You are on page 1of 6

SBS

Report for: Reederei, Claus Peter Offen SCANDINAVIAN BOILER SERVICE, Inc.
Hamburg, Germany Norfolk, Branch Office
813 Keeling Dr
Chesapeake, VA 23322
USA

SBS-US order no : 12-10103 Phone: +1 757 546 2358


Your reference no: Fax: +1 757 546 3647
Our report no: Sr. PL 12-10103 E-mail petter@sbs-us.com
Web: www.sbs-us.com
Date: 13-Aug-12
Perform by: Petter Leer

SERVICE REPORT
M/T Cap Palmerston
Type of visit
Service
1.0 Boiler data general information

Boiler make : Aalborg Boiler


Type & no : Vertical Composite Boiler
Mission OC
No 16669
AA 739757
Output : 2500 / 2500 Kg/H
Year build / O. no : May 2007
Steam press : DP 9.0 Bar , WP 7.0 Bar

Oil burner : Oilon Burner


Type/No./Year : KBO-R15M, No 06117513
Fuel type/press : HFO/DO 64/190 Kg/h
Atomizing medium: Air

Vessel/Co. : M/T Cap Palmerston, Ex San Alberto


Yard/Newb. : Hyundai Mipo Dockyard Co. Ltd., Hull No 4002, IMO 9344643
Owner :
Customer. : Reederei, Claus Peter Offen
Cont. person : CE
Visit type : Service
Class. : GL

Departure on : Aug 07 2012


Waiting hours
Return on : Aug 13 2012
Comments to
Traveling time : Freeport, Bahamas

Working hours : See service Certificate

2
2.0 Background for the visit:
2.1 Dry Dock
Boiler / burner overhaul and inspection

3.0 Service performed:


3.1 The boiler / burner were inspected and open on smoke and fire side

There was soot collected on the smoke side, and the cleaner had to repeat cleaning
in order to get the pin tube clean

The oil fired side was looking descent clean at top and bottom, but when hand lamp
was put in to furnace it was not possible to see any light in the top

Before cleaning, no light was passing through pin tube

Shipyard was cleaning all 6 pin tubes inside the oil-fired side of the boiler. The 2 aft
tubes they had to cleaned several times before they were cleaned to a point that light
from the bottom was indicating the hole way around the pin tube

After cleaning bottom After cleaning top

There was scale indication on boiler tube water side and it is recommended to have
the boiler asset out within the next 1 to 2 years

3
1 mm scale can reduce boiler efficiency with up to 40 %
There was no scale on the water side in the boiler on Cap Palmerston

Boiler pin tube condition Boiler tube condition

Burner annuals ring condition was good and no refractory needed to be replaced
here

Burner annuals ring Burner floor

On the boiler floor there was a lot of loose material that was collected and cleaned
out

3.2 Heating on burner HFO supply system was tested


There is 5 heating element + 2 main fuel heater

No Heating Location Remarks


1 Solenoid valve 1.4 KΩ OK
2 Flex hose supply 1.4 KΩ OK
3 Flex hose return - MΩ Burned, do not work
4 Oil pump 1.5 KΩ OK
5 Heat tracing 1.4 KΩ OK
6 Heat tracing 0.98 KΩ OK

4
One Heating element was not working, this is on the return line from burner and not
that important, the valve for return is under normal operation closed so there is no
oil flow to cool the heater, this is the reason it is burned
Flex hose heating Part No B485T01 cost US$ 565.00

3.3 The following alarm and shut down was tested

No Text Status Note


1 2 X EM stop, boiler , ECR OK Cut power for panel
2 High Steam prsess OK
3 High Steam press main engine Not in use
slow down
4 Low steam pressure OK
5 Low water OK Electronic
6 Low Low water cut 51A1 OK Mechanical
7 Low Low Water cut 51A5 OK Mechanical
8 Low Low water cut OK Electronic
9 Low fuel pressure OK
10 Burner swing out OK
11 Flame failure 1 OK
12 Flame failure 2 OK
13 HFO temp high 1 OK
14 HFO temp high 2 OK
15 Low combustion failure OK
16 High exhaust gas temp OK
17 Blower motor overload OK
18 Fuel pump 1 overload OK
19 Fuel pump 2 overload OK
20 Heater overload OK
21 Chemical pump overload OK
22 Control voltages overload OK
23 Quick closing valve, shut off OK
24 Saliometer * Not working
25 Oil in water contends high OK
26 High HFO temp ECR OK 150 C Alarm only
27 Low HFO temp ECR OK 105 C Alarm only
28 Exhaust gas high temp OK ECR
Economizer only

*Parts already on order by ship

5
Pressure settings

No Text Status
1 Low press alarm 5.0 Bar
2 Burner start 6.2 Bar
3 Working pressure 7.0 Bar
4 Stop burner 7.5 Bar
5 High Press 8.0 Bar

Level settings

No Text Status
1 High level +150
2 Normal level 0
3 Low level mission panel 4-20mA, alarm -150
4 Low Low level mission panel 4-20mA -180
5 Low Low level mechanical shut down -200
6 Low Low level mechanical Shut down -200

The burner fuel pressure and temperature was set


Pressure at burner was adjusted
The O2 level was high from burner but soot ppm was in min load 100 ppm and in
max 12 ppm smoke.
visual indication is when it is over 120 ppm smoke

Fuel temperature should be about 130 C

There is 2 flame control unit, they are supposed to indicate orange when flame is
present. Both unit is in working condition but one of them do not indicate flame but
it is activating when flame is there and closing the shut down loop and will open
when flame is going out

3.5 Soot remover


There was request from ship regarding soot remover
Soot remover is only working if it is maintain on regular basic on a clean boiler, this
will quote the steel, so that soot don’t bind to hot steel

Regarding to chemical dosing, at start up the water need 2.5 L to 5.0 L for ea ton of
water in the boiler