Professional Documents
Culture Documents
SHEET
INDEX OF DRAWINGS
NO.
ARCHITECTURAL
PERSPECTIVES
A1 SITE DEVELOPMENT PLAN
VICINITY MAP
A2 GROUND FLOOR PLAN
SECOND FLOOR PLAN
ROOF DECK
A3
ROOF PLAN
A4 ELEVATIONS
A5 BUILDING SECTIONS
GROUND FLOOR
A6 REFLECTED CEILING PLAN
SECOND FLOOR
REFLECTED CEILING PLAN
GROUND FLOOR-FLOOR
A7 TILE LAYOUT
SECOND FLOOR-FLOOR
TILE LAYOUT
STAIR DETAILS
A8 RAMP DETAILS
SCHEDULE OF DOORS & WINDOWS
STRUCTURAL
S1 CONSTRUCTION NOTES 1
S2 CONSTRUCTION NOTES 2
S3 FOUNDATION PLAN
GROUND FLOOR REINF. PLAN
SECOND FLOOR FRAMING PLAN
S4
ROOF FRAMING PLAN
REINFORCEMENT SCHEDULES
S5 STRUCTURAL DETAILS
S6 CONCRETE STAIR DETAILS
VICINITY MAP S7
PLUMBING
P1
P2
P3
N P4
P5
W E ELECTRICAL
S E1
E2
E3
E4
PERSPECTIVES
A B C D E A B C D E
B B
FIRE
UP
EXIT FIRE
SEPTIC VAULT
EXIT
D
1
DN
W W W W W W W W
3 3 5 5 4 3 5 5
6 6 D
4
TOILET (FEMALE)
TOILET (FEMALE)
D
TOILET 2 ANTE
H A L L W A Y
TOILET (MALE)
SECTION
ROOM
D TOILET (MALE)
W 2
2 INSTITUTIONAL D
3 W
2
PANTRY D
INSTITUTIONAL
3
D D
D 3 4 D
3 3
5 5
H A L L W A Y
SATELLITE CONFERENCE
W HEAD OFFICE W ROOM
A 2 INSTITUTIONAL W
2 A' A 2 ENGINEERING SECTION W
2 A'
D
2
4 LOBBY
4
TOILET W
(COMMON AREA) 4
W W D WAITING W
2 OPERATIONS SECTION D 2 1 ENGINEERING SECTION 2
3 AREA
INFORMATION
D COMMISSION D
2 4
ON AUDIT
3 3
D
2 D
UP
1
ADMIN AND FINANCE SECTION
D D
W 1 2 W STOCK
W W
2 1 2 ROOM 1
W W W
6 7 2
SERVER
DN
PORCH
2 W W
2 W W
3
RAMP UP
3 3 3
1 B' 1 B'
B D
1
DN
FIRE
7 EXIT
A ROOF DECK
A'
5 C D
4
D
1
1317.07
W
1
4
DN
2 B'
3
ROOF PLAN
ROOF DECK
FRONT ELEVATION REAR ELEVATION
6 5 4 3 2 1
CF
WP
6 6
Sfc
HARDIFLEX BD. ON S3W
METAL FURRING HARDIFLEX BD. ON
SPACED @ METAL FURRING
60 O.C BOTHWAYS SPACED @
60 O.C BOTHWAYS Sab
HARDIFLEX BD. ON
METAL FURRING HARDIFLEX BD. ON
METAL FURRING Sa
SPACED @ SPACED @
60 O.C BOTHWAYS 60 O.C BOTHWAYS
HARDIFLEX BD. ON
METAL FURRING
SPACED @
60 O.C BOTHWAYS
5 5
HARDIFLEX BD. ON METAL FURRING SPO
SPACED @ 60 O.C BOTHWAYS
HARDIFLEX BD. ON METAL FURRING HARDIFLEX BD. ON METAL FURRING HARDIFLEX BD. ON METAL FURRING
SPACED @ 60 O.C BOTHWAYS SPACED @ 60 O.C BOTHWAYS SPACED @ 60 O.C BOTHWAYS
TOILET C D
HARDIFLEX BD. ON METAL FURRING HARDIFLEX BD. ON METAL FURRING
SPACED @ 60 O.C BOTHWAYS SPACED @ 60 O.C BOTHWAYS
HARDIFLEX BD. ON
METAL FURRING
SPACED @
HARDIFLEX BD. ON METAL FURRING 60 O.C BOTHWAYS
HARDIFLEX BD. ON METAL FURRING HARDIFLEX BD. ON
SPACED @ 60 O.C BOTHWAYS METAL FURRING
SPACED @ 60 O.C BOTHWAYS SPACED @
DN
60 O.C BOTHWAYS
DN
3
2 2
RAMP UP
2
1 1
ROOFDECK REFLECTED
CEILING PLAN
GROUND FLOOR REFLECTED CEILING PLAN SECOND FLOOR REFLECTED CEILING PLAN
A B C D
A B C D
FIRE
SEPTIC VAULT EXIT
6 6
5 5
C D
4 4
TOILET
3 3
DN
UP
DN
2
2 2
RAMP UP
1 1 ROOFDECK
FLOOR TILE LAYOUT
RAMP PLAN
DESIGNATION
NO. OF SETS
LOCATION
200
700
900
PORCH
ROAD LEVEL
RAMP
1:12 SLOPE
RAMP DETAIL
95
R3
50
50
0
60
DESIGNATION
150
50mmØ 6.25mm
MOUNTING PLATE
SPECIFICATION
TOP OF HANDRAIL
+900.00mm
150
100
CONSTRUCTION NOTES
REGION OF NO SPLICE
A B C D A B C D
C2 F2 C2 F2 C2 F2 C2 F2 C2 F2
FTB 1
FTB 1
FTB 1
FTB 1
C1 F1 C2 F2 C1 F1 C1 F1 C1 F1
FTB 1
FTB 1
FTB 1
C1 F1 C1 F1 C1 F1 C1 F1
C2 F2
FTB 1
FTB 1
FTB 1
FTB 1
C1 F1 C2 F2 C1 F1 C1 F1 C1 F1
FTB 1
FTB 1
FTB 1
C2 F2 C2 F2 C2 F2 C2 F2
FTB 2 FTB 2
2 C2 F2
2
FTB 1 FTB 1 RAMP UP
1 1
2B 2 2B 2 RB 1 RB 1 RB 1
2B 1 2B 1 RB 1
6 6 C3 C3 C3 C3 C3
RB 1
S1 S2
RB 1
RB 1
S1
2B 1
S2
2B 1
2B 1
RB 1
2B 1
S5
2B 1
S6 S5
2B 1 2B 1 2B 2 2B 2 RB 1 RB 1 RB 1 RB 1
5 5 C3 C3 C3 C3 C3
RB 1
2B 1
2B 1
RB 1
2B 1
RB 1
RB 1
2B 1
S1
2B 1
S2 S2 S6 S5 S5
S1
2B 2 RB 1 RB 1 RB 1 RB 1
2B 1 2B 1 2B 2
4 4 C3 C3 C3 C3 C3
2B 1
2B 1
2B 1
RB 1
S2
RB 1
2B 1
S2
RB 1
S5
2B 1
RB 1
RB 1
S1 S1 S5 S5 S5
2B 2 2B 2 RB 1 RB 1 RB 1 RB 1 RB 3
2B 1 2B 1 2B 5
3 3 C3 C3 C3 C3 C3
S3 S6
RB 1
RB 1
RB 1
2B 1
2B 1
RB 2
2B 1
RB 1
2B 4
2B 1
S1 S1 S4 S5 S5 S4
2B 2
RB 1
S3
S1
2B 1 C3 RB 1 C3 RB 1 C3 RB 2 C3
2B 1
2 2B 3 2B 3 2B 5
2
2B 5
RB 3
2B 5
S4
C3
1 1
TYPICAL COLUMN
TYPICAL RC BEAM & COLUMN FOOTING DETAIL
COLUMN SCHEDULE
12 0 2-12 0
LINTEL DETAIL
CHB WALL
FOOTING SCHEDULE
TYPICAL ONE WAY SLAB DETAIL
1omm 0 @ EVERY
3 LAYERS OF CHB
3-1omm 0
CONTINOUS BARS
SLAB SCHEDULE
WALL & WALL FTG. DET.
Note: In the interpretation of these drawings, only indicated dimensions shall govern and
distances or sizes shall not be scaled for construction purposes.
Stair Section
Second Floor Level STF-1 600x600mm; 12@300mm BW
150MM
(MIN)
450
300
A B C D
A B C D
UP
SEPTIC VAULT SEPTIC VAULT
DN
FIRE
EXIT
6 6
TOILET (FEMALE)
TOILET (FEMALE)
TOILET
TOILET (MALE)
TOILET (MALE)
PANTRY
5 5
4 4
TOILET
3 3
UP
STOCK
ROOM
DN
PORCH
2 2
RAMP UP
1 1
6 6
TOILET (FEMALE)
TOILET (FEMALE)
TOILET
TOILET (MALE)
TOILET (MALE)
PANTRY
5 5
4 4
TOILET
3 UP
3
DN
PORCH
2 2
RAMP UP
1 1
FROM MAIN WATER
SOURCE
B T
IO
TO EL
(T
F ILE EF
E XI R T( AM
DN I TE MA )EL
LE
)
DN
5
S
R TO
O C
O K
M
4
3
R
VT
2
1
D SECOND FLOOR
SANITARY ISOMETRIC VIEW
C SE
P TIC
VA
U LT
TO
ILE
T
B PA
NT
R Y
TO
ILE
T(
FE
MA
LE
)
TO
A ILE
T(
MA
LE
)
UP
6
H
RC
PO
4
UP
MP
RA
2
1
GROUND FLOOR
SANITARY ISOMETRIC VIEW
D
C SE
PT
IC
VA
UL
T
B T
LIO E
TO (T F
ILE ME A
E FIR T( )EL
X MA
LE
IT E
)
DN
2
1
D SECOND FLOOR
WATER LINE ISOMETRIC VIEW
C SE
PT
IC
VA
UL
T
TO
ILE
B T PA
NT
RY
TO
ILE
T(
FE
MA
LE
)
TO
A ILE
T(
MA
LE
)
R
TE
WA
IN E
MA RC
UP
OM U
FR SO
6
PO
RC
H
4
UP
MP
RA
2
1
GROUND FLOOR
WATER LINE ISOMETRIC VIEW
A B C D
A B C D LEGEND
CF
WP
SEPTIC VAULT
PB
FIRE
EXIT
6 6 Sa
Sa Sfc
a
PB
a a S3W
b a b b
d c d c f e f e
b Sa a
Sab
03
b b Sa Sa
b
Sab a
Sab Sa Sab
d c d c a a f e f e a
b a SPO
d d d Sa
5 5
Scd a a
b a b a b a b d c d c
Sab Sab c c c e f e
b b Sab
01 01
b a b a b d c d c
d d a d d d e f e
4 4 Sef C D
TOILET Scd
Sab
c c 04 a b a b a
b a b a c c c e f e
a
b b
Sab
Sab b
b a b a d d b a b a
d d d e f e
4 S3w
Scd
Sef
3 3 Sab S3w a a
04
c c
UP
c c c a a a
b a b a b Scd b b a b a
Sab
Sab
DN
Sab
Sa b
a a
02
3
DN
02
b a b a b a b a b
a a
a a
2 03
2
RAMP UP
2
1 1 ROOFDECK
LIGHTING LAYOUT
SEPTIC VAULT
FIRE
EXIT
6 6 06
TOILET (FEMALE)
TOILET (FEMALE)
TOILET
TOILET (MALE)
PB
TOILET (MALE)
11
ACU
LEGEND
05
5 05
5 CF
17
ACU
12 09
09
ACU
ACU
WP
06
4 4 PB
TOILET
10
13 10 Sfc
ACU
ACU
S3W
16
ACU
Sab
Sa
3 3
SPO
UP
08
14
ACU
ACU
DN
08
2 2
RAMP UP
1 1
125AT 20AT
DP 1 2 L.O
20AT 20AT
L.O 3 4 L.O
20AT 20AT
L.O 5 6 C.O
20AT 20AT
C.O 7 8 C.O
20AT 20AT
C.O 9 10 C.O
20AT 20AT
A.C.U 11 12 A.C.U
20AT 20AT
A.C.U 13 14 A.C.U
20AT 20AT
A.C.U 15 16 A.C.U
20AT 20AT
SPARE 17 18 SPARE
PANEL DIAGRAM
FROM GF DP
20AT 20AT
L.O 1 2 L.O
20AT 20AT
L.O 3 4 L.O
20AT 20AT
C.O 5 6 C.O
20AT 20AT
C.O 7 8 C.O
20AT 20AT
A.C.U 9 10 A.C.U
RISER DIAGRAM 20AT 20AT
A.C.U 11 12 SPARE
PANEL DIAGRAM