: 16.05.22 IMS-EG-006-VER 02


Document Issue Date Complied By Document Approved By
Issue Owner
IMS-EG-006-0 20.04.2012 Members of Chairman of Chairman of
Rules & Rules & Rules &
Procedure Procedure Procedure
Sub- Sub- Sub-
Committee Committee Committee

Document Version No Revision Date Standard Document No.

01 17.12.2018 IMS-EG-006-VER 01
02 16.05.2022 IMS-EG-006-VER 02

Table of Contents

Sr. No Contents Page


No.
1 Purpose 3
2 Scope 3
3 Definition & Abbreviations 3
4 Implementation Responsibility 3
5 Record 3
6 EG Renewable Process 3
7 Engineering Guideline 4

Page 2 of 4 Date of Revision: 16.05.22 IMS-EG-006-VER 02


1.0 Purpose

The purpose of this Engineering Guidelines (EG) is to provide guideline to install Fall Arrest
System/Working Platform in Plumbing shafts.

2.0 Scope

This EG shall be applicable for Plumbing Shafts in all buildings and facilities under DLF -RENTCO.

3.0 Definitions/ Abbreviations

3.1 Definition

Nil
3.2 Abbreviations

Nil

4.0 Implementation Responsibility

Facility Management team shall be responsible to ensure implementation of this EG.

5.0 Record

The various records shall be maintained at site as explained in this EG.

6.0 EG Renewable Process

The EG shall be reviewed and revised by the rules & Procedure Sub-committee as necessary
and at a minimum, not later than 3 years from the date of the last revision based on the feedback
from various sources.

Page 3 of 4 Date of Revision: 16.05.22 IMS-EG-006-VER 02


7.0 Guidelines

In plumbing shaft, the fall arrest system/working platform shall be provided at alternate level
with following specification.

1. Frame size as per shaft opening at site.

2. Frame of t-angle 40x40x6 & rectangle pipe 50x25 mm of 14-gauge medium duty with spacing of
50 mm

3. With 01 coat of Zink rich primer & 02 coat of black epoxy paint.

4. Platform at alternate level.

5. Fall arrestor hooking provision to be made on all floors.