Assignment name:
Country: India
Preparation of Detailed project report, Tendering,
detailed Engineering for civil works, construction
supervision including erection, testing &commissioning
of Maniyar Hydro electric Project. (3x4MW)
Location within country: Maniyar, Kerala Professional staff provided by your
firm: 12
The Project comprises, preparation of the detailed project report, Tendering, detailed Engineering &
construction supervision including erection, testing &commissioning of the following
1. Approach cut – (L- 35m, Base width- 10m)
2. Power Tunnel (L-320m, D- shaped (Base- 7m, Height- 7m)
3. Forebay – (L- 36m, Base Width- 12m)
4. Penstocks- 3nos.
5. Power House (21x21x11m), Capacity- 3x4 MW
6. Head- 14.5m
7. Switch yard
ECIR
PROJECT DATA SHEET
ECIR
PROJECT DATA SHEET
ECIR
PROJECT DATA SHEET
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
The Project comprises, preparation of the detailed project report, Tendering, detailed Engineering of
Civil works and review of engineering works & construction supervision for the construction of
1. Diversion Version- (L- 88.2m, H-17m)
2. Approach Channel- (L-60m, Base Width- 3m)
3. Power Tunnel- (L-873m, D, shaped (D-3m))
4. Surge shaft- dia.- 8m, H- 25m
5. Penstocks- 1no.-2.4 dia., L- 365m
6. Power House (52.3x16.8m)
7. RCC tail race, length 80 m.
8. Switchyard (40x40 m)
9. Transmission line of 110 kV (length 16 Km)
10. Access roads, bridges and other infrastructures
ECIR
PROJECT DATA SHEET
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
1. Revise the detailed project report as per the actual site conditions
2. Providing detailed Civil engineering designs and Drawings for the various components of the
projects
3. Preparation of detailed Tender document for awarding the contract to the contractor
4. Preparation of reports & documents, for getting approval from the government authorities
5. Providing complete field supervision/ quality control services
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N/A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
1. Dam of height 10 m with 5 gated bays. 4 of them upper vent ways of size 6x6.5 m and one lower
vent way of 6x9.5 m
2. An intake block, tarshrack, intake gates and penstocks.
3. A power house (2 units of 3.75 MW)
4. Switchyard and transmission line and approach road etc.
5. Review of Detailed Project Report (DPR) and etc.
ECIR
PROJECT DATA SHEET
ECIR
PROJECT DATA SHEET
The Project comprises, preparation of the detailed design for the following:
1. Providing detailed Civil engineering designs and Drawings for the various components of the
projects
2. Preparation of reports & documents, for getting approval from the government authorities
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
The Project comprises, preparation of the detailed project report, Tendering, detailed Engineering &
construction supervision including erection, testing &commissioning of the following
ECIR
PROJECT DATA SHEET
Location within country: Mysore, Karnataka State Professional staff provided by your
firm: Nos.
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
The Project comprises, preparation of the detailed design for the following components:
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
The Project comprises, preparation of detailed design for the following components:
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
The Project comprises, preparation of detailed design for the following components:
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
The Project comprises, Technical support and detailed Engineering services for the complete Civil
works
Description of Actual Services provided by the firm under different category :
1. Providing detailed Civil engineering designs and Drawings for the various components of the
projects
2. Providing technical support to the client for implementation
ECIR
PROJECT DATA SHEET
Phase I:
1. Surge Tank ( Dia = 15m, H= 19.7m )
2. Penstock ( Dia = 3 m, L = 31.8m), Branches ( Dia = 1.7m, L = 7m)2nos
3. Power house ( L = 18.1m, W = 19m)
4. Down Stream Transition ( L = 14.3m, W = 8.2m)
Phase II:
1. Penstock ( Dia = 2.12m, L = 69m), Branches ( Dia = 1.5 m, L = 22m)2nos
2. Power house (L = 23.3 x 15.84m)
3. Down Stream Transition ( L = 9.6 m, W = 16.55 m)
4. Tail race Channel
5. Switchyard
Description of Actual Services provided by the firm under different category :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
In Consortium with M/s Avant Garde Engineers and Consultants (P) Ltd
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
In Consortium with M/s Avant Garde Engineers and Consultants (P) Ltd
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
1. Providing detailed Civil engineering designs and Drawings for the various components of the
projects
2. Providing technical support for implementation
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR
PROJECT DATA SHEET
Whether project was done alone or as a JV or in association with other firm / firms : Alone
Name of Lead partner in case of JV / Association : N.A No. of months of professional staff
provided by associated firm(s): Nil
Name of Senior Staff involved and functions performed :
ECIR