M/s. ZetKO-DKV Technik (INDIA) Private Limited Purchase Order Number: VJNR/P00009/CAP/C/4700078591 Date:28/08/2019
Customer : JSW Steel Limited
5 Spool cover OK
HYDRAULIC HOSE
1 Power Pack structure Hoses OK
2 Boom Structure Hoses OK
3 Slew structure Hoses OK
CABIN
1 Leakages None
GUAGES PRESSURE/TEMPERATURE
1 Hydraulic Guages OK
STRUCTURE
1 Leakage from Slew bearing seal None
2 Condition of grease Normal
3 Boom lug/cylinder lug welding Normal Counter Weight can be
adjusted by adding additional
4 Upper frame weld Normal Weight Plates
5 Lower frame weld Normal
6 Counter weight nuts Normal 2 nos fitted
HYDRAULIC CYLINDERS
1 Condition Boom Tilt cylinder Normal 2 nos of Cylinders
FRONT ATTACHMENT
1 Condition of Boom OK
a Condition of Boom Chain Normal
b Condition of Boom Motor Sprocket OK
c Boom Motor Normal
2 Linkages
a Boom pin OK
b Boom Tilt cylinder pin OK
c Boom Tilt cylinder rod eye pin OK
PERFORMANCE CHECK
SPEEDS
1 Engine / Motor RPM Normal 1480 +/- 30 RPM
2 Boom Traction speed Normal 2.7sec./3mtrs.
3 Slew speed Normal 1mtr./ sec.
OTHERS
1 Paint condition OK
2 Heat Protective Shield OK
Heat Protective Shield are
3 Any damages None installed to Protect Boom
4 Racking Plate condition OK Cylinders, Electrical Motor and
Boom Racking Motor
5 Any External Hits None
6 Machine cleanliness OK
M/s. ZetKO-DKV Technik (INDIA) Private Limited Purchase Order Number: VJNR/P00009/CAP/C/4700078591 Date:28/08/2019
Customer : JSW Steel Limited
5 Spool cover OK
Upper compartment of Power
6 Placement
Pack
HYDRAULIC HOSE
1 Power Pack structure Hoses OK
2 Boom Structure Hoses OK
3 Slew structure Hoses OK
CABIN
1 Leakages None
GUAGES PRESSURE/TEMPERATURE
1 Hydraulic Guages OK
STRUCTURE
1 Leakage from Slew bearing seal None
2 Condition of grease Normal
3 Boom lug/cylinder lug welding Normal Counter Weight can be
adjusted by adding additional
4 Upper frame weld Normal Weight Plates
5 Lower frame weld Normal
6 Counter weight nuts Normal 2 nos fitted
HYDRAULIC CYLINDERS
1 Condition Boom Tilt cylinder Normal 2 nos of Cylinders
FRONT ATTACHMENT
1 Condition of Boom OK
M/s. ZetKO-DKV Technik (INDIA) Private Limited Purchase Order Number: VJNR/P00009/CAP/C/4700078591 Date:28/08/2019
Customer : JSW Steel Limited
5 Spool cover OK
Upper compartment of Power
6 Placement
Pack
HYDRAULIC HOSE
1 Power Pack structure Hoses OK
2 Boom Structure Hoses OK
All Steel Pipes are SS make
3 Steel Pipes OK
4 Slew structure Hoses OK
CABIN
1 Leakages None
GUAGES PRESSURE/TEMPERATURE
1 Hydraulic Guages OK
STRUCTURE
1 Leakage from Slew bearing seal None
2 Condition of grease Normal
3 Boom lug / cylinder lug welding Normal Counter Weight can be
adjusted by adding additional
4 Upper frame weld Normal Weight Plates
5 Lower frame weld Normal
6 Counter weight nuts Normal 2 nos fitted
HYDRAULIC CYLINDERS
1 Condition Boom Tilt cylinder Normal 2 nos of Cylinders
ATTACHMENT
1 Condition of Boom OK
a Boom Weld OK