You are on page 1of 5

Catalog:

一、Product Introduction
二、Product Dimensions
三、Product Installation
Instructions
四.Product configuration list
一、 Product introduction

1. Product appearance and requirements


1.1. Product dimensions: see product dimensions1.
1.2. Product surface treatment: chrome-plated, satin nickle,black, gold, antique bronze
1.3. Product surface requirements: The product surface is clean without obvious surface defects.

2. Material requirements
2.1. Material of wading metal parts: the main body is made of zinc alloy, the inner core of the main
body is made of PPO, the base is made of ABS, and the material of the elbow and spout is SS304.
2.2. Material of wading rubber parts: The material of rubber parts is NBR (NSF).
2.3. Other wading materials: the plastic pipe is made of PE.
3. Conditions of use
3.1. Inlet water source temperature: 5°C-65°C
3.2. Working environment temperature: 0°C-50°C
3.3. Applicable water pressure: 0MPa-0.8MPa
3.4. Applicable water inlet pipe interface: 1/4", 3/8"

4. Technical requirements
4.1. Flow requirements: When the flow pressure is 0.1±0.02MPa and the valve core is fully open, the
flow rate of the faucet is ≥2L/min.
4.2. Tightness: Apply a static water pressure of 0.6-0.8MPa from the water inlet to ensure that the
product has no internal or external leakage.
4.3. Cartridge life: The valve core switch life test is ≥150,000 times under the flow pressure of
0.4±0.02Mpa water pressure, and water leakage is not allowed.
4.4. Water hammer: Under the cyclic pressure of 0-1.04MPa, there is no leakage or deformation after
100,000 times of water hammer test.
4.5. Salt spray test: After a 72-hour neutral salt spray test, the metal parts have no rust and obvious
corrosion after the test.
4.6. Static pressure test: keep the pressure for 20 minutes under 2.0MPa water pressure, and the
product has no leakage;
4.7. Burst test: 4 times the maximum working pressure or 2.76MPa (400psi), there should be no
damage or leakage during the test.
4.8. The handle must be aligned, and the angle deviation is within ±3°, and the opening and closing
are smooth without jamming and friction.4.9. Under the pressure of 0.4±0.02MPa, the outlet water
of the elbow is cylindrical, and there must be no water leakage.
5. Packaging and labeling
5.1. Products should be placed in packing boxes in a certain quantity, and the product number,
drawing number, quantity, production date or marking should be marked on the outside of the
packing box, and the packaging should have reliable anti-collision measures.

6. Transportation and storage6.1. Avoid moisture, rain and pollution during transportation. Handle
with care to prevent damage to the package.6.2. The product should be stored in a ventilated, dry and
cool place.

标记 变更内容 编辑/日期 审核/日期 批准/日期


二、Product Dimensions

标记 变更内容 编辑/日期 审核/日期 批准/日期


三、Product Installation Instructions

Renderings St Installation Notes


ep

First insert the ¼ PE pipe and the 3/8


1 PE pipe into the corresponding ferrules
under the faucet.

Check whether the O-ring of the faucet


base is embedded in the groove, and
2
then insert the end of the faucet screw
through the hole of the basin。

Install the accessory kits under the


countertop one by one, and screw the
small 1/4 copper core knob to the
3 screw rod of the faucet. After
tightening, the half-open spacer
should be completely compressed, and
the faucet should not be loose.

Screw the straight-through joint onto


the screw, insert the PE pipe, and
4 finally snap the bayonet pin into the
gap between the straight-through joint
claws.

When the handle switch of the faucet


手柄座开启 is turned off, turn on the water valve
Handle seat switch to check whether there is water
seepage or leakage around the faucet
open
and the pipes. After confirming that
there is no water seepage or leakage,
turn on the handle switch of the faucet
and let the water flow for 5 minutes,
5
observe whether the faucet can
discharge water normally, and check
Function: waste water. all positions Whether there is water
Effect: : The 1/4 pipe is seepage and leakage. Finally, turn off
connected to the water the handle switch of the faucet and
outlet of the water observe for 10 minutes, and check
purifier, and the 3/8 pipe whether there is water seepage and
is connected to the leakage in each position.
sewer for drainage.

Straight connector specification:


1/4" or 3/8"

标记 变更内容 编辑/日期 审核/日期 批准/日期


四、Product configuration list
Product configuration list
NO Product name QTY Material Remark
Body: Zinc
019 air gap Alloy
1 1
faucet Elbow: SS304
Screw rod: H62
019AG plastic
2 1 ABS
base
3 LFO ring 1 NBR(NSF)

4 Repair kits 1
1031 scalloped
4.1 1 NBR
hole gasket
1031 bell mouth
4.2 1 SS304
gasket
half open
4.3 1 POM
spacer
1/4 copper core
4.4 1 ABS+HPb58-2A
small knob
7/16 to 1/4
4.5 1 POM+NBR+SS304
straight joint
4.6 ¼ clamp 1 POM
7/16 to 3/8
4.7 1 POM+NBR+SS304
straight joint
4.8 3/8 clamp 1 POM

标记 变更内容 编辑/日期 审核/日期 批准/日期

You might also like