Professional Documents
Culture Documents
Report for: Reederei, Claus Peter Offen SCANDINAVIAN BOILER SERVICE, Inc.
Hamburg, Germany Norfolk, Branch Office
813 Keeling Dr
Chesapeake, VA 23322
USA
SERVICE REPORT
M/T Cap Palmerston
Type of visit
Service
1.0 Boiler data general information
2
2.0 Background for the visit:
2.1 Dry Dock
Boiler / burner overhaul and inspection
There was soot collected on the smoke side, and the cleaner had to repeat cleaning
in order to get the pin tube clean
The oil fired side was looking descent clean at top and bottom, but when hand lamp
was put in to furnace it was not possible to see any light in the top
Shipyard was cleaning all 6 pin tubes inside the oil-fired side of the boiler. The 2 aft
tubes they had to cleaned several times before they were cleaned to a point that light
from the bottom was indicating the hole way around the pin tube
There was scale indication on boiler tube water side and it is recommended to have
the boiler asset out within the next 1 to 2 years
3
1 mm scale can reduce boiler efficiency with up to 40 %
There was no scale on the water side in the boiler on Cap Palmerston
Burner annuals ring condition was good and no refractory needed to be replaced
here
On the boiler floor there was a lot of loose material that was collected and cleaned
out
4
One Heating element was not working, this is on the return line from burner and not
that important, the valve for return is under normal operation closed so there is no
oil flow to cool the heater, this is the reason it is burned
Flex hose heating Part No B485T01 cost US$ 565.00
5
Pressure settings
No Text Status
1 Low press alarm 5.0 Bar
2 Burner start 6.2 Bar
3 Working pressure 7.0 Bar
4 Stop burner 7.5 Bar
5 High Press 8.0 Bar
Level settings
No Text Status
1 High level +150
2 Normal level 0
3 Low level mission panel 4-20mA, alarm -150
4 Low Low level mission panel 4-20mA -180
5 Low Low level mechanical shut down -200
6 Low Low level mechanical Shut down -200
There is 2 flame control unit, they are supposed to indicate orange when flame is
present. Both unit is in working condition but one of them do not indicate flame but
it is activating when flame is there and closing the shut down loop and will open
when flame is going out
Regarding to chemical dosing, at start up the water need 2.5 L to 5.0 L for ea ton of
water in the boiler