You are on page 1of 1

KEY PLAN

8.THERMAL LOAD.

9.HYDROSTATIC LOAD.

NOTES

10. REINFORCEMENT

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

MAR
00 2023 ISSUED FOR TENDER PACKAGE

ED
D

ED
D

WE
NE

ITT
N

KE

OV
AW

VIE
SIG

EC

BM

PR
REV.NO. DATE ISSUED

DR

RE
CH
FOR

SU
DE

AP
DRAWING
STATUS ISSUED FOR TENDER PACKAGE
11.SERVICEABILITY AND DEFLECTIONS CLIENT

CONSULTANT

$$ ALL TABULATED FACTORS OF TENSION COULD BE DECREASED BY 10 PERCENT WHERE fc'=35 MPa IS USED
& PARTNERS
CONSULTING ENGINEERS

TENDER

CONTRUCTION WORKS
FOR THE UPGRADE OF AL WAGAN STP IN AL AIN

GENERAL NOTES

TENDER NO. 0-15527

SHEET SIZE A1

SCALE DRAWING No. REV.


NTS
ST-GNT-02 00