Professional Documents
Culture Documents
12.Employment Record:
From To Employer Position Held
18-07-2022 To date BARQAAB Chief Engineer
Name of assignment or project: Third Party Monitoring & Evaluation of M&R Works (FY 2015-18)
Month & Year: February 01, 2016 to March 31, 2019
Location: Sargodha
Client: Punjab Irrigation Department
Main project features: The Government of Punjab (GOPunjab) initiated a wide-ranging reform program in the water sector to
improve fiscal management and the quality of service delivery, focusing on GOPunjab's medium-term Irrigation Sector Reform
Program (ISRP). The reform agenda, among other things, aims at promoting more efficient fiscal management and the
rationalization of asset management to ensure the sustainability of the hydraulic infrastructure. The objective of the monitoring and
evaluation by an independent third party is to ensure proper implementation of M&R works as per the Department's currently in
vogue procedures for "Performance evaluation engineering audit of M&R Works".
Positions held: Resident Engineer Sargodha Zone
Activities performed:
Monitoring and Evaluation of M&R Works checked at Estimation, Execution and Completion stages.
Residential Supervision of protection / restoration of flood works.
Supervision of Work executed under Para 2.89 PWD Code, verification of running & final bills against executed works.
Works being executed through departmental machinery relating bed clearance of drain, strengthening banks in Sargodha
Irrigation Zone.
Reported defective framed over estimated works. Pointed out to concerned authorizes in case of over payment.
Checking works over costing over 1 million before Technical Sanction by Competent Authority.
Duration and nature of engagement: 03 Years & 02 Months, Monitoring & Evaluation, Supervision
Name of assignment or project: Third Party Monitoring & Evaluation of M&R Works (FY 2012-15)
Year: 1st November 2012 to 31st January 2016 Location: SargodhaClient: Punjab Irrigation Department
Main project features: The Government of Punjab (GOPunjab) initiated a wide-ranging reform program in the water sector to
improve fiscal management and the quality of service delivery, focusing on GOPunjab's medium-term Irrigation Sector Reform
Program (ISRP). The reform agenda, among other things, aims at promoting more efficient fiscal management and the
rationalization of asset management to ensure the sustainability of the hydraulic infrastructure. The objective of the monitoring and
evaluation by an independent third party is to ensure proper implementation of M&R works as per the Department's currently in
vogue procedures for "Performance evaluation engineering audit of M&R Works".
Positions held: Resident Engineer Sargodha
Activities performed:
Monitoring and Evaluation of M&R Works checked at Estimation, Execution and Completion stages.
Residential Supervision of protection / restoration of flood works.
Supervision of Work executed under Para 2.89 PWD Code, verification of running & final bills against executed works.
Works being executed through departmental machinery relating bed clearance of drain, strengthening banks in Sargodha
Irrigation Zone.
Reported defective framed over estimated works. Pointed out to concerned authorizes in case of over payment.
Checking works over costing over 1 million before Technical Sanction by Competent Authority.
Duration and nature of engagement: 03 Years 02 Months, Monitoring & Evaluation, Supervision
Name of assignment or project: Technical and financial management of Mega Project under Pakistan Social Development Project
(PSDP) and ADP
Year: 07-01-2010 to 29-03-2010 Location: Punjab (Lahore) Client: Irrigation and Power Department
Main project features: Technical and financial management of Mega Project under Pakistan Social Development Project (PSDP)
and ADP
Positions held: Chief Engineer / Provincial Coordinator
BARQAAB Consulting Services (Pvt) Ltd. Page 2 of 6
Activities performed: Technical and financial management of Mega Project under Pakistan Social Development Project (PSDP) and
ADP. Coordination / Monitoring of Mega Projects under PSDP and ADP including remodeling / rehabilitation of distributaries,
minors. Drains, hydraulic structures, outlets, cross drainage works etc.
Duration and nature of engagement: 03 Months, Monitoring & Evaluation, Supervision
Name of assignment or project: Planning, Design, Review, Monitoring & Evaluation, Supervision of various asisgnments
Year: 01-01-2009 to 31-10-2009 Location: Faisalabad Client: Irrigation and Power Department and PIDA
Main project features: Irrigation Infrastructure
Positions held: Superintending Engineer / Chief Executive Farmers Organization
Activities performed: Responsibilities were included;
Planning, design and design review, assessment of canal lining thype based on soil characteristics, water quality, approval of
studies regarding change of cropping pattern etc.
Implementation of PDSP Project of side protection of concrete lining Bhawana Branch, Sultan Pakharadisty and Sarnag Wala
Disty in District Faisalabad and Jhang on Jhang Branch System.
Supervision and monitoring of farmer organization under PIDA Act.
Conducted workshops for training of Presidents of Farmer’s Organizations under PIDA in district Hafizabad and Faisalabad.
Duration and nature of engagement: 10 Months, Design, Review Monitoring & Evaluation, Supervision
Name of assignment or project: Planning, designing and preparation of Tender Documents of Various assignments
Year: 16-10-2007 to 31-12-2008 Location: SargodhaClient: Irrigation and Power Department
Main project features: Irrigation infrastructure
Positions held: Superintending Engineer Drainage Circle Sargodha
Activities performed:
Planning, designing and preparation of Tender Documents of Mona Main Drain Project in District Sargodha. Activities included
layout of drains, selection of alignment, design of hydraulic structures and cross drainage works.
Planning, designing and execution of rehabilitation of drainage projects in Sargodha Irrigation Zone.
Duration and nature of engagement: 01 Years 02 Months, Planning, designing and preparation of Tender Documents
Name of assignment or project: Operation and Maintenance of Jhang Branch System and Rehabilitation of Flood Bunds in Jhang
District
Year: 18-08-1993 to 31-12-1995 Location: Jhang Client: Punjab Irrigation Department
Main project features: Jhang Branch System and Rehabilitation of Flood Bunds in Jhang District
Positions held: Executive Engineer
Activities performed:
Operation and maintenance of Jhang Branch System in District Faisalabad Jhang and Toba Tek Singh.
Rehabilitating banks of flood bund in District Jhang to pass normal floods safely.
Duration and nature of engagement: 02 Years 05 Months, Operation and Maintenance
Name of assignment or project: Planning, re-designing and execution of Canals, Distys and Minors of Punjnad Canal System
Year: 18-05-1990 to17-08-1993 Location: Rahimyar Khan Client: Punjab Irrigation Department
Main project features: Planning, re-designing and execution of Canals, Distys and Minors of Punjnad Canal System
Positions held: Executive Engineer C&R Division.
Activities performed:
Re-design canals / structures off taking disty / minors of Punjnad Canal System in District Rahim Yar Khan.
Planning, designing and execution of above said canal system under implementation of Scarp-IV project with co-ordination of
WAPDA.
Duration and nature of engagement: 03 Years 03 Months, Planning, designing and execution
Name of assignment or project: Operation & maintenance of the various assignments at the Division level
Year: 20-07-1983 to 31-05-1984 Location: Okara Client: Punjab Irrigation Department
Name of assignment or project: Operation & maintenance, Preparation and execution of various assignments
Year: 29-05-1975 to 31-10-1978 Location: Sahiwal Client: Punjab Irrigation Department
Main project features: Operation & maintenance, Preparation and execution of various assignments
Positions held: Sub Divisional Officer (SDO), Ganji Bar Sub Division.
Activities performed:
Operation of LBDC and its off taking channel within jurisdiction of Ganji Branch Sub Division in District Sahiwal.
Preparation and execution of ADP schemes for up-keeping eroded banks due to heavy rain of 9L disty and LBDC Canal.
Duration and nature of engagement: 03 Years & 04 Months