RENCANA ANGGARAN BIAYA PEKERJAAN BAJA TPPAS NAM

NO URAIAN VOLUME SATUAN

A CANOPY DEPAN UK.3 x 23 m ( 1 SISI )

1 Base plat tebal 12 mm uk.20x20 cm 56.39 kg


2 Kolom 2 CNP 150 x 50 x 20 x 2,3 mm t 5 m 350.00 kg
3 Kolom 2 CNP 150 x 50 x 20 x 2,3 mm t 4 m 280.00 kg
4 Kuda - kuda 2 CNP 150 x 50 x 20 x 2,3 mm 210.00 kg
5 Balok depan dan belakang 2 CNP 150 460.00 kg
6 Gording CNP 125 x 50 x 20 x 2,3 mm 517.50 kg
7 Dudukan gording siku 60x60 15.93 kg
Trextang besi beton 12 mm panjang 1 m 24.00 bh
8 ujungnya mur baut
9 Atap spandek tebal 0.30 mm ex.UNION 69.00 m2
10 Bracing besi d.16 mm 8.00 bh
11 Spanscrup M 16 8.00 bh
12 Cat dasar zynchromate 1,889.81 kg
11 Cat dasar finishing 1,889.81 kg
12 Mobilisasi 1.00 ls
13 Scafolding + Catwalk 8.00 set

JUMLAH TOTAL

NO URAIAN VOLUME SATUAN

B CANOPY BELAKANG UK.3 x 23 m ( 2 SISI )

1 Base plat tebal 12 mm uk.20x20 cm 112.78 kg


2 Kolom 2 CNP 150 x 50 x 20 x 2,3 mm t 5 m 700.00 kg
3 Kolom 2 CNP 150 x 50 x 20 x 2,3 mm t 4 m 560.00 kg
4 Kuda - kuda 2 CNP 150 x 50 x 20 x 2,3 mm 420.00 kg
5 Balok depan dan belakang 2 CNP 150 920.00 kg
6 Gording CNP 125 x 50 x 20 x 2,3 mm 1,035.00 kg
7 Dudukan gording siku 60x60 31.85 kg
Trextang besi beton 12 mm panjang 1 m
8 ujungnya mur baut 48.00 bh

9 Atap spandek tebal 0.30 mm ex.UNION 138.00 m2


10 Bracing besi d.16 mm 16.00 bh
11 Spanscrup M 16 16.00 bh
12 Cat dasar zynchromate 3,635.00 kg
13 Cat dasar finishing 3,635.00 kg
14 Mobilisasi 1.00 ls
15 Alat bantu Scafolding 16.00 set

JUMLAH TOTAL

NO URAIAN VOLUME SATUAN

C CANOPY SAMPING UK.11.45 X 48 M

1 Base plat tebal 12 mm uk.25 X 45 cm 181.25 kg


2 Kolom belakang WF 250 1,630.37 kg
3 Kolom depan WF 250 1,252.08 kg
4 Kuda - kuda WF 250 2,397.60 kg
5 Kuda - kuda WF 200 278.40 kg
6 Potongan WF 250 79.92 kg
7 Balok depan dan belakang Wf 200 4,262.40 kg
8 Gording CNP 125 x 50 x 20 x 2,3 mm 2,168.00 kg
9 Dudukan gordeng siku 60x60 40.95 kg
10 Atap spandek tebal 0.30 mm ex.UNION 576.00 m2
11 Bracing besi d.16 mm 120.00 bh
12 Spanscrup M 16 10.00 bh
13 Trextang besi beton 12 mm panjang 1 m 126.00 bh
ujungnya mur baut
14 Joint plat 10 mm 72.81 kg
29.13 kg
64.72 kg
15 Baut HTB M 16 mm 312.00 bh
16 Cat dasar zynchromate 12,068.77 kg
17 Cat dasar finishing 12,068.77 kg
18 Mobilisasi 1.00 ls
19 Sewa Crane mobil 2.00 ls
20 Alat bantu Scafolding 10.00 Set

JUMLAH TOTAL

NO URAIAN VOLUME SATUAN

D TUTUP CLADING DEPAN DAN BELAKANG


( 3 SISI )
1 Base plat tebal 12 mm uk.20x20 cm 72.50 kg
2 Joint plat pipa d.6 inch 190.31 kg
3 Baut HTB 16 mm 216.00 bh
4 Pipa d.6 inchi tebal 6 mm lengkungan 2,493.00 kg
5
Bending Pipa d.6 inchi tebal 6 mm 2,493.00 kg
lengkungan
6 Pipa d.6 inchi tebal 6 mm bagian bawah 1,994.40 kg
7 Pipa d.2 inchi tebal 3.9 mm 979.20 kg
8 Atap spandek tebal 0.4 mm ex.UNION 207.00 m2
9 Cat dasar zynchromate 5,729.41 kg
10 Cat dasar finishing 5,729.41 kg
11 Mobilisasi 1.00 ls
12 Alat bantu Scafolding 1.00 set
13 Sewa Crane mobil 1.00 ls

JUMLAH TOTAL

REKAPITULAS

NO URAIAN PEKERJAAN

A CANOPY DEPAN UK.3 x 23 m ( 1 SISI )


B CANOPY BELAKANG UK.3 x 23 m ( 2 SISI
C CANOPY SAMPING UK.11.45 X 48 M
D TUTUP CLADING DEPAN DAN BELAKANG

JUMLAH
GARAN BIAYA PEKERJAAN BAJA TPPAS NAMBO

HAGA SATUAN HARGA SATUAN JUMLAH HARGA JUMLAH HARGA


BAHAN UPAH BAHAN UPAH

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

H TOTAL - -

HAGA SATUAN HARGA SATUAN JUMLAH HARGA JUMLAH HARGA


BAHAN UPAH BAHAN UPAH

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

H TOTAL - -

HAGA SATUAN HARGA SATUAN JUMLAH HARGA JUMLAH HARGA


BAHAN UPAH BAHAN UPAH

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

H TOTAL - -

HAGA SATUAN HARGA SATUAN JUMLAH HARGA JUMLAH HARGA


BAHAN UPAH BAHAN UPAH
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

H TOTAL - -

REKAPITULASI RAB

JUMLAH HARGA JUMLAH HARGA


URAIAN PEKERJAAN
BAHAN UPAH

CANOPY DEPAN UK.3 x 23 m ( 1 SISI ) - -


CANOPY BELAKANG UK.3 x 23 m ( 2 SISI ) - -
CANOPY SAMPING UK.11.45 X 48 M - -
TUTUP CLADING DEPAN DAN BELAKANG - -

JUMLAH - -