IRRIGATION SYSTEM LIST OF DRAWINGS & SYMBOLS
DESCRIPTIONS

A A
DWG NO. DESCRIPTION SCALE PAPER SIZE F/A FROM ABOVE SITE
A=26,455 SQM
PIN=67100131

BP2021-C026S-JWN-A01-IRRIGATION SYSTEM-LA-1001 COVER PAGE - IRRIGATION SYSTEM N.T.S A1 T/A TO ABOVE

1:100 A1 F/B FROM BELOW


BP2021-C026S-JWN-A01-IRRIGATION SYSTEM-FP-1001 LANDSCAPE EMITTER PART 1 - IRRIGATION SYSTEM

BP2021-C026S-JWN-A01-IRRIGATION SYSTEM-FP-1002 LANDSCAPE EMITTER PART 2 - IRRIGATION SYSTEM 1:100 A1 T/B TO ABOVE

BP2021-C026S-JWN-A01-IRRIGATION SYSTEM-DL-1001 CONTROL WIRING DIAGRAM - IRRIGATION SYSTEM N.T.S A1 @H/L AT HIGH LEVEL

BP2021-C026S-JWN-A01-IRRIGATION SYSTEM-DL-1002 IRRIGATION STANDARD DETAILS - IRRIGATION SYSTEM N.T.S A1 NC NORMALLY CLOSED KEY PLAN
NOTE:

.1THIS DRAWING IS THE PROPERTY OF DOHA GROUP TRADING & CONTRACTING

NO NORMALLY OPEN COMPANY.IT IS NOT ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
B . 2ALL DIMENSIONS SHOWN ARE IN MM, UNLESS NOTED OTHERWISE. B
IRRIGATION UPVC . 3THESE DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT
ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL
MAIN LINE
RELEVANT SECTIONS OF THE SPECIFICATIONS.

IRRIGATION WATER PUMP SCHEDULE . 4ALL LEVELS ARE REFERENCED WITH QND.95
EMITTERS
. 5ALL BUILDINGS COORDINATES ARE IN RELATION WITH QND.95
REF SYSTEM SERVED FLOW L/s HEAD BAR POWER KW REMARKS POLYETHYLENE PIPE
IRP-01 IRRIGATION PUMP 5.3 3.0 3.5 1 DUTY, 1 STANDBY, VFD
SV SOLENOID VALVE

QC QUICK COUPLING VALVE

IRRIGATION PUMP OPERATION SCHEDULE EMITTER L/h


C
STATION VALVES NO. FLOW L/h START TIME SHUT TIME STATION OPERATION TIME BACK FLOW PREVENTER
C
SV-01 2196
A-1 08:00 AM 8:30 AM 30 MINUTE
SV-02 9720 IRP-01 IRRIGATION PUMP LEGEND:
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION
SV-03 11376
A-2 In addition to the hazards/risks normally associated with the types of work detailed
SV-04 7704 08:30 AM 09:00 AM 30 MINUTE IRRIGATION UPVC MAIN LINE on this drawing, note the following specific residual risks (Reference shall also be
made to the design hazard log)

SV-05 6444 EMITTERS POLYETHYLENE PIPE Construction


SOLENOID VALVE
A-3 SV-06 2448
09:00 AM 09:45 AM 45 MINUTE VALVE NO. Maintenance / Cleaning
SV-07 2556 VALVE SIZE
WATERING TIME
D Use
FLOW RATE D

QUICK COUPLING VALVE


SOFTSCAPE LEGEND Decommisioning / Demolition
EMITTER L/h
BACK FLOW PREVENTER SN DOCUMENT REFERENCE
PATTERN DESCRIPTION / TYPE

GROUND COVER: NOTE:


SEETZENIA LANATA IRRIGATION PUMPS, VALVES,
EMITTERS,CONTROLLERS ... ETC. FINAL
SELECTION SHALL BE CONFIRMED BY
SPECIALIST / SUPPLIER.
E E
PARKINSONIA 00 2/8/2023 DETAIL DESIGN PACKAGE

ACULEATA Rev Date Revision Details Drawn Chkd. Appd.

CORNULACA
MONACANTHA
Supervision Consultant:

F SEIDLITZIA F
ROSMARINUS Main Contractor:
Doha Group Trading & Contracting
Doha atar
T
a
it dgc atar co
SEIDLITZIA
ROSMARINUS Lead Designer : Sub Contractor:

EXISTING TREES
G Project Code:
BP 2021 C 026 S G
Status:
DD
Discipline:
IRRIGATION
Project Name:
DESIGN AND BUILD OF REHABILITATION
AND RENOVATION OF JAWAAN SCHOOL

Drawing Title:

COVER PAGE - IRRIGATION SYSTEM

H H
Drawn: M.KHAMAYSEH Checked: R.ALFUQAHA

Designed: M.KHAMAYSEH Approved: R.ALFUQAHA

Date: 2/8/2023 Scale : 1:300

Drawing Number: Revision:


BP2021-C026S-JWN-A01-IRRIGATION SYSTEM-LA-1001
00