You are on page 1of 13

Project

&)(0DQ]DQLOOR8
Customer

EPC/Partner/Consortium

Applique

IP Classification Export Classification


GE Non-Public- (Class II) NLR
GE Project Document Number GE Project Doc Revision
1604652.GEN.CUDS.A059-MDA-201 A
GE Project Document Description
Outline, GTG PEECC
GE Project Document Type Distribution List
Electrical Equipment
Remarks 1 Remarks 2 Remarks 3

GE Document Number GE Document Revision Disposal Code


307T1611 -
GE Document Title
1604652 PEECC ARRANGEMENT

(c) 2021 GENERAL ELECTRIC COMPANY


All rights reserved. The Information herein is Proprietary and Technically Exclusive content that is solely owned by General Electric Company and/or its affiliates. Thus, it is being provided with the explicit expectation of
restricted and privileged use. All persons or legal entities receiving this information shall be deemed by the act of its receipt have contractually agreed to make no duplications, reproductions of any nature by any means,
modifications, disclosures, or use any portion of this material; except as is expressly authorized in writing by the General Electric Company, and/or its legitimate affiliates.
Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 1 of 12

VENDOR SUPPLIED - GE NOT TO REVISE. THIS DOCUMENT IS FILED UNDER THE GE DRAWING NUMBER AND GE REVISION LEVEL.
PEECC Compartment Equipment Outline

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 2 of 12

DRAWING N° SHT. DESIGNATION REV.

CF0018-D-031-001 1 Cover Sheet B


CF0018-D-031-001 2 Index B
CF0018-D-031-001 3 General Information B
CF0018-D-031-001 4 General Arrangement - Front View A
CF0018-D-031-001 5 General Arrangement - Rear View & Top View A
CF0018-D-031-001 6 General Arrangement - Left View & Right View A
CF0018-D-031-001 7 Equipment Arrangement - Equipment Panel Arrangement B
CF0018-D-031-001 8 Equipment Arrangement - Section A-A & Section B-B & Section C-C B
CF0018-D-031-001 9 Equipment Arrangement - Equipment under the roof B
CF0018-D-031-001 10 Equipment Arrangement - Equipment and Wire Ways & Equipment and Floor B
CF0018-D-031-001 11 Equipment Arrangement - Incoming cable interface B
CF0018-D-031-001 12 Equipment Arrangement - Foundation Interface B

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 3 of 12

General Information 7.Nameplate information ( One nameplate information is following,another is blank)

Equipment Model and Name: MLI-A059 PEECC


1. All measurements are shown in mm and [inch] PEECC-CF-2022028
Serial Number:

Generator Number: GG10831


2. Control cabin weight (kg)
GE Purchase Order Number: 4102338943
Empty weight 29500
GE Ordering Drawing Number: 304T8692
Transportation weight 46700
Installation & Maintenance Instruction Book Number: CF0018-OMM-010-03
3. Control cabin final color
Year of Manufacture: 2023
- The external color of control cabin is
RAL7035 according to painting cycle ISO Weight of the Equipment (kg): 46200
12944 C5H
- Internal of control Cabin painting RAL 9010 Manufacturer's Name: CF INDUSTRIAL
according to painting cycle ISO 12944 C3 N61078
GE Vendor Code Identification Number:
(not include isolation sandwich plate)
- Isolation sandwich plate color is white Project Name: CFE Manzanillo III Project

Product description: PEECC compartment


4. Control cabin size 20000x3900x3900
KKS code: 11UBB10
structure made by steel Q235, insolation
made by sandwich panel.

5. Control cabin insulation finished as follow


- Floor: 80mm thickness rockwool.
- Roof: 75mm thickness polyurethane. 8.Warning label information
- Wall: 75mm thickness polyurethane.
- Door: 50mm thickness rockwool.
6. IP degree: IP54

CAUTION! Access allowed


for Maintenance and
Commissioning purpose only

Warning Label

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 4 of 12

Front View
Lifting Hook Lifting Hook

20000
[787.4"]
Lifting Beam Lifting Beam

2600 900 7101 4347 1825


[102.36"] [35.43"] [279.57"] [171.15"] [71.87"]

HVAC 1 HVAC 2 HVAC 3

[153.54"]
CAUTION! Access allowed
for Maintenance and
Commissioning purpose only

3900
CAUTION! Access allowed
for Maintenance and
Commissioning purpose only

[86.61"]
2200
500 Grouding Pad Grouding Pad
[19.69"]
1200 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
[47.24"] [59.06"] [59.06"] [59.06"] [59.06"] [59.06"] [59.06"] [59.06"] [59.06"] [59.06"] [59.06"] [59.06"]
A 500
[19.69"]
Missing stairs

70 See "Walkway
[3"] Bracket Detail" Center Line of Holes
F F
41
[1.5"]
20
M "]
1
[M
[14.5"]
370

76 E E
[73.5"]
1872
[6"]
153

[66.5"]

[3"]
1693
[2"]

[60.5"]
53

1540
[55.5"]

152
1412

[6"]

Equipment Baseline
Grouding Pad Detail
Section E-E Section F-F
[4"]
100

100
[4"] 14
M

Th. 30 mm
45
[2"]
50

[2"] Stainless Steel


Plate Thickness 30 mm
CF INDUSTRIAL

Note: Anchor bolts and chemical anchor of grounding


shouldn't be CF scope of supply. The bolt of pedestal and
compartment is provided by CF.

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 5 of 12

Rear View
Lifting Beam Lifting Beam

[147.4"]
3744

Grouding Pad Grouding Pad

Top View
[153.54"]
3900

HVAC 1 HVAC 2 HVAC 3

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 6 of 12

Left View

Lifting hook

Right View

Lifting Beam

4% Slope 4% Slope

CAUTION! Access allowed


for Maintenance and

[153.54"]
Commissioning purpose only

[110.22"]
[147.4"]

3900
HVAC 1 HVAC 3
3744

2800
[98.61"]

[86.61"]
2505

2200
[15.75"]
400

3576 900 1100


[3.94"]

[35.43"] [43.29"]
100

[140.79"]

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 7 of 12

Equipment Panel Arrangement


C
1025 1130 30 30 30
[40.36"] [44.49"] [1.18"] [1.18"] [1.17"]
670 800 600 1600 803 11840
[26.38"] [31.5"] [23.62"] [62.98"] [31.62"] [466.14"]

[1.95"]
[5.1"]

50
130
TOIP AC MCC

Control Box

[31.5"]

[33.07"]
C01

800

840
Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables
88QE & 88ES Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance
BMS

A Charger+DC distribution A

[31.02"]
Battery

788
[129.92"]

GHM
3300

[78.83"]
600 2002
[23.82"]
B B

605

[23.62"]
[11.81"]
300
DC switch
NOVEC
1230
GPP GAMP ECS
UPS

[23.62"]
TCP

[1.96"]

[1.98"]

[1.98"]

600
HVAC 1 HVAC 2 HVAC 3

50

50

50
800 6001 1100 2418 800 1100 800
[31.5"] [236.27"] [43.29"] [95.19"] [31.5"] [43.31"] [31.5"]
30
[1.17"]

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 8 of 12

Section A-A
20000
[787.4"]
H2 detection

AC MCC
GHM Charger+DC distribution
Type1 Type1 Type1 Type1 Type1 Type1 Type1 Type1 Type1 Type1 Type1

I240
Type1 Type1
I256
B230 B230

type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2
A A A A A M221 5HP A A A A A A A A A A A A M221 5HP A A A A A
Spare Space Spare Space Spare Space Spare Space

[147.42"]
TOIP
Manufacturer CF INDUSTRIAL Manufacturer CF INDUSTRIAL
Serial No MCC-CF-2023XXX Serial No MCC-CF-2023XXX
Project IPS Number 1144563 Project IPS Number 1144563
type2 type2 type2 type2 type2
M221 5HP M221 5HP
GE Ordering Drawing Number 304T8691

B B B
GE Ordering Drawing Number 304T8691
Year of Manufacturing
Service Voltages
Frequency
2023
400/120VAC,220VDC
60HZ
Year of Manufacturing
Service Voltages
Frequency
2023
400/120VAC,220VDC
60HZ
B B
Rated Insulated Voltage 1000 / 500 V Rated Insulated Voltage 1000 / 500 V

Spare Space Spare Space D210

3744
Control Box
Main Busbar Rated Current 1250A Main Busbar Rated Current 1250A

Switchbord KKS No. XXXXXXXX Switchbord KKS No. XXXXXXXX


Rated Short-circuit Current 65KA 1S Rated Short-circuit Current 65KA 1S
Internal Arc 65KA/300ms Internal Arc 65KA/300ms
Internal Arc Classification IEC 61641 Criteria 1-5 Internal Arc Classification IEC 61641 Criteria 1-5
IP Degree
Auxiliary Voltages
IP31
220VDC
Spare Space IP Degree
Auxiliary Voltages
IP31
220VDC
Weight of AC MCC(kg) 6000

type2
Weight of AC MCC(kg) 6000

type2
200A REDUNDANT TO BATTERY
C M221 5HP C M221 5HP ‚1HP FM-2996A/B
type2
120V Distribution Panel type2 ƒ2.5KW GAS DRYER CONTROL PANEL

[74.24"]
C C

C01
D210 D310 D311 H311 „20.8KW HVAC #2

Battery
type2 type2 type2 200A TO BATTERY type2 type2 type2
…20.8KW HVAC #4
B B D M221 5HP Spare Space B B D M221 7.5HP
‚200A TO LEC Spare Space

88QE & 88ES


1886 †7.5KW 23WM-1
ƒ20.8KW HVAC #1 ‡100A Equipped Spare
„20.8KW HVAC #3 ˆ30A Equipped Spare
type2
M221 5HP
type2
H211 3.6KW
type2
M221 7.5HP type2
E D TEXT (EN) TEXT (EN) TEXT (EN)
…70A Equipped Spare E D
‰20A Equipped Spare
TEXT (EN) TEXT (EN) TEXT (EN) †50A Equipped Spare

type2 type2 type2 Spare Space


F M221 7.5HP E H211 3.6KW TEXT (EN) TEXT (EN) TEXT (EN)
F H211 7.2KW TEXT (EN) TEXT (EN) TEXT (EN)

TEXT (EN) TEXT (EN) TEXT (EN) TEXT (EN) TEXT (EN) TEXT (EN)

type2 type2 type2 type2 type2 type2 type2 type2 type2 type2 type2
C C G H241 10HP F C B C C G H210 4.5KW TEXT (EN) TEXT (EN) TEXT (EN)
E H211 45KW E
M231 40HP
TEXT (EN) TEXT (EN) TEXT (EN)

TEXT (EN) TEXT (EN) TEXT (EN)

Battery charger#1 Battery charger#2


type2
Transformer 15KVA type2
TEXT (EN) TEXT (EN) TEXT (EN)

H With 15KVA H With 15KVA


Upstream T220
Transformer D210 Transformer D210
M240 100HP
type2

G Outlet I330 M240 100HP


type2

F
M221 50HP M231 40HP

PE Bus bar; Size 40x5

Section B-B

GAMP
TCP
GHM
Supply Supply Mark* VIeS Control

Supply Exit
Damper Damper Damper
DM6 DM4 DM2
[153.54"]

LOUVER LOUVER LOUVER LOUVER LOUVER LOUVER LOUVER LOUVER LOUVER LOUVER

HVAC 3 HVAC 2 HVAC 1


3900

GPP UPS
ECS NOVEC Battery
Return Return Return
Damper Damper Damper 1230
DM7 DM5 DM3
Fan
FAN1 FAN2 FAN3 FAN4 FAN901 FAN902 FAN7 FAN8 FAN9 FAN10

PE Bus bar; Size 40x5

Section C-C
3900
[153.55"]

TCP AC MCC
GHM

DC switch
[153.54"]

[147.4"]
3900

3744

CF INDUSTRIAL
[55.59"]
1412

PE Bus bar; Size 40x5

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 9 of 12

Equipment under the roof

Maintenance Space
TOIP AC MCC

Control Box

Maintenance Space
C01 88QE & 88ES Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
BMS

Charger+DC distribution
E571
E561 E562 E563 E564 E565 E566 E567 E568 E569 E570
GHM

E524
E521 E522 E523 E525 E526 E527 E528 E529 E570
Battery

E531
DC switch
NOVEC 1200
1230 [47.24"]
GPP GAMP ECS
UPS
1800
TCP
[39.37"]

[70.87"]
HVAC 3 HVAC 1 HVAC 3
1000

[29.92"]
760
Maintenance Space
760
[29.92"]
Maintenance Space Maintenance Space Maintenance Space

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 10 of 12

Please include a cable tray


elevation view,
cable tray will be
accommodate in the 1412
mm?,
Equipment and Wire Ways The tray is included?
is the cable tray support
included?
Please, consider free space
for the cables entry that feed
Control Box JB en the field
AC MCC Cable tray note:
C01 Charger+DC distribution TOIP
1. The different wiring need placed in different
88QE & 88ES cable tray. For this project, we consider total
Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables Cables
3 level cable tray: L1/ L2/ L3/ L4.

L1/100x50mm

L4/100x50mm

L4/100x50mm
Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance Entrance

BMS
2. Due to the different level wiring size and

L3/100x50mm

L3/100x50mm
quantity is different, so the cable tray size is

L1/100x50mm

L1/100x50mm
L1/100x50mm
Battery

L1/100x50mm

L1/100x50mm
L1/100x50mm

L1/100x50mm
L1/100x50mm

L1/100x50mm
different. For this project, the cable tray size

L1/100x50mm
L1/100x50mm
L4/200x50mm L4/200x50mm L4/200x50mm L4/200x50mm L4/200x50mm

L1/100x50mm

L1/100x50mm
L3/200x50mm L3/200x50mm L3/200x50mm L3/200x50mm L3/200x50mm
consider 600x100mm, 100x50mm.
GHM

3. According the above information, the cable

L4/100x50mm
L2/200x50mm L2/200x50mm L2/200x50mm

L4/100x50mm
L4/100x50mm
L4/100x50mm

L3/100x50mm
L3/200x50mm

L3/200x50mm

L3/200x50mm

L3/200x50mm

L3/100x50mm
L3/100x50mm

L3/100x50mm
L3/100x50mm
tray marked information shall be: level/ size.

L4/100x50mm
L1/300x50mm L1/300x50mm L1/300x50mm L1/300x50mm L1/300x50mm

L3/100x50mm
L1/200x50mm

L1/200x50mm

L4/100x50mm
L4/100x50mm
L4/100x50mm

L4/100x50mm

L3/100x50mm
L3/100x50mm
For example, L4/ 100x50mm: L4 level cable
L3/100x50mm

L3/100x50mm
DC switch tray, 100x50mm size.
NOVEC
4. L1 C&I routing ( analog and 24Vdc logic)
L4/100x50mm
1230
GPP GAMP ECS L2 LV control routing (220Vdc)
UPS
L3 LV power and control distribution
L4 LV power distribution
TCP HVAC 2 HVAC 1
HVAC 3

Equipment and Floor


Charger+DC distribution TOIP AC MCC

Control Box
C01 88ES Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
Cables
Entrance
BMS

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
Battery

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A
GHM

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

DC switch
A A A A A B B B B B B B B B B B B B B B B B B B B B B B B B

A A A A A GPP GAMP ECS


UPS

NOVEC TCP Please, indicate details for


1230 HVAC 3 HVAC 2 HVAC 1
the cable entry to the
equipments

Please, indicate
symbology or notes about
that

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 11 of 12

Incoming cable interface

2848 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180 180
[112.14"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.09"]
820 1020 664 620 750
[32.28"] [40.16"] [26.13"] [24.41"] [29.53"]

A A B A C A C A A A C C A C C D A A

[11.49"]
292

[24.02"]
Battery

610
F

Please, confirm if thes are


[17.72"] holes for the cable entry to
the PEECC
450
F

E F G E H E E E H E H H E E

HVAC 3 HVAC 2 HVAC 1

[11.5"]
292
820 1020 664 620 750
[32.28"] [40.16"] [26.13"] [24.41"] [29.53"]
180 1180 180 180 180 180 180 180 980 180 180 180 1180 358
[7.08"] [46.46"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [7.08"] [38.58"] [7.09"] [7.09"] [7.09"] [46.46"] [14.09"]

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR


Doc Name : 307T1611 Rev - Released Date : 2023/03/02 Page 12 of 12

4948.5 4948.5 4948.5 4948.5


[194.82"] [194.82"] [194.82"] [194.82"]

[162.68"]
[146.7"]
3726

4132

Load table (Unit KN) :


- Wind - Seismic
2020 CFE Manual Seismic - 2015 CFE Manual
Cap C1.4 Manual de diseno por viento seccion C Cap C1.3 Diseno par Sismo
Structure classification A Seismic Zone D
Structure typ2 Structural Group A1
Terrain cat 1 Maximum Ground Acceleration, ao = 0.65g
Vrt200=218.30 km/h Spectral acceleration, c = 1.74g
FT=1.0 Ta = 0.175
Tb = 0.85
Tc = 2.0
r=0.8100
k=0.7

CF INDUSTRIAL

GE Non-Public- Class II - (Non Critical) NLR