You are on page 1of 6

TECH-6 CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF

1.Proposed Position: Assistant Resident Engineer


2.Name of Firm BARQAAB Consulting Services (Pvt.) Ltd.
3.Name of Staff:
4.Current Resident Address:
Telephone No._____________ Email: __________________
5.Date of Birth: Nationality: Pakistani
6.Education:
Degree Major / Minor Institution Date
M.Sc. Hydraulics Engineering University of New Castle Upon Tyne UK 1989
B.Sc. Civil Engineering University of Engineering & Technology Lahore 1974
7.Membership in Professional Societies:
 Member Pakistan Engineering Council (PEC Reg. No. Civil / 211)
8.Other Trainings:
Course Institution / Department Period

9. Stay with the firms: 06 Years


10. Countries of Work Experience: Pakistan
11.Languages:
Level of Proficiency
Language Speaking Reading Writing
English Excellent Excellent Excellent
Urdu Excellent Excellent Excellent
Punjabi Excellent Excellent Excellent

12.Employment Record:
From To Employer Position Held
18-07-2022 To date BARQAAB Chief Engineer

13. Detailed Tasks Assigned:


The responsibilities include but not limited to the following;
Assume full responsibility for the consultants’ team and performance of services under the consultancy contract;
i) Ensure that the consultants’ team undertakes comprehensive review of all already completed studies / literatures
available with PID or any standard organizations;
ii) Keep the Client informed of technical issues and progress of all works both by informal and formal meetings and
correspondence and assist in any project related issues which the Client may require;
iii) Assists the Clint in preparing response to financiers or other authority’s queries, observations, requirements etc related to
this project.
iv) Coordinates with all concerned / involved / related organizations for this project issues.
v) Attends, at Project level, all meetings as required and keep a record of all such meetings.
14. Work Undertaken that Best illustrates Capability to Handle The Task Assigned:
Name of assignment or project: Third Party Monitoring & Evaluation of M&R Works (FY 2015-18)
Month & Year: July 22, 2019 to 07-2022
Location: Sargodha
Client: Punjab Irrigation Department

BARQAAB Consulting Services (Pvt) Ltd. Page 1 of 6


Main project features: The Government of Punjab (GOPunjab) initiated a wide-ranging reform program in the water sector to
improve fiscal management and the quality of service delivery, focusing on GOPunjab's medium-term Irrigation Sector Reform
Program (ISRP). The reform agenda, among other things, aims at promoting more efficient fiscal management and the
rationalization of asset management to ensure the sustainability of the hydraulic infrastructure. The objective of the monitoring and
evaluation by an independent third party is to ensure proper implementation of M&R works as per the Department's currently in
vogue procedures for "Performance evaluation engineering audit of M&R Works".
Positions held: Resident Engineer Sargodha Zone
Activities performed:
 Monitoring and Evaluation of M&R Works checked at Estimation, Execution and Completion stages.
 Residential Supervision of protection / restoration of flood works.
 Supervision of Work executed under Para 2.89 PWD Code, verification of running & final bills against executed works.
 Works being executed through departmental machinery relating bed clearance of drain, strengthening banks in Sargodha
Irrigation Zone.
 Reported defective framed over estimated works. Pointed out to concerned authorizes in case of over payment.
 Checking works over costing over 1 million before Technical Sanction by Competent Authority.
Duration and nature of engagement: 03 Years & 02 Months, Monitoring & Evaluation, Supervision

Name of assignment or project: Third Party Monitoring & Evaluation of M&R Works (FY 2015-18)
Month & Year: February 01, 2016 to March 31, 2019
Location: Sargodha
Client: Punjab Irrigation Department
Main project features: The Government of Punjab (GOPunjab) initiated a wide-ranging reform program in the water sector to
improve fiscal management and the quality of service delivery, focusing on GOPunjab's medium-term Irrigation Sector Reform
Program (ISRP). The reform agenda, among other things, aims at promoting more efficient fiscal management and the
rationalization of asset management to ensure the sustainability of the hydraulic infrastructure. The objective of the monitoring and
evaluation by an independent third party is to ensure proper implementation of M&R works as per the Department's currently in
vogue procedures for "Performance evaluation engineering audit of M&R Works".
Positions held: Resident Engineer Sargodha Zone
Activities performed:
 Monitoring and Evaluation of M&R Works checked at Estimation, Execution and Completion stages.
 Residential Supervision of protection / restoration of flood works.
 Supervision of Work executed under Para 2.89 PWD Code, verification of running & final bills against executed works.
 Works being executed through departmental machinery relating bed clearance of drain, strengthening banks in Sargodha
Irrigation Zone.
 Reported defective framed over estimated works. Pointed out to concerned authorizes in case of over payment.
 Checking works over costing over 1 million before Technical Sanction by Competent Authority.
Duration and nature of engagement: 03 Years & 02 Months, Monitoring & Evaluation, Supervision

Name of assignment or project: Third Party Monitoring & Evaluation of M&R Works (FY 2012-15)
Year: 1st November 2012 to 31st January 2016 Location: SargodhaClient: Punjab Irrigation Department
Main project features: The Government of Punjab (GOPunjab) initiated a wide-ranging reform program in the water sector to
improve fiscal management and the quality of service delivery, focusing on GOPunjab's medium-term Irrigation Sector Reform
Program (ISRP). The reform agenda, among other things, aims at promoting more efficient fiscal management and the
rationalization of asset management to ensure the sustainability of the hydraulic infrastructure. The objective of the monitoring and
evaluation by an independent third party is to ensure proper implementation of M&R works as per the Department's currently in
vogue procedures for "Performance evaluation engineering audit of M&R Works".
Positions held: Resident Engineer Sargodha
Activities performed:
 Monitoring and Evaluation of M&R Works checked at Estimation, Execution and Completion stages.
 Residential Supervision of protection / restoration of flood works.
 Supervision of Work executed under Para 2.89 PWD Code, verification of running & final bills against executed works.
 Works being executed through departmental machinery relating bed clearance of drain, strengthening banks in Sargodha
Irrigation Zone.
 Reported defective framed over estimated works. Pointed out to concerned authorizes in case of over payment.
 Checking works over costing over 1 million before Technical Sanction by Competent Authority.
Duration and nature of engagement: 03 Years 02 Months, Monitoring & Evaluation, Supervision

Name of assignment or project: Technical and financial management of Mega Project under Pakistan Social Development Project
(PSDP) and ADP
Year: 07-01-2010 to 29-03-2010 Location: Punjab (Lahore) Client: Irrigation and Power Department
Main project features: Technical and financial management of Mega Project under Pakistan Social Development Project (PSDP)
and ADP
Positions held: Chief Engineer / Provincial Coordinator
BARQAAB Consulting Services (Pvt) Ltd. Page 2 of 6
Activities performed: Technical and financial management of Mega Project under Pakistan Social Development Project (PSDP) and
ADP. Coordination / Monitoring of Mega Projects under PSDP and ADP including remodeling / rehabilitation of distributaries,
minors. Drains, hydraulic structures, outlets, cross drainage works etc.
Duration and nature of engagement: 03 Months, Monitoring & Evaluation, Supervision

Name of assignment or project: Planning, Design, Review, Monitoring & Evaluation, Supervision of various asisgnments
Year: 01-01-2009 to 31-10-2009 Location: Faisalabad Client: Irrigation and Power Department and PIDA
Main project features: Irrigation Infrastructure
Positions held: Superintending Engineer / Chief Executive Farmers Organization
Activities performed: Responsibilities were included;
 Planning, design and design review, assessment of canal lining thype based on soil characteristics, water quality, approval of
studies regarding change of cropping pattern etc.
 Implementation of PDSP Project of side protection of concrete lining Bhawana Branch, Sultan Pakharadisty and Sarnag Wala
Disty in District Faisalabad and Jhang on Jhang Branch System.
 Supervision and monitoring of farmer organization under PIDA Act.
 Conducted workshops for training of Presidents of Farmer’s Organizations under PIDA in district Hafizabad and Faisalabad.
Duration and nature of engagement: 10 Months, Design, Review Monitoring & Evaluation, Supervision

Name of assignment or project: Planning, designing and preparation of Tender Documents of Various assignments
Year: 16-10-2007 to 31-12-2008 Location: SargodhaClient: Irrigation and Power Department
Main project features: Irrigation infrastructure
Positions held: Superintending Engineer Drainage Circle Sargodha
Activities performed:
 Planning, designing and preparation of Tender Documents of Mona Main Drain Project in District Sargodha. Activities included
layout of drains, selection of alignment, design of hydraulic structures and cross drainage works.
 Planning, designing and execution of rehabilitation of drainage projects in Sargodha Irrigation Zone.
Duration and nature of engagement: 01 Years 02 Months, Planning, designing and preparation of Tender Documents

Name of assignment or project: Rehabilitation of Canals in Lahore Development Circle.


Year: 06-04-2004 to 09-10-2007 Location: Lahore, Gujranwala, Kasur & Okara Districts
Client: Punjab Irrigation Department
Main project features: Rehabilitation of Canals in Lahore Development Circle.
Positions held: Superintending Engineer Development Circle Lahore
Activities performed: Planning, designing and execution of following projects of Infrastructures, lining of canals, stone pitching etc.
Rehabilitation of:-
 Main Branch Lower, in District Lahore & Kasur.
 Lower Depalpur Canal System in District Okara.
 Main Line Lower (UCC) in Distrcit Gujranwala & Sheikhupura.
Duration and nature of engagement: 03 Years 06 Months, Planning, designing and execution

Name of assignment or project: Various assignments


Year: 16-03-2001 to 05-04-2004 Location: Lahore, Kasur & Okara Districts Client: Punjab Irrigation Department
Main project features: Supervision / monitoring of Irrigation Infrastructure
Positions held: Superintending Engineer Depalpur Canal Circle, Lahore
Activities performed: Supervision / monitoring of equitable distribution / regulation of canal water.
 Supervision / monitoring of ADP / M&R works on canals in District Lahore, Kasur & Okara within jurisdiction of Canal Circle.
Duration and nature of engagement: 03 Years, Supervision / monitoring

Name of assignment or project: Monitoring of Model Studies in IRI Zone


Year: 17-06-2000 to 15-03-2001 Location: Lahore, Nandipur Client: Punjab Irrigation Department
Main project features: Monitoring of Model Studies in IRI Zone
Positions held: Executive Engineer / Irrigation Re-search Institute, Lahore
Activities performed: Monitoring of model studies in Irrigation Research Institute and financial management of above said studies /
staff of Irrigation Research Institute.
Duration and nature of engagement: 09 Months, Monitoring of Model Studies

Name of assignment or project: Planning & Review different Mega Projects


Year: 11-05-1999 to 17-06-2000 Location: Lahore Client: Punjab Irrigation Department
Main project features: Updating of statistical data of I&P Department.
Positions held: Deputy Director, Planning & Review Zone, Lahore
Activities performed: Review different Mega Projects Under preparation which includes various functions ranging from technical to
financial planning of projects i.e lining of channels in Punjab.
Duration and nature of engagement: 01 Year, Planning & Review different Mega Projects

BARQAAB Consulting Services (Pvt) Ltd. Page 3 of 6


Name of assignment or project: Supervision, Monitoring & Evaluation, Operation & Maintenance of Balloki Barrage and LBDC works
Year: 01-01-1996 to 10-05-1999 Location: Balloki Client: Punjab Irrigation Department
Main project features: Supervision, Monitoring & Evaluation, Operation & Maintenance of Balloki Barrage and LBDC works
Positions held: Executive Engineer
Activities performed:
 Operation of Head works, review technical reports of Head works, canals and other engineering works. Maintenance of Head
works and its allied components, main canals, flood embankments, river training works, residential colony, rest house and
offices repair work.
 Monitoring and evaluation of development works.
 Supervision of ADP / M&R works for Head Works and its allied structures & LBDC Canal within jurisdiction of XEN Balloki.
Duration and nature of engagement: 03 Years 05 Months, Supervision, Monitoring & Evaluation, Operation & Maintenance

Name of assignment or project: Operation and Maintenance of Jhang Branch System and Rehabilitation of Flood Bunds in Jhang
District
Year: 18-08-1993 to 31-12-1995 Location: Jhang Client: Punjab Irrigation Department
Main project features: Jhang Branch System and Rehabilitation of Flood Bunds in Jhang District
Positions held: Executive Engineer
Activities performed:
 Operation and maintenance of Jhang Branch System in District Faisalabad Jhang and Toba Tek Singh.
 Rehabilitating banks of flood bund in District Jhang to pass normal floods safely.
Duration and nature of engagement: 02 Years 05 Months, Operation and Maintenance

Name of assignment or project: Planning, re-designing and execution of Canals, Distys and Minors of Punjnad Canal System
Year: 18-05-1990 to17-08-1993 Location: Rahimyar Khan Client: Punjab Irrigation Department
Main project features: Planning, re-designing and execution of Canals, Distys and Minors of Punjnad Canal System
Positions held: Executive Engineer C&R Division.
Activities performed:
 Re-design canals / structures off taking disty / minors of Punjnad Canal System in District Rahim Yar Khan.
 Planning, designing and execution of above said canal system under implementation of Scarp-IV project with co-ordination of
WAPDA.
Duration and nature of engagement: 03 Years 03 Months, Planning, designing and execution

Name of assignment or project: Planning, designing and execution of Various assignments


Year: 26-02-1988 to 06-07-1988 Location: Sahiwal Client: Punjab Irrigation Department
Main project features: Planning, designing and execution of Irrigation infrastructure
Positions held: Executive Engineer Sukhrawa Drainage Division.
Activities performed: Planning, designing and execution of ADP and M&R works of drainage system in District Sahiwal and Okara.
Duration and nature of engagement: 04 Months, Planning, designing and execution

Name of assignment or project: Supervision & Financial management of Various assignments


Year: 09-05-1986 to 25-02-1988
Actual Time Spent on the Assignment / Project: 01 Years 09 Months
Location: Multan
Client: Punjab Irrigation Department
Main project features: Supervision & Financial management of various asisgnments.
Positions held: Executive Engineer, Multan Canal Division.
Activities performed: Monitoring / regulation of off taking channels of Sidhani Canal System.
 Supervision of ADP works for rehabilitation Mukhdoom Rashid Branch / Disty in District Multan.
 Financial management of Multan Canal Division.
Duration and nature of engagement: Supervision & Financial management

Name of assignment or project: Operation & maintenance, Supervision of Various assignments


Year: 01-06-1984 to 26-04-1986 Location: Balloki (District Kasur) Client: Punjab Irrigation Department
Main project features: Operation & maintenance, Supervision of Various assignments
Positions held: Sub Divisional Officer (SDO), Balloki Head Works.
Activities performed: Supervision of regulation of Balloki Head Works.
 Maintenance of Head Works and allied spurs.
 Rehabilitation of LBDC & Gugera Branch and allied system.
Duration and nature of engagement: 01 Years 10 Months, Operation & maintenance, Supervision

Name of assignment or project: Operation & maintenance of the various assignments at the Division level
Year: 20-07-1983 to 31-05-1984 Location: Okara Client: Punjab Irrigation Department

BARQAAB Consulting Services (Pvt) Ltd. Page 4 of 6


Main project features: Irrigation infrastructure
Positions held: Sub Divisional Officer (SDO), Gogera Sub Division LBDC
Activities performed:
 Regulation and annual maintenance of Gogera Branch System.
 Handling public problems relating to distribution of water upto farmers field.
Duration and nature of engagement: 10 Months, Operation & maintenance

Name of assignment or project: Operation & maintenance, supervision of various assignments


Year: 09-01-1979 to 19-07-1983 Location: KotAdhu (District Mazaffarghar) Client: Punjab Irrigation Department
Main project features: Irrigation Infrastructure
Positions held: Sub Divisional Officer (SDO), Ahmad Pur Sub Division
Activities performed: Equitable distribution of canal water Thal Branch System of MuzaffarGarh Canal in District MuzaffarGhar.
Rehabilitation of Thal Branch. Expert judgment on public issues related to distribution of water at individual water courses.
Duration and nature of engagement: 04 Years 05 Months, Operation & maintenance, supervision

Name of assignment or project: Various assignments


Year: 01-11-1978 to 02-01-1979 Location: Trimmu Head Works (District Jhang) Client: Punjab Irrigation Department
Main project features: Preparation of scheme
Positions held: Sub Divisional Officer (SDO), Trimu Head Works Sub Division.
Activities performed: Preparation scheme for raising marginal bunds regulation of supply at Head Works in off taking channels.
Duration and nature of engagement: 02 months, Preparation of scheme

Name of assignment or project: Operation & maintenance, Preparation and execution of various assignments
Year: 29-05-1975 to 31-10-1978 Location: Sahiwal Client: Punjab Irrigation Department
Main project features: Operation & maintenance, Preparation and execution of various assignments
Positions held: Sub Divisional Officer (SDO), Ganji Bar Sub Division.
Activities performed:
 Operation of LBDC and its off taking channel within jurisdiction of Ganji Branch Sub Division in District Sahiwal.
 Preparation and execution of ADP schemes for up-keeping eroded banks due to heavy rain of 9L disty and LBDC Canal.
Duration and nature of engagement: 03 Years & 04 Months

BARQAAB Consulting Services (Pvt) Ltd. Page 5 of 6


15. Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience;
(ii) I am not a current employee of the Executing or the Implementing Agency;
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me
in Form TECH-6 provided team mobilization takes place within the validity of this proposal;
(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment;
(v) I certify that I have been informed by the firm that it is including my CV in the Proposal for the “Review of Feasibility Studies and
Detail Design for Drainage Schemes in Selected Area of Irrigation Zone Bahawalpur”. I confirm that I will be available to carry out
the assignment for which my CV has been submitted in accordance with the implementation arrangements and schedule set out
in the Proposal.
If the CV is signed by the firm’s authorized representative, insert:
(vi) I, as the authorized representative of the firm submitting this Proposal for the “Review of Feasibility Studies and Detail Design for
Drainage Schemes in Selected Area of Irrigation Zone Bahawalpur”, certify that I have obtained the consent of the named expert
to submit his CV, and that he will be available to carry out the assignment in accordance with the implementation arrangements
and schedule set out in the Proposal, and confirm his/her compliance with paras (i) to (v) above.
I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

___________________________________________________ Date: 26-05-2023


[Signature of authorized representative of the Firm] Day/Month/Year

Full Name of Authorized Representative: ENGR. ABDUL SAMAD QURESHI

BARQAAB Consulting Services (Pvt) Ltd. Page 6 of 6

You might also like