Professional Documents
Culture Documents
PURCHASING PROCEDURE
Procedure No: BE/PRO/019 Rev No: 1.0 Rev. Date: 11/06/2019
1. SCOPE
Applicable for purchasing activity carried out as well as carried out at HO, all location as well as
carried out at all sites.
2. PURPOSE
To ensure that the Purchase product confirmed to specified requirement and suppliers are
evaluated and selected on the basis of their ability to meet purchases product requirement.
3. REFERENCE DOCUMENTS
3.1 BEST ENTERPRISES Quality Manual,
3.2 Procedure for Correction and Corrective Action.
3.3 Procedure for Manufacturing.
3.4 Procedure for QA
3.5 Procedure for Contract.
Supplier evaluation is the process to access new or existing supplier base on their delivery, price,
production, and quality of management, technical and services. A standard supplier evaluation
framework shall be used in all cases for the existing and potential suppliers.
6.1.1 Purchase Executive must scan the domestic as well as international markets for the latest and
cost-effective material used in the construction industry through sources like references from
existing suppliers, in house staff, competitor database, industry referrals, and Industry magazines.
6.1.2 The research findings will be collated by the purchase department personnel into a summary
sheet and the same will be forwarded to the Purchase Incharge for review.
6.1.3 In case the Purchase Incharge selects a material profile which interests him, he will issue
instructions to obtain further information on the same. Demonstration for the same will be called
for from the concerned vendor
PURCHASING PROCEDURE
Procedure No: BE/PRO/019 Rev No: 1.0 Rev. Date: 11/06/2019
6.2.1 The need for identifying a new vendor will arise in the following cases:
Current number of approved vendors is lower than the acceptable norm
Item is critical to the business operations of BEST ENTERPRISES
Lead time for an item is high and there is a need to reduce it for reducing inventory holding
costs.
There has been no change in the vendor profile over the last 1 year.
6.2.2 The company will Endeavour to procure mainly from approved vendors. Based on the market
research conducted and other sources i.e. reference from the third party, business associates, the
procurement department will invite the identified vendors for registration with the company.
6.2.3 Vendors will be approached and requested to submit their profiles and product details. The
purchase department will screen the vendors on the basis of the following parameters:
Product- type , grade, specification,
Current & potential manufacturing capacity,
Market reputation,
Creditworthiness,
Financial background,
Legal entity status,
Experience in the industry
An initial vendor enquiry report will be prepared capturing the above information. In case the Head
of procurement department is not satisfied with the findings, the vendor is rejected and the reason
PURCHASING PROCEDURE
Procedure No: BE/PRO/019 Rev No: 1.0 Rev. Date: 11/06/2019
for rejection will be captured and attached along with the vendor profile in a separate rejected
vendor file for future reference. If the procurement department is satisfied, then a joint factory visit
will be carried out by a team comprising of the procurement and quality assurance department
personnel respectively.
The joint team will submit a factory visit report. In case the factory visit report is satisfactory,
additional details (if any) are called for. All the relevant vendor information will be captured in the
vendor database and the same will be updated on a continuous basis.
A monthly report on new vendors identified will be forwarded to the Purchase Incharge for review.
Approved vendors will then be classified into different categories based on the type of order to be
awarded. An entry for approved vendors will be made in the system along with an entry level
rating. After approval vendor code is allotted to approve vendor and is registered in vendor
database. Rejected Vendors are informed and the same is updated in the vendor database along
with reasons for rejection.
PURCHASING PROCEDURE
Procedure No: BE/PRO/019 Rev No: 1.0 Rev. Date: 11/06/2019
schedule of requirement for the quantities required for monthly and annual consumption. The
material requirement is consolidated to arrive at quantity for each construction material and the
schedule of material requirement.
Based on indent received from the site, the Purchase executive shall ascertain whether the material
indented is covered under rate contracts or strategic alliance. If the material is not covered under
PURCHASING PROCEDURE
Procedure No: BE/PRO/019 Rev No: 1.0 Rev. Date: 11/06/2019
any of the above, the purchase executive will prepare enquiry letters and forward it to the Purchase
Incharge for approval. After approval, the enquiries will be floated along with the material list to at
least three approved vendors from the vendor database.
Vendors will be requested to send their quotations to the purchase department. The same will be
opened by the purchase manager. The purchase executive will prepare a comparative rate chart
highlighting the vendors offering the second lowest and lowest quote. The Purchase Incharge will
then renegotiate with both of these vendors to arrive at the most competitive quote.
A verbal quote may be accepted at this level provided the vendor follows up with written (revised)
quotation within 24 hours. The comparative rate chart will be updated with the revised quotes to
determine the least quote vendor. The comparative rate chart will be signed by the Purchase
executive who made it and also by the Purchase Manager. Only in certain exceptional case, the CEO
will be consulted and approval will be obtained. In certain cases where the vendor offering lowest
quote is not given the contract, the CEO should be informed and reasons for the same should be
formally documented.
If the delivery date meets the lead time schedule, the store coordinator will check the availability of
stock at the central warehouse or other sites in the vicinity for the same material and inform the
purchase executive accordingly. If the stock is available at the central warehouse or other sites, a
material transfer note will be prepared through the system and the same will be forwarded to the
Production manager. If the required quantity is not available at a central warehouse or other sites,
purchase order shall be raised for the required material.
PURCHASING PROCEDURE
Procedure No: BE/PRO/019 Rev No: 1.0 Rev. Date: 11/06/2019
order which will be system generated. The purchase order for direct materials shall be raised on
the basis of rate contract as entered into. The purchase order for finished materials will be raised
on the basis of the long term contract with the strategic partner. The purchase order for regular
material shall be raised on the basis of monthly ‘base rate’ determined. The Manager will ensure
that the cost is within the budgeted cost. In case the cost exceeds the budgeted cost, the Purchase
Incharge will provide reasons for the same and obtain approval from the CEO. The purchase order
will be approved as per limits specified in the authority matrix. The PO will then be sent/ emailed
to the vendor.
The evaluation will be carried out based on consignments received during the applicable half
financial year. Vendors to be stratified as Grade A; Grade B, Grade C vendors respectively.
PURCHASING PROCEDURE
Procedure No: BE/PRO/019 Rev No: 1.0 Rev. Date: 11/06/2019